Pretium Resources Inc. (TSX/NYSE: PVG) (“Pretivm” or the “Company”)
today announced that it continues to intersect high grade gold
mineralization in Phase 2 of the North Block resource expansion
drill program at the Brucejack Mine in British Columbia.
Following up on the success of the Phase 1 drill
program (see news release dated February 25, 2021) Pretivm
initiated a second phase of drilling to test the extension of the
North Block Zone to the northwest. The Phase 2 program
identified high-grade gold mineralization with five intersections
assaying above 1,000 grams per tonne gold. Results include, drill
hole VU-2933 which assayed 561.6 grams per tonne gold over 15.0
meters, including 8,400 grams per tonne gold over 1.0 meter. In
addition, drill hole VU-2932 assayed 306.6 grams per tonne gold
over 19.5 meters, including 5,910 grams per tonne gold over 1.0
meter. High grade gold mineralization was intercepted up to 450
meters from the current resource shell.
“These impressive results confirm high-grade
gold mineralization in the North Block Zone and further extend the
potential of the Valley of the Kings deposit at Brucejack,” said
Jacques Perron, President and Chief Executive Officer of Pretivm.
“Based on the success of the second phase, we have initiated a
third and fourth phase of the drill program to further delineate
the potential of the North Block Zone.”
The North Block Zone is located directly to the
north of the Valley of the Kings deposit. The resource expansion
exploration program is designed to test for Valley of the Kings
style mineralization to the north and at depth. Phase 2 of the
program was drilled from the 1150 and 1070 levels in the mine,
targeting an area extending up to 450 meters north of the current
resource shell. Phase 3 of the program will infill between the
existing drill fans and the newly designed Phase 4 of the program
will test an area immediately to the northwest of the current
drilling.
North Block – Phase 2 Results
Phase 2 of the North Block resource expansion
drill program comprised 22,964 meters in 83 drill holes. Drilling
from the 1150 level intersected the extension of the Domain 13
Stockwork, which is currently being mined in the Valley of the
Kings. Drilling from the 1070 level intersected the recently
identified corridor of gold mineralization in the footwall of the
Domain 13 structure. This corridor features coarse electrum in
northwest oriented quartz-carbonate veins within a broader halo of
lower grade gold mineralization.
For a plan and section view of the 2020 North
Block Phase 2 program please see the following
link: http://ml.globenewswire.com/Resource/Download/a0d0b719-e832-45c0-b1a2-c18be5099170.
Significant drill results are shown below:
- Hole VU-2933
intersected 561.6 grams per tonne gold over 15.0 meters, including
8,400 grams per tonne gold and 4,900 grams per tonne silver over
1.0 meters.
- Hole VU-2932
intersected 306.6 grams per tonne gold over 19.5 meters, including
5,910 grams per tonne gold and 3,400 grams per tonne silver over
1.0 meters.
- Hole VU-2962
intersected 191.6 grams per tonne gold over 14.0 meters, including
1,795 grams per tonne gold and 1,375 grams per tonne silver over
1.0 meters.
- Hole VU-2859
intersected 31.6 grams per tonne gold over 51.0 meters, including
1,515 grams per tonne gold over 1.0 meters.
- Hole VU-2967
intersected 61.7 grams per tonne gold over 17.5 meters, including
993 grams per tonne gold over 1.0 meters.
2021 Resource Expansion Drilling and Near-Mine
Exploration Program
The resource expansion drill program is
currently targeting the North Block Phase 3 and Phase 4 and the
1080 East Zone. In early July, two drills from underground will be
repositioned to complete a 13,000-meter resource expansion drill
program at Gossan Hill from surface. At the Bridge Zone,
11,000-meters of underground resource expansion drilling is
expected to start in late August.
The near-mine exploration program is expected to
start in mid-June with two additional drills on surface. The
program will focus first on exploration targets at Shore Zone and
SG Zone. Then, to follow up on the successful discovery of
epithermal style gold mineralization at Hanging Glacier, a
10,000-meter drill program will be initiated in late July (see news
release dated December 16, 2020).
