BacTech Environmental Corporation ("BacTech") (CSE:BAC)(OTC:BCCEF) (WKN: A1H4TY)
announced today the initial flotation results for the Telamayu tailings project
located in Potosi state, Bolivia.


BacTech enlisted the services of SGS Bolivia S.A. to oversee the sampling of
some 2,000 bags of tailings assembled by COMIBOL, the Bolivian state mining
company. In essence material was bagged at 1 meter intervals by COMIBOL from 8
test holes of roughly 10 meters in depth. A "pipe" was used to extract a sample
from every bag and a larger sample of 200 kg was created. This larger sample was
bagged and secured at site before making its way to Lima, Peru. From there, the
samples were shipped to Inspectorate Exploration and Mining Services Ltd. in
Vancouver, Canada. The Company has not investigated or verified the sampling
program conducted by COMIBOL.


Assay chart



----------------------------------------------------------------------------
Element        Unit                                   Telamayu Tailing Comp.
----------------------------------------------------------------------------
Ag             g/mt                                                    275.0
----------------------------------------------------------------------------
Au             g/mt                                                      .24
----------------------------------------------------------------------------
As             ppm                                                      3145
----------------------------------------------------------------------------
Sb             ppm                                                    953.61
----------------------------------------------------------------------------
Cu             ppm                                                     22417
----------------------------------------------------------------------------
Bi             ppm                                                    557.97
----------------------------------------------------------------------------
Sn             ppm                                                    1571.8
----------------------------------------------------------------------------



Flotation results



----------------------------------------------------------------------------
                               Max.metal recovered                          
Element                             to concentrate                 Recovery 
----------------------------------------------------------------------------
Ag                                         35 oz/t                    60-64%
----------------------------------------------------------------------------
(i)Cu                                      4.2-4.4%                   33-35%
----------------------------------------------------------------------------
As                                            0.65%                     n/a 
----------------------------------------------------------------------------



(i)Copper recovery is 33-35% of the remaining unoxidized sulphides in the tailings.

It was noted that roughly 50% of the sulphides in the sample had been oxidized.
Two rougher kinetic flotation tests were carried out on the sample at different
grinds to evaluate the tailings response to flotation. Results from these
preliminary tests showed that after four stages of rougher flotation
approximately 15% of the material was removed to a bulk rougher concentrate
assaying 31-35oz/t silver (60-64% recovery), 4.2-4.4% (33-35% recovery) copper
and 0.65% arsenic. Additional tests will be undertaken to attempt to improve the
recoveries for the silver component.


In addition to silver and copper the assays showed significant values reported
for tin, antimony and bismuth. Gravity work will also be undertaken to
compliment this preliminary flotation work. The objective will be to evaluate
possible benefits of applying both techniques for upgrading metals of value into
concentrates for further treatment. For example the tin grade of the sample was
assayed at 0.157% equating to 3,900 tonnes of contained tin (current price
$23,500/t).


The copper recovery into concentrate at first glance would appear to be
disappointing but upon further investigation it appears that approximately one
half of the copper was extracted before flotation into the grind/wash water. If
this is the case then recoveries of up to 80% were achieved if the wash water is
included in the calculation. That is to say an operation may include a washing
process from which the soluble copper is recovered prior to flotation.


BacTech will continue to investigate different approaches combining gravity for
free silver and tin with flotation for silver and copper.


About Telamayu

COMIBOL advised that the tailings at Telamayu were generated by a centralized
milling operation that treated material from 2 local mines, namely Animas and
Seven Suyos. The site contains some infrastructure including an operating rail
line, a power substation, a reliable water source and a plant housing that could
possibly be used to house a flotation circuit. COMIBOL has estimated that there
are approximately 2.3M tonnes of tailings attributable to the above assay
results, and across the river is an additional 3M tonnes of tailings from the
same source, but no work has been initiated there at this time. In addition,
there are 2 additional tailings sites within 50 km that could be investigated in
future.


 The tonnages provided by COMIBOL are of a historical nature and have not been
confirmed by the Company. BacTech is not treating the historical estimate as
current mineral resources or mineral reserves as they are not NI 43-101
compliant. The Qualified Person ("QP") on the press release is Gary Williams,
P.Geo.


BacTech Profile

BacTech Environmental Corporation holds the perpetual, exclusive, royalty-free
rights to use the patented BACOX bioleaching technology for the reclamation of
tailings and mining waste materials. In November 2011, BacTech signed a contract
with the Mines Branch of the Manitoba Department of Innovation, Energy and
Mines, to remediate an arsenopyrite gold stockpile situated at the Snow Lake
Mine in Snow Lake, Manitoba. The Company continues to field enquiries globally
with respect to additional opportunities for remediation.


Follow us on:

Facebook http://www.facebook.com/BacTechGreen

Twitter http://twitter.com/BacTechGreen

LinkedIn http://www.linkedin.com/company/1613873

Vimeo http://vimeo.com/bactechgreen

Youtube http://www.youtube.com/user/bactechgreen

Special Note Regarding Forward-Looking Statements

This news release contains "forward-looking information", which may include, but
is not limited to, statements with respect to future tailings sites, sampling or
other investigations of tailing sites, the Company's ability to make use of
infrastructure around tailings sites or operating performance of the Company and
its projects. Often, but not always, forward-looking statements can be
identified by the use of words such as "plans", "expects", "is expected",
"budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or
believes" or variations (including negative variations) of such words and
phrases, or state that certain actions, events or results "may", "could",
"would", "might" or "will" be taken, occur or be achieved. Forward-looking
statements involve known and unknown risks, uncertainties and other factors
which may cause the actual results, performance or achievements of the Company
to be materially different from any future results, performance or achievements
expressed or implied by the forward-looking statements. Forward-looking
statements contained herein are made as of the date of this news release and the
Company disclaims, other than as required by law, any obligation to update any
forward-looking statements whether as a result of new information, results,
future events, circumstances, or if management's estimates or opinions should
change, or otherwise. There can be no assurance that forward-looking statements
will prove to be accurate, as actual results and future events could differ
materially from those anticipated in such statements. Accordingly, the reader is
cautioned not to place undue reliance on forward-looking statements.


Shares outstanding 48,755,027

The Canadian National Stock Exchange (CNSX) has not reviewed and does not accept
responsibility for the adequacy or the accuracy of the contents of this release.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Ross Orr, President & CEO
BacTech Environmental Corporation
416-813-0303 ext 222
info@bactechgreen.com


Bill Mitoulas, Investor Relations
BacTech Environmental Corporation
416-479-9547
bmitoulas@bactechgreen.com
www.bactechgreen.com

BacTech Environmental (CSE:BAC)
Gráfico Histórico do Ativo
De Out 2024 até Nov 2024 Click aqui para mais gráficos BacTech Environmental.
BacTech Environmental (CSE:BAC)
Gráfico Histórico do Ativo
De Nov 2023 até Nov 2024 Click aqui para mais gráficos BacTech Environmental.