Stroud Resources Ltd. (TSXV:SDR) (“Stroud” or the “Company”) is pleased to announce that it has begun its Phase 2 diamond drilling program on its Santo Domingo Silver Property (“Santo Domingo” or the “Property”), located in Hostotipaquillo Region of Jalisco, Mexico. A 3,500 m program is planned for this phase of drilling, targeting the newly discovered Zopilote Vein (previously “New Vein”), the Guadalupe Vein and the La Raya Vein on which there is a current National Instrument 43-101 mineral resource estimate (see Stroud news releases dated 20 November 2017).

In its 2021 Phase 1 diamond drilling program, the Company completed 7,702.55 metres in 21 completed diamond drill holes and 383 metres in 5 abandoned holes. (Table 1; Figure 1). Assay results received to date are summarized in Table 2, with the results from 6 drill holes pending. Parameters for the 21 drill holes completed in 2021 are available on the Company website (www.stroudsilver.com).

The Phase 1 drilling program was successful in exploring the extent of known vein system-hosted silver mineralization on the Property and identified additional silver mineralized zones and vein systems such as Zopilote, which appear to strike parallel to the existing La Raya and Guadalupe silver vein systems (Figure 1).

The Company’s current Drilling Permit covers 13 drill pads (drill setups) located across the Property. A second drilling permit will be submitted seeking additional drill pad locations to facilitate further delineation of the three known mineralized vein systems and other exploration targets.

Table 1. Summary of 2021 Phase 1 diamond drilling on the Santo Domingo Silver Project, Mexico.

Drill Hole UTM_mE UTM_mN Elevation (m) Az Dip Length (m) Hole Type Vein System Status
SD-21-46 606383.07 2334194.03 1150.58 -50 230 308.50 Exploration Guadalupe Completed
SD-21-47 606383.07 2334194.03 1150.58 -65 230 350.00 Exploration Guadalupe Completed
SD-21-48 606383.07 2334194.03 1150.58 -80 230 375.00 Exploration Guadalupe Completed
SD-21-49 606386.23 2334189.21 1151.26 -65 50 333.00 Exploration La Raya FW Completed
SD-21-50 606785.16 2334205.80 984.54 -52 298 237.00 Delineation La Raya Completed
SD-21-51 606438.24 2334460.73 1036.04 -40 222 58.30 Exploration Guadalupe Abandoned
SD-21-52 606785.16 2334205.80 984.54 -64 279 225.00 Delineation La Raya Completed
SD-21-53 606496.37 2334188.22 1143.33 -55 230 384.00 Exploration Guadalupe Completed
SD-21-54 606496.37 2334188.22 1143.33 -65 230 324.00 Exploration Guadalupe Completed
SD-21-56 606496.37 2334188.22 1143.33 -85 230 292.50 Exploration Guadalupe Completed
SD-21-57 606438.24 2334460.73 1036.04 -72 230 317.30 Exploration Guadalupe Completed
SD-21-58 606209.14 2334152.99 1128.46 -40 240 353.00 Exploration Zopilote Completed
SD-21-68 606505.88 2334473.86 1025.02 -50 230 55.50 Exploration Guadalupe Abandoned
SD-21-68A 606505.88 2334473.86 1025.02 -55 230 405.00 Exploration Guadalupe Completed
SD-21-69 606523.85 2334431.34 1044.53 -50 230 183.00 Exploration Guadalupe Completed
SD-21-70 606523.85 2334431.34 1044.53 -50 230 69.00 Exploration Guadalupe Abandoned
SD-21-71 606618.46 2334416.30 991.20 -50 230 296.50 Delineation La Raya Completed
SD-21-72 606441.38 2334206.86 1146.00 -65 230 99.00 Exploration Guadalupe Abandoned
SD-21-73 606498.41 2334181.92 1143.64 -65 50 423.00 Exploration La Raya FW Completed
SD-21-74 606441.38 2334206.86 1146.00 -65 50 403.00 Exploration La Raya FW Completed
SD-21-75 606785.16 2334205.80 984.54 -50 285 330.00 Delineation La Raya Completed
SD-21-80 606070.17 2334155.96 1159.49 -50 230 534.00 Exploration Zopilote Completed
SD-21-81 606070.17 2334155.96 1159.49 -70 230 540.00 Exploration Zopilote Completed
SD-21-82 606070.17 2334155.96 1159.49 -65 50 537.00 Exploration Zopilote Completed
SD-21-83 606121.65 2334009.35 1152.00 -50 230 100.95 Exploration Zopilote Abandoned
SD-21-84 606327.13 2334143.84 1165.92 -55 230 552.00 Exploration Zopilote Completed
 

Table 2. Summary of results from Phase 1 drill core assays received to date.