In addition to drilling, the near-mine
exploration program will include a UAV magnetic survey, MT and IP
geophysical surveys, soil sampling and prospecting over the
four-kilometer trend from Brucejack to Hanging Glacier.
Stephanie Wafforn, P.Geo., Pretivm’s Resource
Manager is the Qualified Person as defined in National Instrument
43-101 Standards of Disclosure for Mineral Projects responsible for
the Mineral Resource expansion drill program and the near-mine
exploration program and has reviewed and approved the scientific
and technical information in this news release related thereto.
Table 1: Selected North Block Phase 2 Results, June
2021 (VU-2762 to VU-2969)(1,2)
Hole No. |
Dip/Azimuth |
From(meters) |
To(meters) |
Length(meters) |
Gold (g/t) |
Comments |
Fan 1070W_L1 |
VU-2856 |
-55/358 |
57.0 |
94.5 |
37.5 |
7.7 |
|
|
Incl |
73.0 |
74.0 |
1.0 |
159.5 |
|
VU-2857 |
-45/358 |
0.0 |
12.0 |
12.0 |
6.3 |
|
VU-2859 |
-25/358 |
0.0 |
51.0 |
51.0 |
31.6 |
|
|
Incl |
46.0 |
47.0 |
1.0 |
1,515 |
897 gpt Ag |
VU-2860 |
-15/358 |
112.5 |
135.0 |
22.5 |
20.0 |
|
|
Incl |
116.0 |
117.0 |
1.0 |
155.5 |
|
VU-2863 |
16/358 |
131.0 |
132.0 |
1.0 |
469 |
|
Fan 1070E_LVL |
VU-2865 |
-55/025 |
1.5 |
24.0 |
22.5 |
60.2 |
|
|
Incl |
19.0 |
21.0 |
2.0 |
643 |
539 gpt Ag |
|
And |
151.5 |
156.0 |
4.5 |
12.9 |
|
VU-2866 |
-45/025 |
54.0 |
70.5 |
16.5 |
21.1 |
|
|
Incl |
57.0 |
58.5 |
1.5 |
190 |
|
VU-2870 |
-5/025 |
227.0 |
229.0 |
2.0 |
56.4 |
|
Fan 1070W_L2 |
VU-2925 |
-35/011 |
202.5 |
234.0 |
31.5 |
5.7 |
|
|
Incl |
229.0 |
230.0 |
1.0 |
146 |
|
VU-2926 |
-25/011 |
133.5 |
141.0 |
7.5 |
35.8 |
|
|
Incl |
137.5 |
138.5 |
1.0 |
262 |
193 gpt Ag |
VU-2928 |
-5/011 |
40.0 |
41.0 |
1.0 |
276 |
|
VU-2930 |
16/011 |
21.0 |
24.0 |
3.0 |
16.3 |
|
Fan 1070_RMK |
VU-2932 |
-55/025 |
97.5 |
117.0 |
19.5 |
306.6 |
|
|
Incl |
115.0 |
116.0 |
1.0 |
5,910 |
3,400 gpt Ag |
|
And |
135.5 |
143.5 |
8.0 |
38.9 |
|
|
Incl |
142.5 |
143.5 |
1.0 |
172.5 |
|
VU-2933 |
-45/025 |
1.5 |
16.5 |
15.0 |
561.6 |
|
|
Incl |
13.0 |
14.0 |
1.0 |
8,400 |
4,900 gpt Ag |
|
And |
89.5 |
90.5 |
1.0 |
201 |
178 gpt Ag |
VU-2934 |
-35/025 |
67.5 |
85.0 |
17.5 |
8.6 |
|
|
Incl |
84.0 |
85.0 |
1.0 |
128.5 |
159 gpt Ag |
VU-2935 |
-25/025 |
4.5 |
22.5 |
18.0 |
15.0 |
|
|
Incl |
15.0 |
16.0 |
1.0 |
231 |
|
Fan 1070W_L3 |
VU-2961 |
-55/025 |
171.0 |
213.5 |
42.5 |
24.5 |
|
|
Incl |
171.0 |
173.5 |
2.5 |
98.5 |
|
|
Incl |
187.5 |
190.5 |
3.0 |
60.0 |
|
|
Incl |
212.5 |
213.5 |
1.0 |
583 |
417 gpt Ag |
|
And |
235.5 |
245.0 |
9.5 |
11.8 |
|
VU-2962 |
-45/025 |
222.0 |
236.0 |
14.0 |
191.6 |
|
|
Incl |
222.0 |
223.5 |
1.5 |
424 |
197 gpt Ag |
|
Incl |
234.0 |
235.0 |
1.0 |
1,795 |
1,375 gpt Ag |
VU-2965 |
-15/025 |
66.0 |
69.0 |
3.0 |
750 |
|
|
Incl |
67.0 |
67.6 |
0.6 |
3,560 |
2,130 gpt Ag |
|
And |
171.0 |
172.0 |
1.0 |
495 |
443 gpt Ag |
VU-2966 |
-5/025 |
131.0 |
153.0 |
22.0 |
9.7 |
|
|
Incl |
145.5 |
147.0 |
1.5 |
105 |
|
VU-2967 |
5/057 |
115.5 |
133.0 |
17.5 |
61.7 |
|
|
Incl |
132.0 |
133.0 |
1.0 |
993 |
658 gpt Ag |
(1) True thickness to be
determined. (2) All
samples were submitted for preparation and analysis by ALS Chemex
at its facilities in Terrace, B.C. All samples were analyzed using
multi-digestion with ICP-MS finish and fire assay with AA finish
for gold. Samples over 100 ppm silver were reanalyzed using four
acid digestion with an ore grade AA finish. Samples over 1,500 ppm
silver were fire assayed with a gravimetric finish. Samples with
over 10 ppm gold were fire assayed with a gravimetric finish. One
in 20 samples was blank, one in 20 was a standard sample, and one
in 20 samples had a sample cut from assay rejects assayed as a
field duplicate at ALS Chemex in North Vancouver, B.C. ALS Chemex
is independent of Pretivm.
About Pretivm
Pretivm is an intermediate gold producer with
the high-grade gold underground Brucejack Mine.
For further information contact:
Troy ShultzManager, Investor Relations
&Corporate Communications
Pretium Resources Inc.Suite
2300, Four Bentall Centre, 1055 Dunsmuir StreetPO Box 49334
Vancouver, BC V7X 1L4(604) 558-1784invest@pretivm.com (SEDAR
