Gold-Ore Resources Ltd. (TSX VENTURE:GOZ) is pleased to provide October
operational highlights for the 100% owned Bjorkdal Gold Mine in Sweden. Gold
production has increased dramatically during 2008 and reached an annualized rate
of 34,992 ounces in October. Gold-Ore is focused on increasing cash flow and
production from the mine and remains debt-free, unhedged and cash flow positive.


October, 2008 Gold Production

October gold production at the Bjorkdal Mine increased significantly from
previous months. A total of 2,916 ounces was produced, which equates to an
annualized production rate of 34,992 ounces. This increased productivity is
directly related to increased grades and tonnages achieved from stopes and
on-vein drives in the underground unit of the mine.




-----------------------------------------
October, 2008
-----------------------------------------
Tonnes processed                   96,273
-----------------------------------------
Daily throughput - tonnes           3,106
-----------------------------------------
Gold recovered - ounces             2,916
-----------------------------------------
               - kilograms           90.7
-----------------------------------------
Average plant recovery                 88%
-----------------------------------------



To view attached graph please click on the following link:
http://media3.marketwire.com/docs/GOZgraph.jpg


Gold production at Bjorkdal is achieved by processing material from three
sources: underground, open pit and surface stockpiles. During September and
October the underground unit produced at the average rate of 1,030 tonnes per
day, the open pit at 857 tonnes per day and the stockpiles at the rate of 1,252
tonnes per day.


Operational Objectives

During the next few months the Company plans to evaluate or complete the
following objectives:


- Complete test mining of stopes - currently three completed and three underway

- Complete on-going feasibility study utilizing stope mining results

- Declare commercial production

- Develop the Central Tunnel area where historic mining and diamond drilling
demonstrate higher gold grades


- Evaluate development of decline to access a lower level (cost CDN$1.1 million,
SEK$7.0 million) to provide sufficient plant feed from the underground unit for
2009


- Increase open pit production to decrease reliance on stockpiles

- Plant upgrade - install a second Knelson Concentrator in 2009 (ordered in
Sept.) to improve gold recovery


About Gold-Ore

Gold-Ore Resources is a mineral exploration and development company focused in
Sweden. In addition to the Bjorkdal Gold Mine, the Company also has other assets
in the country; the Ronnberget Gold Property (adjacent to Bjorkdal), Norrliden
Polymetallic Deposit and the Vallberget Polymetallic Property.


Bjorkdal property information is posted on the Company's web site at
www.goldoreresources.com.


ON BEHALF OF THE BOARD

Robert Wasylyshyn, President

This news release may contain forward-looking statements including but not
limited to comments regarding the timing and content of upcoming work programs,
geological interpretations, receipt of property titles, potential mineral
recovery processes, etc. Forward-looking statements address future events and
conditions and therefore, involve inherent risks and uncertainties. Actual
results may differ materially from those currently anticipated in such
statements.


News Release 08-15

Gold-Ore Resources Ltd (TSXV:GOZ)
Gráfico Histórico do Ativo
De Jun 2024 até Jul 2024 Click aqui para mais gráficos Gold-Ore Resources Ltd.
Gold-Ore Resources Ltd (TSXV:GOZ)
Gráfico Histórico do Ativo
De Jul 2023 até Jul 2024 Click aqui para mais gráficos Gold-Ore Resources Ltd.