Victoria Gold Corp. (TSX-VGCX) (“Victoria” or the “Company”) has
filed an updated technical report on its 100% owned Eagle Gold Mine
(the “Report”), as reported in the Company’s news release dated
February 24, 2023. The Report was prepared in accordance with the
National Instrument 43-101 Standards of Disclosure for Mineral
Projects. The Report can be found on the Company’s website at
www.vgcx.com or under the Company’s issuer profile at
www.sedar.com.
Summary of Updated Technical Report:
The Report considers cost and operating data
from the last three years of operations at the Eagle Gold Mine.
Optimizations incorporated in the Report include year-round
stacking on the heap leach facility (“HLF”), stockpiling of lower
grade material for end of mine life processing, and utilization of
a mobile crusher to supplement and increase production rates. Key
highlights of the updated plan are:
-
After-tax net present value (“NPV”) at a 5% discount of $954
million ($1,257 million pre-tax), at US$1,700 per ounce of gold and
a US$:C$ exchange rate of 0.75.
-
Average gold production of 202,000 ounces per year over the first 8
years, with peak production of 219,000 gold ounces in 2025.
-
Average free cash flow (“FCF”) of $166 million per year for the
first 8 years with a total of $1,602 million of FCF over the
LOM.
-
Total gold production of 2,048,000 ounces over a mine life of 12
years. This total does not include gold production prior to 31
December 2022.
-
LOM All-in Sustaining Cost (“AISC”) of US$1,114 per ounce of gold
providing significant operating and profit margins at current gold
prices.
-
Throughput increase to steady-state level of 11.5 million tonnes
processed per annum during 2025.
Qualified PersonThe technical
content of this news release has been reviewed and approved by Paul
D. Gray, P.Geo., as the “Qualified Person” as defined in National
Instrument 43-101 - Standards of Disclosure for Mineral
Projects.
About the Dublin Gulch
PropertyVictoria Gold's 100%-owned Dublin Gulch gold
property (the “Property”) is situated in central Yukon Territory,
Canada, approximately 375 kilometers north of the capital city of
Whitehorse, and approximately 85 kilometers from the town of Mayo.
The Property is accessible by road year round, and is located
within Yukon Energy's electrical grid.
The Property covers an area of approximately 555
square kilometers, and is the site of the Company's Eagle and Olive
Gold Deposits. The Eagle and Olive deposits include Proven and
Probable Reserves of 2.6 million ounces of gold from 124 million
tonnes of ore with a grade of 0.65 grams of gold per tonne. The
Mineral Resource for the Eagle and Olive Gold Deposits has been
estimated to host 245 million tonnes averaging 0.59 grams of gold
per tonne, containing 4.7 million ounces of gold in the "Measured
and Indicated" category, inclusive of Proven and Probable Reserves,
and a further 36 million tonnes averaging 0.63 grams of gold per
tonne, containing 0.7 million ounces of gold in the "Inferred"
category.
Non-IFRS Performance Measures
The Company has included certain non-IFRS measures in this new
release. Refer to the Company’s MD&A for an explanation,
discussion and reconciliation of non-IFRS measures. The Company
believes that these measures, in addition to measures prepared in
accordance with International Financial Reporting Standards
(“IFRS”), provide readers with an improved ability to evaluate the
underlying performance of the Company and to compare it to
information reported by other companies. The non-IFRS measures are
intended to provide additional information and should not be
considered in isolation or as a substitute for measures of
performance prepared in accordance with IFRS. These measures do not
have any standardized meaning prescribed under IFRS, and therefore
may not be comparable to similar measures presented by other
issuers.
Cautionary Language and Forward-Looking
StatementsThis press release includes certain statements
that may be deemed "forward-looking statements". Except for
statements of historical fact relating to Victoria, information
contained herein constitutes forward-looking information, including
any information related to the intended use of proceeds from the
Term Facility and the Revolving Credit Facility, the amended terms
and conditions of the Loan Facility, and Victoria's strategy, plans
or future financial or operating performance. Forward-looking
information is characterized by words such as “plan”, “expect”,
“budget”, “target”, “project”, “intend”, “believe”, “anticipate”,
“estimate” and other similar words, or statements that certain
events or conditions “may”, “will”, “could” or “should” occur, and
includes any guidance and forecasts set out herein (including, but
not limited to, production and operational guidance of the
Corporation). In order to give such forward-looking information,
the Corporation has made certain assumptions about its business,
operations, the economy and the mineral exploration industry in
general, in particular in light of the impact of the novel
coronavirus and the COVID-19 disease (“COVID-19”) on each of the
foregoing. In this respect, the Corporation has assumed that
production levels will remain consistent with management’s
expectations, contracted parties provide goods and services on
agreed timeframes, equipment works as anticipated, required
regulatory approvals are received, no unusual geological or
technical problems occur, no material adverse change in the price
of gold occurs and no significant events occur outside of the
Corporation's normal course of business. Forward-looking
information is based on the opinions, assumptions and estimates of
management considered reasonable at the date the statements are
made, and are inherently subject to a variety of risks and
uncertainties and other known and unknown factors that could cause
actual events or results to differ materially from those described
in, or implied by, the forward-looking information. These factors
include the impact of general business and economic conditions,
risks related to COVID-19 on the Company, global liquidity and
credit availability on the timing of cash flows and the values of
assets and liabilities based on projected future conditions,
anticipated metal production, fluctuating metal prices, currency
exchange rates, estimated ore grades, possible variations in ore
grade or recovery rates, changes in accounting policies, changes in
Victoria's corporate resources, changes in project parameters as
plans continue to be refined, changes in development and production
time frames, the possibility of cost overruns or unanticipated
costs and expenses, uncertainty of mineral reserve and mineral
resource estimates, higher prices for fuel, steel, power, labour
and other consumables contributing to higher costs and general
risks of the mining industry, failure of plant, equipment or
processes to operate as anticipated, final pricing for metal sales,
unanticipated results of future studies, seasonality and
unanticipated weather changes, costs and timing of the development
of new deposits, success of exploration activities, requirements
for additional capital, permitting time lines, government
regulation of mining operations, environmental risks, unanticipated
reclamation expenses, title disputes or claims, limitations on
insurance coverage and timing and possible outcomes of pending
litigation and labour disputes, risks related to remote operations
and the availability of adequate infrastructure, fluctuations in
price and availability of energy and other inputs necessary for
mining operations. Although Victoria has attempted to identify
important factors that could cause actual actions, events or
results to differ materially from those described in, or implied
by, the forward-looking information, there may be other factors
that cause actions, events or results not to be anticipated,
estimated or intended. There can be no assurance that
forward-looking information will prove to be accurate, as actual
results and future events could differ materially from those
anticipated in such statements. The reader is cautioned not to
place undue reliance on forward-looking information. The
forward-looking information contained herein is presented for the
purpose of assisting investors in understanding Victoria's expected
financial and operational performance and Victoria's plans and
objectives and may not be appropriate for other purposes. All
forward-looking information contained herein is given as of the
date hereof, as the case may be, and is based upon the opinions and
estimates of management and information available to management of
the Corporation as at the date hereof. The Corporation undertakes
no obligation to update or revise the forward-looking information
contained herein and the documents incorporated by reference
herein, whether as a result of new information, future events or
otherwise, except as required by applicable laws.
For Further Information
Contact:John McConnellPresident & CEOVictoria Gold
Corp.Tel: 604-696-6605ceo@vgcx.com
Victoria Gold (TSX:VGCX)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Victoria Gold (TSX:VGCX)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025