Pensana Plc Technical Due Diligence Report on Longonjo
24 Janeiro 2024 - 4:00AM
UK Regulatory
TIDMPRE
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION
Pensana Plc ("Pensana" or the "Company")
Technical Due Diligence Report on Longonjo
Pensana (LSE:PRE) is pleased to advise that the technical due diligence report
on the Longonjo rare earth project in Angola (the Project or Longonjo) has been
reported by The Mineral Corporation (TMC) to ABSA Capital (ABSA) as the Mandated
Lead Arranger for potential debt funding of the Project.
A summary of TMC's key findings:
The Project is located approximately 320km east of the Port of Lobito and
envisages the open pit mining and processing of near surface Rare Earth Elements
(REE) bearing carbonatite ores to produce a mixed REE carbonate (MREC)
concentrate which will then be marketed commercially.
The holder of the Mineral and Mining Rights over the Longonjo mining licence
area is the Angolan registered company Ozango Minerais S.A. (Ozango), which is
84% owned by Portugal domiciled subsidiaries of Pensana. The balance of Ozango
is held by the Angolan Sovereign Wealth Fund and two Angolan partners.
Longonjo will comprise an open pit mine to recover near surface REE, which will
then be processed via concentration and downstream refining to produce a
commercially saleable Mixed Rare Earth Carbonate (MREC) concentrate for export
via the Port of Lobito to third-party offtakers for the purpose of ultimately
producing Neodymium/Praseodymium (NdPr) feed into the renewable energy and
electric vehicle markets.
A nominal plant feed of 0.8Mtpa has been specified at a TREO feed grade of 4.12%
and an NdPrO feed grade of 0.9%. The stockpiling and blending strategy critical
to achieving stable and consistent concentrator performance and product has been
identified and included in the mining and processing flowsheets. The plant
design is nominally based on a dry concentrate feed of approximately 59ktpa, to
produce a nominal MREC dry product of 19.6ktpa (15ktpa normal operating
conditions).
Whilst TMC is of the opinion that ramp-up to achieve design recoveries will be
challenging, and the ongoing operational control of the processing plants will
be critical to maintaining product quality and recovery, TMC notes no fatal
flaws in terms of the revised bankable feasibility study (BFS) review and no
material technical divergences from the level of study required for bank funding
approval.
TMC noted the capital estimate provided is extremely detailed and based on bills
of quantities and tendered prices with a capital base date of Q4 2023. An
accuracy assessment was also carried out, which confirms the level of accuracy
complies with that required by a BFS standard. TMC is of the opinion that
sustaining capital may be slightly understated however this does not present a
material risk to the Project.
Capital Cost Breakdown
+---------------------------------+--------------+
|Concentrator Plant |US$37 766 993 |
+---------------------------------+--------------+
|Plant Common Areas |US$14 687 930 |
+---------------------------------+--------------+
|TSF |US$7 157 201 |
+---------------------------------+--------------+
|Recovery Plant |US$75 472 541 |
+---------------------------------+--------------+
|Plant Infrastructure |US$15 568 988 |
+---------------------------------+--------------+
|Project Infrastructure |US$123 386 |
+---------------------------------+--------------+
|Mine Infrastructure |US$9 707 348 |
+---------------------------------+--------------+
|Environmental |US$4 538 590 |
+---------------------------------+--------------+
|Security |US$1 767 680 |
+---------------------------------+--------------+
|Site Infrastructure |US$7 001 150 |
+---------------------------------+--------------+
|Indirect Costs |US$22 640 254 |
+---------------------------------+--------------+
|Contingency |US$20 100 933 |
+---------------------------------+--------------+
|Total Project Capital Expenditure|US$216 532 994|
+---------------------------------+--------------+
The capital estimate was derived from the various currencies relating to the
goods and services costs in the country of origin and adjusted for the relevant
exchange rates: US$ South African Rand ZAR 18.5, European Euro EUR 0.9,
Australian Dollar AUD 1.5 and Angolan Kwanza AOA 830.
TMC notes the level of detail provided in the detailed capital estimate
consisting of in excess of 18,000 line items, the methodology undertaken to
produce the capital estimate and the basis of estimate being predominantly based
on bills of quantity, tendered rates and budget quotations.
Operating Cost Estimates have been updated based on the revised Project scope
and also brought to a consistent cost base date of Q4 2023. TMC has reviewed all
of the operating cost centre data and concurs that the operating cost estimates
as provided meet the accuracy levels associated with a BFS, however it is noted
that the retender for the mining contract scheduled for late 2024 will impact on
overall Project economics and in all likelihood trigger the requirement for a
revision of the mining optimisation plan.
