Pelangio Exploration Inc. (TSX VENTURE:PX)(OTCQB:PGXPF) ("Pelangio" or the
"Company") is pleased to announce the results of 26 additional diamond drill
holes totaling 7,046 metres on four mineralized zones and two new prospects at
the Manfo Property in Ghana. All results from the Company's most recent phase of
drilling have now been released, totaling 37,313 metres in 178 diamond drill
holes. Today's results include exploration holes at Pokukrom East (2), Odumasi
(4) and Pokukrom (3); deeper zone-extensional holes and along strike extensions
at Pokukrom West (7) and Nfante East (1); and in-fill holes at Nfante West (9).
Highlights of the results reported today include:


Exploration Drilling



--  1.05 grams per tonne (g/t) gold over 17.5 metres in SPDD-254 at Pokukrom
    East from 298 metres down hole.



Pokukrom West Depth and Strike Extension Drilling



--  1.01 g/t gold over 10 metres in SPDD-189 from 271 metres down hole; 
--  1.91 g/t gold over 10 metres, including 5 metres of 3.49 g/t, in SPDD-
    191 from 187 metres down hole; 
--  0.73 g/t gold over 16 metres in SPDD-256 from 37 metres down hole, a
    shallow intersection of the Pokukrom West structure, 250 metres south of
    current drilling.



Nfante West In-Fill Drilling



--  1.04 g/t gold over 18 metres in SFDD-234 from 50 metres down hole; 
--  1.03 g/t gold over 16 metres in SFDD-236 from 117 metres down hole; 
--  1.32 g/t gold over 8 metres in SFDD-237 from 41 metres down hole; and 
--  12.31 g/t gold over 2 metres in SFDD-239 from 24 metres down hole. 



To view plans containing the highlighted drill intercepts on the Manfo Property,
see:
http://www.pelangio.com/News/2012/11/08/PELANGIO-REPORTS-REMAINING-RESULTS-FROM-MANFO-PROJECT.aspx#plans
All drill intersections are available on the Pelangio website: www.pelangio.com.


"We are moving towards an initial resource estimate on three of the zones
discovered so far on the Manfo Property at Pokukrom East and West and Nfante
West, which we expect to complete during the first quarter of 2013," stated
Warren Bates, Senior Vice President Exploration. "Today's drilling demonstrates
the further open potential of these zones, with drilling at Pokukrom West
intersecting the deepest mineralization yet encountered on that zone and
mineralization a further 250 metres along strike. We are currently advancing the
other four areas of gold mineralization discovered to date with auger drilling
and trenching in preparation for a drilling program. In addition, we continue to
develop a host of new targets from geophysical and geochemical surveying on
three major structures on the property. We look forward to drilling these
targets for further discoveries in the new year." 


Geological Setting and Results

Pokukrom East: Two holes were drilled to the south of the Pokurom East area to
test for extensions of the Pokukrom East structure and gold mineralization. Hole
SPDD-254 (section 49100N) intersected 1.05 g/t gold over 17.5 metres from 298
metres down hole which may represent another shallow east plunging shoot at
depth within the sericite altered granitoid. Drill hole SPDD-253 completed on
section 48200N, 900 metres farther south, did not intersect significant Pokukom
East mineralization.


Odumasi: On this new exploration area, four holes were drilled along 1,500
metres of strike length. One hole (SODD-248 on section 51630N) intersected 15.0
metres averaging 0.67 g/t gold in sericite altered granitoid. Footwall hematite
alteration was intersected in holes SODD-244 (section 50900N) and SODD-246
(section 51600N), and a fourth hole SODD-252 intersected weak gold in sericite
altered material on section 52400N.


Pokukrom Exploration Area: Three exploration diamond drill holes (SPDD-238,-240
and -242) were completed along 800 metres of strike length. An encouraging
intersection in sericite altered granitoid in hole SPDD-242 (section 51200N)
returned 6.7 metres averaging 0.58 g/t gold from 230.30 metres down hole. Holes
SPDD-238 (section 50450N) and SPDD-240 (section 51200N) encountered no
significant mineralization.


Pokukrom West: Six diamond drill holes tested the down dip extension at depths
of 150-250 metres on sections 49400N, 49450N and 49500N. Two holes (SPDD-191 and
SPDD-193) on section 49400N respectively intersected 10.0 metres at 1.91 g/t
gold from 187 metres down hole (including 5 metres at 3.49 g/t from 188 metres)
and 27 metres at 0.40 g/t from 215 metres down hole in sericite altered
granitoid. On section 49450N drill hole SPDD189 intersected 10.0 metres
averaging 1.01 g/t gold from 271 metres down hole in sericite altered granitoid,
while on section 49500N no significant gold was encountered. 


