THUNDER BAY, ONTARIO--(Marketwired - Dec 2, 2013) - Zenyatta
Ventures Ltd. ("Zenyatta" or "Company") (TSX-VENTURE:ZEN) is
pleased to announce the results of its initial National Instrument
("NI") 43-101 compliant resource estimate prepared by Roscoe Postle
Associates Inc. ("RPA") on the Company's 100 percent owned Albany
graphite deposit located in northeastern Ontario, Canada.
RPA estimates Indicated Mineral Resources delineated to date
total 25.1 million tonnes ("Mt") at an average grade of 3.89%
graphitic carbon ("Cg"), containing 977,000 tonnes of Cg. In
addition, Inferred Mineral Resources delineated to date are
estimated to total 20.1 million tonnes at an average grade of 2.20%
Cg, containing 441,000 tonnes of Cg. A 3D geological deposit model
showing the preliminary pit shell, West and East Pipes can be found
at the following link Graphite Project on the Company's
website.
Aubrey Eveleigh, President and CEO stated, "We are extremely
pleased with initial results from the independent work completed by
RPA displaying a very robust graphite deposit. The Mineral Resource
estimate shows a significant amount of graphitic carbon totaling
977,000 tonnes Indicated and an additional amount of 441,000 tonnes
Inferred. It's significant to note that the graphite mineralization
extends below the preliminary pit shell and is also open at depth
but not included in these Mineral Resource estimates. Zenyatta will
continue with market studies and now engage an independent
consultant to complete a Preliminary Economic Assessment ("PEA") by
the second quarter of 2014."
Mineral Resources are contained within two vertical pipes spaced
approximately 250 m apart. The East Pipe is approximately 300 m
long in the NW-SE direction by 50 m wide by 600 m deep, where it
remains open. An overprint of lower grade mineralization occurs
around the East Pipe for a collective width of 150 m in the NE-SW
direction. The West Pipe is approximately 300 m long in the NE-SW
direction by 175 m wide by 500 m deep, where it also remains open.
Both pipes are cut by 10 m to 60 m thick barren sills located
approximately 200 m to 300 m below surface.
Table 1 - Mineral Resource Estimates for the Albany Graphite
Project as of November 15, 2013
|
Tonnage |
Grade |
Tonnes Graphitic Carbon |
|
(Mt) |
(% Cg) |
(t Cg) |
Indicated |
|
|
|
|
East Pipe |
10.0 |
5.60 |
560,000 |
|
West Pipe |
15.1 |
2.76 |
417,000 |
Total Indicated |
25.1 |
3.89 |
977,000 |
|
|
|
|
Inferred |
|
|
|
|
East Pipe |
7.6 |
2.04 |
155,000 |
|
West Pipe |
12.5 |
2.29 |
286,000 |
Total Inferred |
20.1 |
2.20 |
441,000 |
- CIM definitions were followed for Mineral Resources.
- Cg - graphitic carbon
- Mineral Resources are estimated at a cut-off grade of 0.6%
Cg.
- Mineral Resources are estimated using a long-term price of
US$8,500 per tonne Cg, and a US$/C$ exchange rate of 1.0.
- Bulk density is 2.6 t/m3 in the pipes and 2.65 t/m3 in the
overprint of the East Pipe.
- Mineral Resources are constrained by a preliminary pit-shell
generated in Whittle software.
- Numbers may not add due to rounding.
|
Table 2 - Resource Sensitivity to Various Cut-Off Values |
|
Tonnage |
Grade |
Tonnes Graphitic Carbon |
Classification, Cut-off Grade |
(Mt) |
(%Cg) |
(t Cg) |
Indicated |
|
|
|
|
|
2.0 |
20.7 |
4.41 |
914,000 |
|
|
1.0 |
24.3 |
3.99 |
971,000 |
|
|
0.6 |
25.1 |
3.89 |
977,000 |
|
|
0.4 |
25.4 |
3.85 |
978,000 |
Inferred |
|
|
|
|
|
2.0 |
9.4 |
3.34 |
315,000 |
|
|
1.0 |
15.9 |
2.57 |
408,000 |
|
|
0.6 |
20.1 |
2.20 |
441,000 |
|
|
0.4 |
23.0 |
1.98 |
455,000 |
Footnotes: as Per Table 1 Above. |
Resource Estimation Details: The Albany Graphite Project drill
hole database includes 60 NQ size diamond core holes totaling
24,626 metres drilled prior to November 15, 2013. Drill hole cross
sections and plan views were interpreted to construct
three-dimensional wireframe models of the pipes using the
descriptive logs and overprint mineralization using a nominal
cut-off of 0.4% Cg. Assay intervals were composited to two metre
lengths. Grades were estimated using ordinary kriging. Resources
were classified as Indicated or Inferred based on drill hole
spacing and the apparent continuity of mineralization. Indicated
Resources are confined within those parts of the pipes located
above the barren sills. All material below the sills or within the
overprint mineralization is classified as Inferred. Only material
located within the preliminary pit shell generated in Whittle
software is included in estimated Mineral Resources. Mineral
Resources are reported at a cut-off grade of 0.6% graphitic Cg
based on drill results available to November 15, 2013. A NI 43-101
technical report documenting the Mineral Resource estimate will be
filed on SEDAR within 45 days.
