REPEAT - Cameo Neighbor To Supply Battery-Grade Lithium Hydroxide (LiOH) to Northvolt
08 Maio 2018 - 10:00AM
Cameo Resources Corp. (TSX-V:CRU) (OTC:CRUUF)
(FWB:SY7D) (the “
Company” or “
Cameo
Resources”) is pleased to note that Nemaska Lithium Inc.
and Northvolt AB have signed an agreement in principle providing
for the supply by Nemaska to Northvolt of battery-grade lithium
hydroxide.
As reported by Nemaska Lithium (news release dated April 27,
2018) under this agreement in principle, Nemaska Lithium Inc. has
agreed to supply, through its wholly owned subsidiary Nemaska
Lithium Shawinigan Transformation Inc., and Northvolt agreed to
purchase, on a take-or-pay basis, up to 5,000 but not less than
3,500 metric tonnes per year of lithium hydroxide produced at the
corporation's commercial plant in Shawinigan, for a five-year
supply period commencing upon the start of commercial production at
both the Shawinigan plant and Northvolt's projected Skelleftea
factory (the N Factory) in Sweden. In connection with this supply
of lithium hydroxide, Northvolt has agreed to deliver to the
corporation a 10-million-euro promissory note which, at the
corporation's option, can be converted into voting shares of
Northvolt in connection with the N factory financing, or redeemed
at cost plus an agreed-upon interest rate.
Nemaska Lithium Inc. holds the Whabouchi Lithium deposit claims,
which extend to within 1 km of Cameo’s Montagne Lake Property in
central Québec. Nemaska Lithium’s Whabouchi lithium deposit
is one of the most important spodumene lithium deposits in the
world, and Nemaska Lithium is currently raising funds for the
construction and commissioning of its proposed Whabouchi Mine and
Shawinigan Plant project.
Cameo’s Whabouchi Regional Lithium (“WRL”) Project in Quebec
covers more than 19,000 ha in two blocks on either side of
Nemaska’s proposed Whabouchi lithium mine including Cameo’s 4,484
ha Montagne Lake Property immediately to the west of Nemaska’s
proposed Whabouchi lithium mine, and the Dumont Property 6 km to
the east.
Cameo’s CEO, Akash Patel states, “Cameo continues to actively
monitor the exciting news flow out of our neighbor’s camp; from
Softbank’s $99M investment in Nemaska to Northvolt’s most recent
supply agreement. These material announcements are a strong
indication that the Whabouchi region could be the next mecca in
battery metal discovery and production.”
About NorthVolt
Northvolt was founded in 2016 with the mission to build the
world’s greenest battery, with a minimal carbon footprint and the
highest ambitions for recycling, to enable the European transition
to renewable energy. Northvolt’s team of experts is building the
next generation battery factory focused on process innovation,
scale and vertical integration. Once completed, it will be Europe’s
largest battery factory and produce 32 GWh worth of battery
capacity annually.
Although Nemaska Lithium’s proposed mine at Whabouchi is
proximal to Cameo’s WRL Project, the spodumene lithium
mineralization on Nemaska’s ground is not necessarily indicative of
similar mineralization on Cameo’s property and Cameo’s qualified
person is unable to independently verify the information reported
by Nemaska Lithium Inc.
Harrison Cookenboo, Ph.D., P.Geo., is a
qualified person as defined in
National Instrument 43-101. He has reviewed and
is responsible for the presentation of technical information in
this news release.
CAMEO RESOURCES CORP. “ Akash Patel”
For more information contact:Lucas Birdsall(778)
549-6714www.cameoresources.com
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Cameo Industries (TSXV:CRU)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Cameo Industries (TSXV:CRU)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025