A seventh Pokukrom West hole (SPDD-256) drilled on section 49100N extended the
Pokukrom West Structure (a magnetic high to low anomaly, and a resistivity high)
250 metres to the south. The hole intersected 16.02 metres averaging 0.73 g/t
gold from 36.98 metres down hole (including 7.0 metres at 1.09 g/t gold from
46.0 metres) in sericite altered granitoid. 


Nfante West: Shallow infill drilling intersected wide (11 to 72 metres), low to
moderate grade mineralization in all nine holes in sericitic granitoid to depths
of 120 metres. 


Nfante East: The Nfante East hole (SPDD-251), a deeper extensional hole to the
south on section 45600N returned 4.0 metres averaging 1.52 g/t gold from 142.0
metres down hole, and 7.0 metres at 0.55 g/t from 222.0 metres, both from a
hematite altered granitoid.


The following table summarizes significant assay results from the drill holes
reported herein:




----------------------------------------------------------------------------
----------------------------------------------------------------------------
Manfo Area                  From     To Core Length(1)                      
                  Hole ID    (m)    (m)            (m)  Gold (g/t)   Section
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Pokukrom East    SPDD-253    NSR    NSR            NSR         NSR     48200
----------------------------------------------------------------------------
                 SPDD-254    298  315.5           17.5        1.05     49100
----------------------------------------------------------------------------
                      and    321    324              3        0.95          
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Odumasi          SODD-244    177    178              1        1.61     50900
----------------------------------------------------------------------------
                 SODD-246    NSR    NSR            NSR         NSR     51600
----------------------------------------------------------------------------
                 SODD-248    145    160             15        0.67     51600
----------------------------------------------------------------------------
                 SODD-252    102    107              5        0.30     52400
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Pokukrom         SPDD-238    NSR    NSR            NSR         NSR     50450
----------------------------------------------------------------------------
                 SPDD-240    NSR    NSR            NSR         NSR     51200
----------------------------------------------------------------------------
                 SPDD-242 230.30    237           6.70        0.58     51200
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Pokukrom West    SPDD-183    NSR    NSR            NSR         NSR     49500
----------------------------------------------------------------------------
                 SPDD-185    185    187              2        1.34     49500
----------------------------------------------------------------------------
                 SPDD-187    NSR    NSR            NSR         NSR     49450
----------------------------------------------------------------------------
                 SPDD-189    271    281             10        1.01     49450
----------------------------------------------------------------------------
                 SPDD-191    187    197             10        1.91     49400
----------------------------------------------------------------------------
                including    188    193              5        3.49          
----------------------------------------------------------------------------
                 SPDD-193    215    242             27        0.40     49400
----------------------------------------------------------------------------
                 SPDD-256  36.98     53          16.02        0.73     49100
----------------------------------------------------------------------------
                including     46     53              7        1.09          
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Nfante West      SFDD-234     12     84             72        0.50     45350
----------------------------------------------------------------------------
                including     50     68             18        1.04          
----------------------------------------------------------------------------
                      and     93    107             14        0.54          
----------------------------------------------------------------------------
                      and    114    119              5        0.60          
----------------------------------------------------------------------------
                 SFDD-236    110    135             25        0.87     45350
----------------------------------------------------------------------------
                including    117    133             16        1.03          
----------------------------------------------------------------------------
                 SFDD-237     31     56             25        0.72     45350
----------------------------------------------------------------------------
                including     41     49              8        1.32          
----------------------------------------------------------------------------
                 SFDD-239     24     26              2       12.31     45450
----------------------------------------------------------------------------
                      and     42    100             58        0.41          
----------------------------------------------------------------------------
                 SFDD-241     26     71             45        0.47     45450
----------------------------------------------------------------------------
                      and     78     90             12        0.41          
----------------------------------------------------------------------------
                      and    106    116             10        0.31          
----------------------------------------------------------------------------
                 SFDD-243      3      5              2        2.32     45450
----------------------------------------------------------------------------
                including    118    147             29        0.42          
----------------------------------------------------------------------------
                      and    119    123              4        1.29          
----------------------------------------------------------------------------
                 SFDD-245     43     84             41        0.37     45550
----------------------------------------------------------------------------
                 SFDD-247     57     60              3        0.44     45550
----------------------------------------------------------------------------
                      and     70    117             47        0.45          
----------------------------------------------------------------------------
                 SFDD-249    132    143             11        0.49     45550
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Nfante East      SFDD-251    142    146              4        1.52     45600
----------------------------------------------------------------------------
                      and    222    229              7        0.55          
----------------------------------------------------------------------------
----------------------------------------------------------------------------
(1) Intervals are core length. Unless otherwise indicated, a cut-off grade  
    of 0.2 g/t gold was used in calculating intervals with allowance for up 
    to five metres of internal dilution.                                    



Drilling Progress and Exploration Outlook

Including the 26 diamond drill holes totaling 7,046 metres reported today,
Pelangio has completed 178 holes totaling 37,313 metres in its second phase
drilling program, of which all 178 holes have now been reported.