A relatively low cut-off grade of 0.6% Cg was used to report
Mineral Resources, compared to flake graphite Cg projects, due to
an assumed market price of $8,500 per tonne Cg product for the
Albany graphite product. Zenyatta and its technical advisors
believe that hydrothermal graphite from the Albany Graphite Project
will command higher prices than flake graphite products, based on
process test work completed earlier this year. Results suggest that
high-purity graphitic material can be produced, suitable for
competing in the $13 billion (1.5 million tonnes annually)
synthetic graphite market. Synthetic high purity graphite commands
higher market prices in the range of $7,000 to $20,000 per tonne
for >99.9% Cg carbon. Bench scale testing of the Albany graphite
material using a caustic bake method at SGS Inc. has demonstrated a
product at 99.99% carbon purity with very good crystallinity.
The global trend in graphite markets is to develop products for
technological applications that require extraordinary performance
using ultra-high purity graphite powder at an affordable cost. High
purity is gaining prominence at a time when Zenyatta discovered a
very rare (hydrothermal) graphite deposit, which can be upgraded to
99.99% carbon without the use of aggressive acids like HF and high
thermal treatment.
The outlook for the global graphite market is very promising
with demand growing rapidly from new applications. It is now
considered a strategic commodity by many industrial nations,
particularly for its growing importance in high technology
manufacturing and in the emerging "green" industries such as
electric vehicle components. The application for graphitic material
is constantly evolving due to its unique chemical, electrical and
thermal properties. It maintains its stability and strength under
temperatures in excess of 3,300°C and is very resistant to chemical
corrosion. It is also one of the lightest of all reinforcing
elements and has high natural lubricating abilities. Some of these
key physical and chemical properties make it critical to modern
industry.
Zenyatta's Albany (Hydrothermal) Graphite Deposit is located in
northeastern Ontario, Canada approximately 30 km north of the
Trans-Canada Highway, power line and natural gas pipeline near the
communities of Constance Lake First Nation and Hearst. A rail line
is located 70 km away with an all-weather road approximately 4-5 km
from the graphite deposit. The deposit is near surface, underneath
glacial till overburden and a thin veneer of Paleozoic sedimentary
cover rocks.
Qualified Persons - Resource: The Mineral Resources for Albany
Graphite Project disclosed in this news release have been estimated
by Ms. Katharine Masun, P.Geo., and Mr. David Ross, P.Geo., both
employees of RPA and independent of Zenyatta. By virtue of their
education and relevant experience, Ms. Masun and Mr. Ross are
"Qualified Persons" for the purpose of National Instrument 43-101.
The Mineral Resources have been classified in accordance with CIM
Definition Standards for Mineral Resources and Mineral Reserves,
(November 2010). Mr. Ross, P.Geo., has read and approved the
contents of this press release as it pertains to the disclosed
Mineral Resource estimate.
Mr. Peter Wood, P.Geo., VP Exploration of Zenyatta is a
"Qualified Person" under NI 43-101 and has reviewed the technical
information contained in this news release. To find out more on
Zenyatta Ventures Ltd., please visit website www.zenyatta.ca.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
This news release may contain forward looking information
and Zenyatta cautions readers that forward looking information is
based on certain assumptions and risk factors exist that could
cause actual results to differ materially from the expectations of
Zenyatta included in this news release. This news release includes
certain "forward-looking statements", which often, but not always,
can be identified by the use of words such as "believes",
"anticipates", "expects", "estimates", "may", "could", "would",
"will", or "plan". These statements are based on information
currently available to Zenyatta and Zenyatta provides no assurance
that actual results will meet management's expectations.
Forward-looking statements include estimates and statements with
respect to Zenyatta's future plans, objectives or goals, to the
effect that Zenyatta or management expects a stated condition or
result to occur, including the expected timing for release of
sample analyses and a preliminary economic assessment, the expected
uses for graphite in the future, and the future uses of the
graphite from Zenyatta's Albany deposit. Since forward-looking
statements are based on assumptions and address future events and
conditions, by their very nature they involve inherent risks and
uncertainties. Actual results relating to, among other things,
results of exploration, project development, reclamation and
capital costs of Zenyatta's mineral properties, and Zenyatta's
financial condition and prospects, could differ materially from
those currently anticipated in such statements for many reasons
such as: changes in general economic conditions and conditions in
the financial markets; changes in demand and prices for minerals;
litigation, legislative, environmental and other judicial,
regulatory, political and competitive developments; technological
and operational difficulties encountered in connection with
Zenyatta's activities; and other matters discussed in this news
release and in filings made with securities regulators. This list
is not exhaustive of the factors that may affect any of Zenyatta's
forward-looking statements. These and other factors should be
considered carefully and readers should not place undue reliance on
Zenyatta's forward-looking statements. Zenyatta does not undertake
to update any forward-looking statement that may be made from time
to time by Zenyatta or on its behalf, except in accordance with
applicable securities laws.
Zenyatta Ventures
Ltd.807-346-1660info@zenyatta.cawww.zenyatta.ca
Zentek (TSXV:ZEN)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Zentek (TSXV:ZEN)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025