Zenyatta Ventures Ltd. ("Zenyatta" or "Company") (TSX VENTURE:ZEN) is pleased to
announce the following results from drilling on the East and West pipes of the
100% owned Albany (Hydrothermal) Graphite Deposit located in northern Ontario,
Canada.


In reviewing the latest drill results, Aubrey Eveleigh, President and CEO
stated, "We are very pleased to see initial drill holes on the West pipe
confirming the existence of a second large graphite breccia body. The West pipe
appears to be larger in diameter than the East pipe and closely reflects the
circular conductivity anomaly defined by a ground EM ('electromagnetic') survey.
Drilling to date on the West pipe has not yet identified the western limit of
mineralization. Additional holes will be required before the overall dimension
can be established."


To date, 13 holes have been drilled on the West pipe and 25 holes have been
drilled on East pipe. The current drill campaign contemplates an additional 8-10
definition holes on both pipes and 3 large-diameter (HQ) holes on the East pipe
to recover a 5 tonne bulk sample for metallurgical test work. As of the date of
this news release, the first metallurgical hole (M01) drilled on the East pipe
had intersected multiple zones of graphite breccia mineralization over 464
metres ("m"). Once these holes are complete, the 2013 drilling campaign will
conclude and a NI 43-101 resource statement will be prepared by independent
consultants RPA Inc. A plan map of the current drilling program is available at
www.zenyatta.ca.


The following graphitic carbon ('Cg') assay results were yielded from holes 25 -
32 drilled on the East and West Pipes:




--  Hole 32 (West) yielded 100.3 m @ 3.7% Cg from 119.7 m to 220.0 m within
    a wider intersection of 260.7 m of graphite mineralization grading 2.1%
    Cg from 106.8 m to 367.5 m. 
--  Hole 31 (West) yielded 139.6 m @ 4.1% Cg from 65.0 m to 204.6 m within a
    wider intersection of 294.0 m of graphite mineralization grading 2.6% Cg
    from 65.0 m to 359.0 m. 
--  Hole 30 (West) yielded 129.0 m @ 3.4% Cg from 63.0 m to 192.0 m within a
    wider intersection of 229.2 m of graphite mineralization grading 2.6% Cg
    from 63.0 m to 292.2 m. 
--  Hole 29 (West) yielded 100.0 m @ 2.8% Cg from 61.0 m to 161.0 m within a
    wider intersection of 243.0 m of graphite mineralization grading 2.0% Cg
    from 60.0 m to 303.0 m. 
--  Hole 28 (East) yielded 115.5 m @ 6.9% Cg from 94.3 m to 209.8 m within a
    wider intersection of 269.0 m of graphite mineralization grading 3.3% Cg
    from 70.0 m to 339.0 m. 
--  Hole 27 (West) yielded 47.0 m @ 3.8% Cg from 248.0 m to 295.0 m within a
    wider intersection of 153.1 m of graphite mineralization grading 1.3% Cg
    from 183.0 m to 336.1 m. A gabbroic dyke displaced the graphite
    mineralization in this hole. 
--  Hole 26 (West) yielded 118.4 m @ 3.4% Cg from 100.6 m to 219.0 m within
    a wider intersection of 217.2 m of graphite mineralization grading 2.4%
    Cg from 100.6 m to 317.8 m. Second Zone: 26.1 m @ 3.3% Cg from 410.0 m
    to 436.1 m. 
--  Hole 25 (East) yielded 101.7 m @ 5.5% Cg from 62.3 m to 164.0 m within a
    wider intersection of 150.7 m of graphite mineralization grading 3.9% Cg
    from 62.3 m to 213.0 m. (All lengths reported are drill intersected core
    lengths and do not represent true widths). 



The East Pipe graphite mineralization is oval-shaped with dimensions of
approximately 150 metres ("m") in a NE-SW direction by 300 m in a NW-SE
direction and to a depth of 500 m. It is showing good vertical continuity and
remains open at depth. The East Pipe consists of a higher grade core of graphite
breccia which is typically surrounded by a broad halo of graphite overprinted
granite.