filings: Pretium Resources Inc.)
Regarding Forward-Looking Information
This news release contains “forward-looking
information” and “forward looking statements” within the meaning of
applicable Canadian and United States securities legislation
(collectively herein referred to as “forward-looking information”),
including the “safe harbour” provisions of Canadian provincial
securities legislation and the U.S. Private Securities Litigation
Reform Act of 1995, Section 21E of the U.S. Securities Exchange Act
of 1934, as amended, and Section 27A of the U.S. Securities Act of
1933, as amended. Wherever possible, words such as “plans”,
“expects”, “guidance”, “projects”, “assumes”, “budget”, “strategy”,
“scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”,
“intends”, “modeled”, “targets” and similar expressions or
statements that certain actions, events or results “may”, “could”,
“would”, “might” or “will” be taken, occur or be achieved, or the
negative forms of any of these terms and similar expressions, have
been used to identify forward-looking information. Forward-looking
information may include, but is not limited to: results, analyses
and interpretations of exploration and drilling programs; our
mining (including mining methods), expansion, exploration and
development activities, including the reverse circulation drill
program, our definition, sustaining, expansion and underground
exploration drill programs and our grassroots exploration program,
and the plans, specifications, targets, results, benefits, costs
and timing thereof; expectations around grade of gold and silver
production; Brucejack Mine production rate and gold recovery rate;
our operational grade control program, including plans with respect
to our infill drill program and our local grade control model;
grade reconciliation, updated geological interpretation and mining
initiatives with respect to the Brucejack Mine; our management,
operational plans and strategy; capital, sustaining and operating
cost estimates and timing thereof; the future price of gold and
silver; our liquidity and the adequacy of our financial resources
(including capital resources); our intentions with respect to our
capital resources; capital allocation plans; the estimation of
mineral resources and mineral resources including any updates
thereto; parameters and assumptions used to estimate mineral
resources and mineral resources; realization of mineral resource
and mineral resource estimates; our estimated life of mine and life
of mine plan for the Brucejack Mine; production and processing
estimates and estimated rates; estimated economic results of the
Brucejack Mine; predicted metallurgical recoveries for gold and
silver; geological and mineralization interpretations; development
of our Brucejack Mine and timing thereof; timelines and similar
statements relating to the economic viability of the Brucejack
Mine, including mine life, total tonnes mined and processed and
mining operations; updates to our mineral resources and mineral
resources and life of mine plan for the Brucejack Mine, and the
anticipated effects and timing thereof; timing, receipt, and
anticipated effects of, and anticipated capital costs in connection
with, approvals, consents and permits under applicable legislation;
the effects of the novel coronavirus (2019-nCoV) outbreak as a
global pandemic and at the Brucejack Mine, including anticipated
operational and financial impacts, and our response and contingency
plans; the effectiveness and costs of our COVID-19 management plans
including related protocols and procedures. Forward-looking
information is subject to a variety of known and unknown risks,
uncertainties and other factors that could cause actual results,
actions, events, conditions, performance or achievements to
materially differ from those expressed or implied by the
forward-looking information including, without limitation, those
related to: the effect of indebtedness on cash flow and business
operations; the effect of a pandemic and particularly the COVID-19