Drill Hole From (m) To (m) Length (m)1 Au (g/t) Ag (g/t) AgEq (g/t)2 Vein System
SD-21-46 148.15 149.30 1.15 0.43 53.10 85.35 Guadalupe W
and 160.80 162.70 1.90 0.73 101.79 156.42 Guadalupe W
and 236.30 236.70 0.40 2.17 243.00 405.75 Guadalupe W
SD-21-49 87.00 89.15 2.15 0.32 70.20 94.20 Guadalupe
SD-21-49 103.45 105.00 1.55 0.01 624.00 624.75 Guadalupe
SD-21-49 131.05 133.75 2.70 0.13 42.77 52.29 Guadalupe
SD-21-50 10.65 21.00 10.35 1.22 138.48 229.88 La Raya HW
incl. 12.00 13.40 1.40 3.91 209.00 502.25 La Raya HW
incl. 13.40 14.80 1.40 0.97 336.00 408.75 La Raya HW
and 119.25 122.35 3.10 0.40 56.38 86.72 La Raya
SD-21-51 24.00 42.00 18.00 0.13 109.39 119.06 La Raya
incl. 27.00 30.00 3.00 0.18 308.00 321.50 La Raya
incl. 36.00 40.30 4.30 0.14 145.00 155.50 La Raya
SD-21-51 44.50 51.00 6.50 0.12 51.33 60.16 La Raya
incl. 44.50 48.00 3.50 0.15 80.50 91.75 La Raya
SD-21-51 57.00 58.50 1.50 0.09 44.70 51.45 La Raya
SD-21-52 10.80 25.90 15.10 1.11 112.67 195.76 La Raya
incl. 10.80 21.30 10.50 1.36 137.52 239.88 La Raya
incl. 18.50 19.90 1.40 3.07 130.00 360.25 La Raya
SD-21-52 53.10 54.95 1.85 0.18 67.60 81.10 La Raya
SD-21-52 77.95 84.70 6.75 0.21 35.33 51.24 La Raya
incl. 77.95 79.30 1.35 0.76 54.90 111.90 La Raya
SD-21-52 100.50 109.25 8.75 0.53 137.75 177.48 La Raya
incl. 100.50 105.80 5.30 0.83 213.90 276.40 La Raya
SD-21-52 113.95 114.25 0.30 0.37 81.70 109.45 La Raya
SD-21-52 121.25 122.65 1.40 0.05 26.50 30.25 La Raya
SD-21-52 132.85 134.20 1.35 0.16 71.30 83.30 La Raya
SD-21-57 6.00 10.55 4.55 0.50 138.19 175.75 La Raya
SD-21-57 12.60 13.25 0.65 0.18 50.40 63.90 La Raya
SD-21-57 14.60 20.70 6.10 1.05 197.38 276.34 La Raya
incl. 14.60 17.65 3.05 2.02 362.00 513.50 La Raya
SD-21-57 183.35 184.40 1.05 0.04 64.70 67.70 Guadalupe
SD-21-57 197.05 204.95 7.90 0.31 35.12 58.55 Guadalupe
incl. 200.50 203.40 2.90 0.63 61.52 108.52 Guadalupe
SD-21-57 213.70 217.10 3.40 0.92 67.35 136.63 Guadalupe
incl. 213.70 214.85 1.15 1.72 102.00 231.00 Guadalupe
SD-21-57 233.10 243.10 10.00 0.07 53.16 58.71 Guadalupe
incl. 233.10 241.10 8.00 0.08 56.95 63.14 Guadalupe
SD-21-57 259.60 260.80 1.20 0.26 45.25 64.94 Guadalupe
SD-21-58 265.30 267.05 1.75 0.32 32.40 56.40 Zopilote
SD-21-58 279.30 283.65 4.35 0.35 33.40 60.01 Zopilote
incl. 282.60 283.65 1.05 1.03 96.10 173.35 Zopilote
SD-21-58 291.60 293.35 1.75 0.33 39.20 63.95 Zopilote
SD-21-68A no significant assays
SD-21-69 97.30 98.30 1.00 0.16 37.50 49.50 La Raya
and 99.40 101.60 2.20 0.12 36.30 45.30 La Raya
and 109.55 110.70 1.15 0.21 111.00 126.75 La Raya FW
and 128.55 129.70 1.15 0.18 39.70 53.20 La Raya FW
and 138.45 139.65 1.20 0.17 25.80 38.55 La Raya FW
SD-21-69 148.10 161.35 13.25 1.05 80.86 159.98 Guadalupe E
incl. 152.90 158.90 6.00 1.45 122.18 230.78 Guadalupe E
incl. 152.90 154.10 1.20 2.76 171.00 378.00 Guadalupe E
SD-21-69 165.25 166.45 1.20 0.07 51.00 56.25 Guadalupe E
and 170.15 172.65 2.50 0.08 127.05 133.05 Guadalupe E
SD-21-71 8.40 12.60 4.20 0.15 31.80 43.05 La Raya
SD-21-71 16.80 41.00 24.20 0.31 201.14 224.10 La Raya
incl. 19.00 37.30 18.30 0.34 248.57 273.81 La Raya
incl. 21.40 22.45 1.05 0.48 582.00 618.00 La Raya
incl. 26.70 27.80 1.10 0.25 557.00 575.75 La Raya
incl. 31.20 34.60 3.40 0.20 206.00 221.00 La Raya
SD-21-71 108.50 120.65 12.15 0.30 60.58 83.09 La Raya
incl. 109.60 110.70 1.10 1.16 140.00 227.00 La Raya
incl. 119.50 120.65 1.15 0.34 101.00 126.50 La Raya
SD-21-71 275.10 276.35 1.25 0.51 34.90 73.15 Guadalupe
SD-21-73 no significant assays
SD-21-75 65.10 68.55 3.45 1.31 71.07 169.07 La Raya
incl. 65.10 66.25 1.15 0.54 103.00 143.50 La Raya
SD-21-75 69.70 72.00 2.30 0.28 44.15 64.78 La Raya
SD-21-75 75.15 77.55 2.40 1.81 48.13 183.78 La Raya
SD-21-75 80.25 99.80 19.55 1.31 76.50 174.53 La Raya
incl. 81.65 82.65 1.00 2.17 114.00 276.75 La Raya
incl. 86.80 87.85 1.05 1.03 120.00 197.25 La Raya
incl. 91.45 93.55 2.10 0.55 111.50 152.38 La Raya
incl. 95.75 97.10 1.35 0.85 169.00 232.75 La Raya
SD-21-80 264.00 264.35 0.35 0.51 24.80 63.05 Zopilote Zn
SD-21-81 172.60 173.40 0.80 0.22 63.20 79.70 Zopilote HW
SD-21-81 175.15 185.10 9.95 1.51 258.42 371.60 Zopilote
incl. 176.05 181.10 5.05 2.05 391.53 545.14 Zopilote
incl. 176.05 177.05 1.00 4.71 834.00 1,187.25 Zopilote
incl. 184.20 185.10 0.90 3.17 319.00 556.75 Zopilote
SD-21-81 198.70 201.60 2.90 0.48 148.14 184.26 Zopilote FW
incl. 200.80 201.60 0.80 0.63 198.00 245.25 Zopilote FW
SD-21-81 295.85 297.95 2.10 0.19 38.40 52.65 Zopilote Zn
SD-21-82 247.80 248.95 1.15 0.54 37.90 78.40 Zopilote HW
SD-21-84 330.70 332.25 1.55 0.14 50.80 61.30 Zopilote HW

