Cassidy Gold Corp. (TSX VENTURE:CDY) is pleased to announce results from reverse
circulation (RC) drilling on its 100%-owned Kouroussa Gold Project, located in
Guinea, West Africa. Infill drilling at the Sanu Filanan deposit totals 2,027
metres in 16 RC holes so far in 2008. Highlights include 22.48 g/t Au over 15.0
metres in KRC1510, 13.31 g/t Au over 5.0 metres in KRC1511, 10.06 g/t Au over
7.0 metres in KRC1512, and 10.19 g/t Au over 10.0 metres in KRC1529. True widths
are approximately 70% of reported intervals.


Sanu Filanan Deposit

Drill holes targeted gaps in the Sanu Filanan block model, with 2 to 4 holes
aligned along four sections across the main Sanu Filanan structure. To the
northwest, KRC1512, KRC1513, and KRC1529 constitute a fence of holes with each
hole intersecting the deposit at increasing depths; to 105 metres below surface
(see Table 1). Eighty metres along strike to the southeast, KRC1514 intersected
the zone at a depth of 73 metres. Another 200 to 300 metres further southeast,
KRC1508 to KRC1511, KRC1522, KRC1530, and KRC1531 tested the west side of the
Sanu Filanan structure highlighted by 22.48 g/t Au over 15.0 metres beginning at
9 metres depth in KRC1510. Three hundred metres west of the main Sanu Filanan
structure, KRC1537 intersected 1.24 g/t Au over 7.0 metres.




Table 1  Sanu Filanan Deposit 

-----------------------------------------------------------------
Hole ID       From (m)         To (m)     Length (m)      Au (g/t)
-----------------------------------------------------------------
KRC1508          72.0           79.0            7.0          0.97
-----------------------------------------------------------------
 and             95.0          101.0            6.0          9.80
-----------------------------------------------------------------
KRC1509          70.0           71.0            1.0          3.87
-----------------------------------------------------------------
 and             79.0           80.0            1.0          1.70
-----------------------------------------------------------------
KRC1510           4.0            7.0            3.0          5.62
-----------------------------------------------------------------
 and             11.0           26.0           15.0         22.48
-----------------------------------------------------------------
 and             48.0           49.0            1.0          4.39
-----------------------------------------------------------------
KRC1511           1.0            2.0            1.0         34.80
-----------------------------------------------------------------
 and              8.0           13.0            5.0         13.31
-----------------------------------------------------------------
 and             22.0           24.0            2.0          2.55
-----------------------------------------------------------------
 and            137.0          144.0            7.0          2.79
-----------------------------------------------------------------
KRC1512          13.0           20.0            7.0         10.06
-----------------------------------------------------------------
KRC1513          45.0           53.0            8.0          0.93
-----------------------------------------------------------------
 and             58.0           60.0            2.0          2.08
-----------------------------------------------------------------
 and             65.0           68.0            3.0          1.42
-----------------------------------------------------------------
 and            142.0          146.0            4.0          1.01
-----------------------------------------------------------------
KRC1514          89.0           94.0            5.0          8.46
-----------------------------------------------------------------
KRC1522          85.0           87.0            2.0         14.50
-----------------------------------------------------------------
 and            112.0          116.0            4.0          1.40
-----------------------------------------------------------------
 and            127.0          137.0           10.0          0.95
-----------------------------------------------------------------
KRC1529         100.0          110.0           10.0         10.20
-----------------------------------------------------------------
 and            118.0          128.0           10.0          1.72
-----------------------------------------------------------------
 and            135.0          139.0            4.0          0.54
-----------------------------------------------------------------
KRC1530          54.0           56.0            2.0          1.89
-----------------------------------------------------------------
KRC1531          47.0           48.0            1.0          2.56
-----------------------------------------------------------------
 and             61.0           62.0            1.0          2.80
-----------------------------------------------------------------
 and            121.0          123.0            2.0          6.33
-----------------------------------------------------------------
KRC1537          82.0           89.0            7.0          1.24
-----------------------------------------------------------------





An updated location map will be posted on www.cassidygold.com shortly.

The Sanu Filanan deposit consists of near surface, potentially open-pittable,
mainly oxide resource, outlined over a strike length of 900 metres. In October
2007, Coffey Mining estimated an Indicated Resource of 187,000 ounces of gold in
1,840,000 tonnes grading 3.2 g/t Au and an additional Inferred Resource of
242,000 ounces in 3,750,000 tonnes grading 2.0 g/t Au for Sanu Filanan, as part
of the overall Indicated Resource of 466,000 ounces of gold contained in
6,736,000 tonnes grading 2.2 g/t Au and an Inferred Resource of 477,000 ounces
of gold contained in 8,772,000 tonnes grading 1.7 g/t Au for the Kouroussa
Project. An independent technical report describing the details of the resource
study is posted at www.sedar.com.


Exploration Program

The latest phase of drilling commenced in late November 2007 and recently
concluded with the onset of the rainy season in West Africa. The program
comprised 14,899 metres in 138 RC holes covering 7 target areas. Drilling
focused on extending the Junction deposit in the Sodyanfe area, connecting it
with the Bag Farm zone. Drilling also tested the nearby Siadafa and Ridge
prospects to the northeast and west, respectively. Resource drilling continued
on three deposits in the Koekoe area: Sanu Filanan, JJ Vein, and KD-1.


Cassidy plans to review the resource picture and scoping scale studies for the
Kouroussa Project.


Sampling and Assay Procedures

RC drill samples were collected from the cyclone and split using a 1 in 8 riffle
splitter down to approximately 2.5kg in size. All samples were sent to the SGS
analytical laboratory in Siguiri, Guinea for further sample preparation and fire
assay using a 50-gram sub sample. Along with SGS internal quality control
procedures, external field duplicates, blanks and certified standards are
undertaken over 5% of all sampling. Quality control/quality assurance is closely
monitored by Coffey Mining personnel.


Christopher J. Wild, P.Eng, VP Exploration for Cassidy Gold Corp., is the
Qualified Person for this release.


On behalf of the Board of Directors

Cassidy Gold Corp.

James T. Gillis, President & CEO

This press release may be accessed at Cassidy Gold Corp.'s website:
www.cassidygold.com and at www.sedar.com.


If you wish to be placed on Cassidy Gold Corp.'s e-mail press release list,
please contact us at cassidygold@telus.net.


Cassidy Gold Old (Tier2) (TSXV:CDY)
Gráfico Histórico do Ativo
De Mai 2024 até Jun 2024 Click aqui para mais gráficos Cassidy Gold Old (Tier2).
Cassidy Gold Old (Tier2) (TSXV:CDY)
Gráfico Histórico do Ativo
De Jun 2023 até Jun 2024 Click aqui para mais gráficos Cassidy Gold Old (Tier2).