TMC notes that the financial model as received is detailed in all modelled
inputs and results in free cash flow levels which would be likely to support a
funding decision. TMC reiterates the sensitivity of the Project economics to the
forecast rare earth oxide prices and recommends that the imminent offtake
agreements and pricing structures should be included in any funding agreement as
Conditions Precedent. Once these are available the Project financial model
should be updated, and the economics revised. The Project economics are most
sensitive to projected market dynamics and the resulting product pricing
projections, which in turn present the most material risk to Project economics.
Earthworks and civils contractors established site in November 2022. Servitude
bush clearing and pylon installations to the borehole pumps, contractors camp,
main camp and water treatment plant were in progress at the time of the site
visit at the end of February 2023. Overall, the level of detail design of the
infrastructure is commensurate with the requirements of the BFS and TMC is of
the opinion that the infrastructure design is appropriate and fit for purpose to
support the mining and processing operations.
TMC is of the opinion that the level of work undertaken for the project schedule
and plan of execution is commensurate with the requirements of a BFS and the
work undertaken is comprehensive and will be the basis for a potential
successful project execution.
Extensive work has been undertaken in the areas of social and community
engagement. TMC supports the programmes and costs which have been allocated to
the various social initiatives, however notes that the Relocation Action Plan
still requires careful monitoring and management to ensure successful
implementation, minimising community grievances. Ozango's engagements and
initiatives now comply with the expectations associated with a BFS level of
study and in some instances exceed expected levels.
TMC notes that all legislative aspects of Human Resources management have been
addressed adequately, however it does recommend that remuneration levels are
reviewed prior to the commencement of recruitment, as the budgeted levels may
mitigate against the procurement of top level individuals, particularly in the
senior technical expatriate roles. The BFS meets expected levels of detail in
terms of all HR, operational readiness and occupational health and safety
aspects. It is noted that specific operational readiness planning is only
expected at the next stage of the Project.
Tim George CEO commented: "We are very grateful to Russel Heins and the team at
The Mineral Corporation team for the diligent and extremely thorough review of
all aspects of the Longonjo project undertaken in their role as lead Technical
Advisor to ABSA as the Mandated Lead Arranger and we are pleased with the
positive recommendations.
The review was based on the re-engineered, reduced capital cost of the project
for financing purposes following our review in Q2 of 2023. A huge amount of work
has gone into the capital cost estimate which as noted by Russell and the team
is based on very detailed estimates and we are pleased that despite the current
inflationary and cost pressures the estimate has been confirmed around US$217
million, which includes US$20 million in contingency.
As previously announced, once the Longonjo operations are operational and fully
commissioned it is our intention to expand production to around 40,000 tonnes of
MREC per annum which will require an additional capital cost of around US$100
million which is expected to be incurred around year three of the initial
operations.
Whilst this technical review has been underway, we have been working closely
with our financiers ABSA, FSDEA and others and we expect to be in a position to
announce the financing arrangements shortly."
About The Mineral Corporation
The Mineral Corporation (TMC) was established in Johannesburg, South Africa in
1997 and is home to a well-informed, globally-focused corporate and technical
advisory team of mining sector professionals. TMC have expertise in mineral
exploration, geology, mining engineering and development, mineral processing,
mining infrastructure, ESG, statutory compliance, mineral asset valuation and
techno-economic modelling.
TMC understand that exploration and mining can be high risk industries and are
confident that their skills can be applied to identify, resolve and minimise
their clients exposure to such risk, thereby creating or preserving value.
TMC cover all minerals, including precious metals, base metals, noble and
refractory metals, energy minerals (coal and uranium), mineral sands, precious
and semi-precious stones, rare earth elements and industrial minerals.
Since inception, TMC has created or preserved many billions in various
currencies (including rand, dollar, pounds) on behalf of clients. Their business
model is founded on the qualification and quantification of mineral investment
opportunities. TMC assemble teams of expert multi-disciplinary consultants who
collectively craft an integrated business model to evaluate clients'
enterprises. TMC's group of professionals offers knowledge from six continents
but enjoys a particular passion for Africa. In many circumstances, TMC's
imaginative, but always realistic, examination of mineral projects offers
distinctive solutions to the complex alternatives that challenge investors.
TMC also provide bespoke institutional research on the mining industry.
The information contained within this announcement is considered by the Company
to constitute inside information as stipulated under the Market Abuse
Regulations (EU) No.596/2014. Upon the publication of this announcement via a
Regulatory Information Service, this inside information will be considered to be
in the public domain. The person responsible for arranging for the release of
this announcement on behalf of the Company is Paul Atherley, Chairman.
- ENDS -
For further information, please contact:
Shareholder/analyst enquiries:
Pensana Plc
Paul Atherley, ChairmanIR@pensana.co.uk
Tim George, Chief Executive Officer
Rob Kaplan, Chief Financial Officer
This information was brought to you by Cision http://news.cision.com
END
(END) Dow Jones Newswires
January 24, 2024 02:00 ET (07:00 GMT)