1drill core lengths are not true widths and are reported as core intervals.2AqEq calculated using a silver to gold ratio of 75:1 and assuming recoveries of 100%.

A map accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/7b843717-312b-4042-a2c4-c6cba75b58c4

Dr. Scott Jobin-Bevans (P.Geo.), President and a Director of Stroud, is the Qualified Person as defined by National Instrument 43-101 and is responsible for the technical information contained in this news release.

About Stroud Resources Ltd.Stroud Resources is a TSXV listed company (TSXV:SDR) focused on the exploration and development of its Santo Domingo epithermal silver project in central Mexico.

For more information, please visit www.stroudsilver.com or contact Mirsad Jakubovic, Chief Financial Officer, Stroud Resources Ltd., Tel: 1-416-888-8731, mirsad@cpamba.ca.

THE TSX VENTURE EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT RESPONSIBILITY  FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

The information contained herein contains "forward-looking statements" within the meaning of applicable securities legislation. Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. Any statements that express predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance are not statements of historical fact and may be “forward-looking statements”.

Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to the interpretation of the drill results, geology, grade and continuity of mineral deposits. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty to forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances. Actual events or results could differ materially from the Company’s expectations or projections.

Stroud Resources (TSXV:SDR)
Gráfico Histórico do Ativo
De Nov 2024 até Dez 2024 Click aqui para mais gráficos Stroud Resources.
Stroud Resources (TSXV:SDR)
Gráfico Histórico do Ativo
De Dez 2023 até Dez 2024 Click aqui para mais gráficos Stroud Resources.