NWTN UAE Electric Vehicle Assembly Facility to Be Completed in Q4
28 Novembro 2022 - 8:30AM
NWTN Inc. (Nasdaq: NWTN), an eco-conscious mobility technology
company bringing passenger-centric green premium mobility solutions
to the world, today announced that construction on its UAE electric
vehicle assembly facility in Khalifa Industrial Zone Abu Dhabi
(KEZAD) is on schedule and will be completed in Q4 of 2022.
NWTN signed a lease agreement with KEZAD Group for
the facility, which measures approximately 270,000 square feet, in
September of 2022 to establish NWTN’s first EV assembly facility in
Abu Dhabi. The facility will serve the growing demand for
sustainable transport options in the Middle East and beyond, and
will play an important role in promoting new energy mobility and
sustainable energy transformation in the UAE and the Middle
East.
Founded in 2016, NWTN is headquartered in the UAE
and aims to integrate avant-garde design, life-style
personalization, IoT connectivity, autonomous driving technology,
and green energy eco-systems to its future mobility solutions.
NWTN plans to initially operate the facility for
manufacturing, research and development, vehicle testing and
logistics area. Since obtaining approval from KEZAD Group for the
required modifications and the industrial license in October, NWTN
has completed 80% of the equipment installation and tooling in the
facility, including the robots used for the vision system and
advanced driver assistance systems (ADAS) calibration. The full
semi-knock down (SKD) management and operations team will be in
place by the middle of December, 2022, and the facility will be
fully operational by the end of this year.
The annual capacity of the facility will initially
be 5,000-10,000 units for the semi-knock down electric vehicles to
meet rapidly increasing demand for new energy vehicles and
sustainable transport options in the UAE and in other nations in
the Middle East and North Africa. In phase two, NWTN will introduce
several new electric vehicle models and expand capacity to 50,000
units annually with an expected start date in the first quarter of
2024.
The development of NWTN’s EV assembly facility has
gained strong support from the UAE government and agencies, and is
fully aligned with UAE’s “Net Zero 2050” strategic initiative that
plans to achieve net-zero emission by 2050 with investments of over
600 billion Dirhams (US$160 billion) in renewable energy and
sustainable technologies. The completion and future expansion of
NWTN’s facility will kick off the long-term development of the
local electric vehicle research and development, manufacturing,
supply chain establishment, and further into innovations in energy
generation, usage, transportation and storage in the region.
With increasing accessibility and affordability of
sustainable energy supported by infrastructures such as NWTN’s
KEZAD plant, the UAE’s transformation towards a sustainable and
intelligent future will be significantly accelerated.
NWTN recently completed a merger with East Stone
Acquisition Corporation, a publicly traded special purpose
acquisition company (SPAC), and was listed on the NASDAQ exchange
on November 14.
ABOUT NWTN
NWTN (Nasdaq: NWTN) is a pioneering green
technology company with a mission to bring premium
passenger-centric mobility and green energy solutions to the world.
Headquartered in Dubai and with its manufacturing facilities in Abu
Dhabi, UAE, NWTN aims to integrate avant-garde design, life-style
personalization, IoT connectivity, autonomous driving technology,
and green energy eco-systems to its future mobility solutions. Its
core technology includes modular pure electric platforms, battery
packing and management technology, a digital on-board connectivity
system, continuously upgraded electric and electronic architecture
as well as autonomous driving technology.
NWTN focuses on growth and development in the
entire value chain of clean energy applications in the UAE and
intends to expand to the Middle East, North Africa, and other
Southeast Asian and European territories.
For further information please
visit: https://www.nwtnmotors.com
For investor enquiries:Michael
Bowennwtnir@icrinc.com
For media enquiries:Edmond
Lococonwtnpr@icrinc.com
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/d68f3e37-78d4-48c9-a0ee-01ae72393b36
NWTN (NASDAQ:NWTN)
Gráfico Histórico do Ativo
De Jan 2025 até Fev 2025
NWTN (NASDAQ:NWTN)
Gráfico Histórico do Ativo
De Fev 2024 até Fev 2025