Holes 10-24 were previously announced and included here for reference:



--  Hole 24 yielded 150.6 m @ 4.8% Cg from 61.0 m to 211.6 m within a wider
    intersection of 191.0 m of graphite mineralization grading 3.8% Cg from
    61.0 m to 252.0 m. 
--  Hole 23 yielded 96.3 m @ 5.3% Cg from 83.0 m to 179.3 m within a wider
    intersection of 179.0 m of graphite mineralization grading 3.1% Cg from
    62.0 m to 241.0 m. 
--  Hole 22 yielded 137.0 m @ 5.0% Cg from 63.0 m to 200.0 m within a wider
    intersection of 198.0 m of graphite mineralization grading 3.5% Cg from
    63.0 m to 261.0 m. 
--  Hole 21 yielded 140.6 m @ 4.8% Cg from 89.0 m to 229.6 m within a wider
    intersection of 228.0 m of graphite mineralization grading 3.1% Cg from
    63.0 m to 291.0 m. 
--  Hole 20 yielded 128.0 m @ 5.5% Cg from 61.0 m to 189.0 m within a wider
    intersection of 241.5 m of graphite mineralization grading 3.1% Cg from
    61.0 m to 302.5 m. 
--  Hole 19 yielded 110.0 m @ 4.2% Cg from 66.0 m to 176.0 m within a wider
    intersection of 176.0 m of graphite mineralization grading 2.7% Cg from
    66.0 m to 242.0 m. 
--  Hole 18 yielded 154.0 m @ 4.8% Cg from 133.0m to 287.0 m within a wider
    intersection of 258.0 m of graphite mineralization grading 3.1% Cg from
    101.0 m to 359.0 m. 
--  Hole 17 yielded 67.2 m @ 3.0% Cg from 322.0 m to 389.2 m within a wider
    intersection of 192.4 m of graphite mineralization grading 1.7% Cg from
    236.6 m to 429.0 m. 
--  Hole 16 yielded 62.3 m @ 4.2% Cg from 291.0 m to 353.3 m within a wider
    intersection of 135.3 m of graphite mineralization grading 2.3% Cg from
    258.0 m to 393.3 m. (All lengths reported are drill intersected core
    lengths and do not represent true widths). 
--  Hole 15 yielded 125.0 m @ 4.6% Cg from 132.0 m - 257.0 m within a wider
    intersection of 300.0 m of graphite mineralization grading 2.2% Cg from
    60.0 m to 360.0 m. 
--  Hole 14 yielded 186.0 m @ 4.9% Cg from 146.0 m - 332.0 m within a wider
    intersection of 426.0 m of graphite mineralization grading 3.0% Cg from
    118.0 m to 544.0 m. 
--  Hole 13 yielded 177.0 m @ 5.3% Cg from 138.0 m - 315.0 m within a wider
    intersection of 219.9 m of graphite mineralization grading 4.5% Cg from
    95.1 m to 315.0 m. 
--  Hole 12 yielded 146.0 m @ 5.2% Cg from 95.0 m - 241.0 m within a wider
    intersection of 195.0 m of graphite mineralization grading 4.0% Cg from
    90.0 m to 285.0 m. 
--  Hole 11 yielded 84.9 m @ 5.2% Cg from 460.6 m to 545.5 m within a wider
    intersection of 203.0 m of graphite mineralization grading 3.0% Cg from
    393.0 m to 596.0 m. 
--  Hole 10 yielded 360.8 m @ 5.1% Cg from 49.0 m to 409.8 m. 



Graphitic carbon analyses for drill holes 33 through 38 and M01 will be released
once received. The following table provides locational data for all holes
drilled to date on the Albany graphite deposit.