outbreak as a global pandemic on the Company’s business, financial
condition and results of operations and the impact of the COVID-19
outbreak on our workforce, suppliers and other essential resources
and what effect those impacts, if they occur, would have on our
business, financial condition and results of operations; the
effects of the COVID-19 outbreak as a global pandemic and at the
Brucejack Mine, including anticipated operational and financial
impacts and our response and contingency plans; the effectiveness
and costs of our COVID-19 management plans, including related
protocols and procedures; assumptions regarding expected capital
costs, operating costs and expenditures, production schedules,
economic returns and other projections; our production, grade of
gold, milling recovery, cash flow and cost estimates, including the
accuracy thereof; commodity price fluctuations, including gold and
silver price volatility; the accuracy of our Mineral Resource and
Resource estimates (including with respect to size, grade and
mining and milling recoverability) and the geological, operational
costs and price assumptions on which they are based; uncertainties
relating to inferred Mineral Resources being converted into
Measured or Indicated Mineral Resources; our ability to maintain or
increase our annual production of gold at the Brucejack Mine or
discover, develop or acquire Mineral Resources for production;
dependency on the Brucejack Mine for our future operating revenue;
the development of our properties and expansion of our operations;
our need or ability to raise enough capital to mine, develop,
expand or complete further exploration programs on our mineral
properties; our ability to generate operating revenues and cash
flow in the future; failure of counterparties to perform their
contractual obligations; general economic conditions; the inherent
risks in the mining industry; the commercial viability of our
current and any acquired mineral rights; availability of suitable
infrastructure or damage to existing infrastructure;
transportation, processing and refining risks; maintaining
satisfactory labour relations with employees and contractors;
significant governmental regulations, including environmental
regulations; non-compliance with permits that are obtained or delay
in obtaining or renewing, failure to obtain or renew permits
required in the future; increased costs and restrictions on
operations due to compliance with health, safety and environmental
laws and regulations; compliance with emerging climate change
regulation and the detrimental effects of climate change; potential
opposition from non-governmental organizations; uncertainty
regarding unsettled First Nations rights and title in British
Columbia; maintaining our social license to operate; uncertainties
related to title to our mineral properties and surface rights; land
reclamation and mine closure requirements; our ability to identify
and successfully integrate any material properties we acquire;
currency exchange rate fluctuations; competition in the mining
industry for properties, qualified personnel and management; our
ability to attract and retain qualified management and personnel;
potential inability to attract development partners or our ability
to identify attractive acquisitions; compliance with foreign
corrupt practices regulations and anti-bribery laws; changes to
rules and regulations, including accounting practices; limitations
in our insurance coverage and the ability to insure against certain
risks; risks related to ensuring the security and safety of
information systems, including cyber security risks; significant
growth could place a strain on our management systems; share
ownership by our significant shareholders and their ability to
influence our operations and governance and, in case of sales of
our shares by such significant shareholders, our share price;
failure to comply with certain terms of the convertible notes;
reputational risks; and certain actions under United States federal
securities laws may be unenforceable. This list is not exhaustive