Pelangio's exploration focus on the Manfo property is to identify near-surface,
drill ready targets through geochemical sampling and to test and extend such
targets with drilling and geophysical surveying. The Company's aim during 2012
is to prepare an initial resource estimate on the Manfo property while
demonstrating the property's potential to host additional gold bearing zones
with resource potential.


Trenching programs are currently underway at the Sika North prospect, and as
well at Pokukrom East on the Manfo Project, coupled with auger drilling on
selected geochemical targets. Soil geochemical programs are being completed at
the Akroma and Obuasi projects as well.


Quality Assurance/Quality Control and Qualified Person 

The drill holes reported in this press release were drilled using HQ (63.5 mm)
and NQ (47.6 mm) sized diamond drill bits. Company security is provided at the
drill site. Contractors working for Pelangio conducted all logging and sampling.
The core was logged, marked up for sampling using standard lengths of one metre,
then divided into equal halves using a diamond saw. One half of the core was
left in the original core box and stored in a secure location at the Pelangio
compound in Tepa, Ghana. The other half was sampled, placed into sealed bags and
securely stored at the site until it was shipped to the ALS Chemex laboratory in
Kumasi, Ghana. The core was dried and crushed by ALS Chemex and a 150 gram pulp
was prepared from the coarse crushed material. ALS Chemex conducted routine gold
analysis using a 50 gram charge and fire assaying with atomic absorption finish.
Quality control procedures included the systematic insertion of blanks,
duplicates and sample standards into the sample stream at the rate of one per
every 20 samples. In addition, ALS Chemex inserted one preparation blank and a
certified reference sample in for every 20 samples, and ran one duplicate
analysis every 20 samples.


The exploration program at the Manfo Property is overseen by Warren Bates, P.
Geo. (Ontario), a Qualified Person within the meaning of National Instrument
43-101. Mr. Bates has verified and approved the data disclosed in this release,
including the sampling, analytical and test data underlying the information.


About Pelangio 

Pelangio successfully acquires and explores camp-sized land packages in
world-class gold belts, while using innovative corporate restructuring to
maximize shareholder value. The Company primarily operates in Ghana, West
Africa, an English-speaking, common law jurisdiction that is consistently ranked
amongst the most favourable mining jurisdictions in Africa. The Company is
exploring two 100%-owned camp-sized properties: the 100 km2 Manfo Property, the
site of seven recent near-surface, high grade and bulk tonnage, gold
discoveries, and the 290 km2 Obuasi Property, located four kilometres on strike
and adjacent to AngloGold Ashanti's prolific, high-grade Obuasi Mine, which has
produced over 30 million ounces of gold since 1897.


Forward Looking Statements

Certain statements herein may contain forward-looking statements and
forward-looking information within the meaning of applicable securities laws and
such statements and information may be based on numerous assumptions.
Forward-looking statements and information include statements regarding the
Company's exploration plans and exploration results with respect to the Manfo
Property and the Obuasi Property, and are subject to forward-looking risks,
uncertainties and other factors which may cause the Company's actual results,
performance or achievements, or industry results, to be materially different
from any future results, performance or achievements expressed or implied by
such forward-looking statement or information. Accordingly, readers should not
place undue reliance on forward-looking statements or information. See the
Company's annual information form, annual and quarterly financial statements and
management's discussion and analysis for additional information on risks and
uncertainties relating to the forward-looking statement and information. The
Company undertakes no obligation to reissue or update any forward-looking
statements or information except as required by law. All forward-looking
statements and information herein are qualified by this cautionary statement.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Pelangio Exploration Inc.
Ingrid Hibbard
President & CEO
905-875-3828 / Toll-free: 1-877-746-1632


Pelangio Exploration Inc.
Warren Bates
Senior Vice President Exploration
905-875-3828 / Toll-free: 1-877-746-1632


Pelangio Exploration Inc.
info@pelangio.com
www.pelangio.com
Twitter @PelangioEx

Pelangio Exploration (TSXV:PX)
Gráfico Histórico do Ativo
De Mai 2024 até Jun 2024 Click aqui para mais gráficos Pelangio Exploration.
Pelangio Exploration (TSXV:PX)
Gráfico Histórico do Ativo
De Jun 2023 até Jun 2024 Click aqui para mais gráficos Pelangio Exploration.