----------------------------------------------------------------------------
          LENGTH                                                            
HOLE-ID (metres)  EASTING  NORTHING ELEVATION  AZIMUTH   DIP  PIPE    ASSAYS
----------------------------------------------------------------------------
----------------------------------------------------------------------------
M01     Drilling   682955   5545700       130      332   -85  EAST   Pending
----------------------------------------------------------------------------
38      Drilling   682809   5545495       130       43   -50  EAST   Pending
----------------------------------------------------------------------------
37           390   682860   5545547       130       43   -50  EAST   Pending
----------------------------------------------------------------------------
36           363   682792   5545692       130       45   -50  EAST   Pending
----------------------------------------------------------------------------
35           522   682751   5545650       130       45   -50  EAST   Pending
----------------------------------------------------------------------------
34           531   682715   5545700       130      270   -50  WEST   Pending
----------------------------------------------------------------------------
33           540   682676   5545802       130      225   -50  WEST   Pending
----------------------------------------------------------------------------
32           459   682600   5545570       130      295   -50  WEST  COMPLETE
----------------------------------------------------------------------------
31           396   682516   5545845       130      180   -50  WEST  COMPLETE
----------------------------------------------------------------------------
30           393   682438   5545800       130      135   -50  WEST  COMPLETE
----------------------------------------------------------------------------
29           423   682392   5545723       130      110   -50  WEST  COMPLETE
----------------------------------------------------------------------------
28           339   683016   5545768       130      200   -50  EAST  COMPLETE
----------------------------------------------------------------------------
27           561   682710   5545570       130      295   -50  WEST  COMPLETE
----------------------------------------------------------------------------
26           618   682395   5545565       130       45   -50  WEST  COMPLETE
----------------------------------------------------------------------------
25           213   682984   5545799       130      225   -50  EAST  COMPLETE
----------------------------------------------------------------------------
24           252   682917   5545637       130       45   -50  EAST  COMPLETE
----------------------------------------------------------------------------
23           270   682845   5545745       130       45   -50  EAST  COMPLETE
----------------------------------------------------------------------------
22           261   682866   5545706       130       45   -50  EAST  COMPLETE
----------------------------------------------------------------------------
21           291   682890   5545673       130       45   -50  EAST  COMPLETE
----------------------------------------------------------------------------
20           303   683016   5545768       130      225   -50  EAST  COMPLETE
----------------------------------------------------------------------------
19           291   682952   5545830       130      225   -50  EAST  COMPLETE
----------------------------------------------------------------------------
18           432   682809   5545809       130      120   -50  EAST  COMPLETE
----------------------------------------------------------------------------
17           509   683200   5545700       130      270   -50  EAST  COMPLETE
----------------------------------------------------------------------------
16           531   683095   5545894       130      225   -50  EAST  COMPLETE
----------------------------------------------------------------------------
15           412   682860   5545610       130       45   -50  EAST  COMPLETE
----------------------------------------------------------------------------
14           668   683090   5545590       130      315   -50  EAST  COMPLETE
----------------------------------------------------------------------------
13           425   683100   5545700       130      270   -50  EAST  COMPLETE
----------------------------------------------------------------------------
12           366   683025   5545825       130      225   -50  EAST  COMPLETE
----------------------------------------------------------------------------
11           684   682955   5545935       130      180   -65  EAST  COMPLETE
----------------------------------------------------------------------------
10           438   682955   5545800       130      180   -65  EAST  COMPLETE
----------------------------------------------------------------------------
9            425   682955   5545850       130      180   -65  EAST  COMPLETE
----------------------------------------------------------------------------
8            365   682955   5545800       130        0   -65  EAST  COMPLETE
----------------------------------------------------------------------------
7            321   682600   5545570       131        0   -65  WEST  COMPLETE
----------------------------------------------------------------------------
6            346   682400   5545570       131        0   -65  WEST  COMPLETE
----------------------------------------------------------------------------
5            326   682955   5545700       130        0   -65  EAST  COMPLETE
----------------------------------------------------------------------------
4            179   682955   5545700       130      180   -80  EAST  COMPLETE
----------------------------------------------------------------------------
3            495   682500   5545770       131      180   -56  WEST  COMPLETE
----------------------------------------------------------------------------
2            528   682500   5545370       131        0   -65  WEST  COMPLETE
----------------------------------------------------------------------------
1            543   682500   5545570       131        0   -65  WEST  COMPLETE
----------------------------------------------------------------------------
                                                       Nad 83, UTM          
                                                           Zone 16          