of the factors that may affect any of our forward-looking
information. Although we have attempted to identify important
factors that could cause actual results, actions, events,
conditions, performance or achievements to differ materially from
those contained in forward-looking information, there may be other
factors that cause results, actions, events, conditions,
performance or achievements to differ from those anticipated,
estimated or intended. Our forward-looking information is based on
the assumptions, beliefs, expectations and opinions of management
on the date the statements are made, many of which may be difficult
to predict and beyond our control. In connection with the
forward-looking information contained in this news release, we have
made certain assumptions about, among other things: our business
and operations and that no significant event will occur outside of
our normal course of business and operations (other than as
expressly set out herein); planned exploration, development and
production activities and the results, costs and timing thereof;
future price of gold and silver and other metal prices; the
accuracy of our Mineral Resource and Mineral Resource estimates and
related information, analyses and interpretations (including with
respect to any updates or anticipated updates); the geology and
mineralization of the Brucejack Project; operating conditions;
capital and operating cost estimates; the results, costs and timing
of future exploration and drilling; timelines and similar
statements relating to the economic viability of the Brucejack
Mine; timing and receipt of governmental, regulatory and third
party approvals, consents, licenses and permits; obtaining required
renewals for existing approvals, consents, licenses and permits;
the geopolitical, economic, permitting and legal climate that we
operate in; the adequacy of our financial resources, and our
ability to raise any necessary additional capital on reasonable
terms; commodity prices; currency exchange rates and interest
rates; political and regulatory stability; requirements under
applicable laws; market competition; sustained labour stability and
availability of equipment; positive relations with local groups;
stability in financial capital markets; and the impact of the
COVID-19 outbreak. The Company cautions that the foregoing list of
assumptions is not exhaustive. Other events or circumstances could
cause actual results to differ materially from those estimated or
projected and expressed in, or implied by, the forward-looking
information contained in this news release. Additional information
about the risks and uncertainties concerning forward-looking
information and material factors or assumptions on which such
forward-looking information is based is provided in our public
disclosure documents as filed in Canada on SEDAR at www.sedar.com
and in the United States through EDGAR at the Security and Exchange
Commission’s (the “SEC”) website at www.sec.gov. Forward-looking
information is not a guarantee of future performance. There can be
no assurance that forward-looking information will prove to be
accurate, as actual results and future events could differ
materially from those anticipated in such information.
Forward-looking information involves statements about the future
and is inherently uncertain, and our actual achievements or other
future events or conditions may differ materially from those
reflected in the forward-looking information due to a variety of
risks, uncertainties and other factors. For the reasons set forth
above, readers should not place undue reliance on forward-looking
information. We do not assume any obligation to update
forward-looking information, whether as a result of new
information, future events or otherwise, other than as required by
applicable law. Neither the TSX nor the NYSE has approved or
disapproved of the information contained herein.
Pretium Resources (TSX:PVG)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Pretium Resources (TSX:PVG)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025