Analytical Protocol

Samples of half core were packaged and shipped directly from Zenyatta's core
shack at the site to the ALS Minerals facility in Thunder Bay, Ontario, for
sample preparation (ALS protocol PREP-31B). Each bagged core sample is dried,
crushed to better than 70% passing 2mm and a 1000g split of the crushed material
is pulverized to better than 85% passing 75 microns for assaying. The sample
pulps were then shipped to the ALS Minerals laboratory in Vancouver, British
Columbia for assay. ALS Minerals has ISO 9001:2008 and ISO 17025 Accreditation
as per the Standards Council of Canada at all of its global laboratories.
Graphite assays were obtained using the graphitic carbon by LECO method (ALS
protocol C- IR18). A 0.1g sample is leached with dilute hydrochloric acid to
remove inorganic carbon (carbonate). After filtering, washing and drying, the
remaining sample residue is roasted at 425 degrees C to remove any organic
carbon. The roasted residue is finally analysed for graphitic carbon using a
high temperature LECO furnace with infra-red detection. The samples were
submitted with blanks and certified custom standards inserted into the sample
stream to ensure lab integrity.


Mr. Peter Wood, P.Geo., Zenyatta Ventures Ltd., Vice President Exploration, is
the "Qualified Person" under National Instrument 43-101 and has reviewed and
approved the technical information contained in this news release. This news
release may contain forward looking information and Zenyatta Ventures Ltd.
cautions viewers that forward looking information is based on certain
assumptions and risk factors exist that could cause actual results to differ
materially from the expectations of Zenyatta Ventures Ltd. included in this news
release. To find out more on Zenyatta Ventures Ltd., please visit website
www.zenyatta.ca.


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term
is defined in the policies of the TSX Venture Exchange) accepts responsibility
for the adequacy or accuracy of this release. This News Release includes certain
"forward- looking statements", which often, but not always, can be identified by
the use of words such as "believes", "anticipates", "expects", "estimates",
"may", "could", "would", "will", or "plan" . These statements are based on
information currently available to Zenyatta and Zenyatta provides no assurance
that actual results will meet management's expectations. Forward- looking
statements include estimates and statements with respect to Zenyatta's future
plans, objectives or goals, to the effect that Zenyatta or management expects a
stated condition or result to occur, including this News Release. Since
forward-looking statements are based on assumptions and address future events
and conditions, by their very nature they involve inherent risks and
uncertainties. Actual results relating to, among other things, results of
exploration, project development, reclamation and capital costs of Zenyatta's
mineral properties, and Zenyatta's financial condition and prospects, could
differ materially from those currently anticipated in such statements for many
reasons such as: changes in general economic conditions and conditions in the
financial markets; changes in demand and prices for minerals; litigation,
legislative, environmental and other judicial, regulatory, political and
competitive developments; technological and operational difficulties encountered
in connection with


Zenyatta's activities; and other matters discussed in this News Release and in
filings made with securities regulators. This list is not exhaustive of the
factors that may affect any of Zenyatta's forward-looking statements. These and
other factors should be considered carefully and readers should not place undue
reliance on Zenyatta's forward-looking statements. Zenyatta does not undertake
to update any forward-looking statement that may be made from time to time by
Zenyatta or on its behalf, except in accordance with applicable securities laws.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Zenyatta Ventures Ltd.
807-346-1660
info@zenyatta.ca
www.zenyatta.ca

Zentek (TSXV:ZEN)
Gráfico Histórico do Ativo
De Mai 2024 até Jun 2024 Click aqui para mais gráficos Zentek.
Zentek (TSXV:ZEN)
Gráfico Histórico do Ativo
De Jun 2023 até Jun 2024 Click aqui para mais gráficos Zentek.