Red Pine Exploration Inc. (
TSXV: RPX,
OTCQB: RDEXF) (“Red Pine” or the “Company”) reports new
drilling results from its ongoing exploration program. The new
results validate the presence and continuity of gold mineralization
in the Sadowski Vein Network (Figure 1).
There is confirmation of significant gold
mineralization continuity in the Sadowski Vein Network located
above the Jubilee and the Minto Mine shears (Figures 2 and 3):
-
Near-surface intersection of 2.64 g/t gold over 25.61 metres in
SD-23-437 that includes 34.64 g/t Au over 1.75 metres (Figure 3)
approximately 40 metres down-dip of the intersection of 52.12 g/t
gold over 2.29 metres in SD-22-350 (see press release May 16,
2022)
-
Adjacent near-surface intersection contains 1.36 g/t gold over
11.02 metres including 27.1 g/t gold over 0.50 m in SD-23-436
(Figure 3)
The Sadowski Vein Network and the presence of
near-surface gold mineralization is further confirmed with diamond
drilling over a strike length of 150 metres with the intersection
of 4.95 g/t gold over 1.00 metres in SD-23-438 (Figure 2).
Surface grab samples acquitted in the 1990s from
Van Ollie Exploration containing between 2.06 g/t Au and 13.38 g/t
Au indicate the presence of mineralization associated with quartz
veins up to 160 metres east of the currently drill-tested
footprints of the Sadowski Vein Network (AFRI 41N15NE0011) This
suggests a potential strike length exceeding 300 metres for the
Sadowski Vein Network (Figure 2). Mineralization is now known to
extend between surface and approximately 90 m vertical depth in the
Sadowski Vein Network.
The reader is cautioned that the results are
historical in nature and that the Qualified Person has not done
enough to verify the historical results and that grab samples are
selective by nature and are not representative of the actual grade
of the tested mineralization.
Quentin Yarie, President, and CEO of Red Pine
Exploration comments:
“The latest results from the testing of the
Sadowski Vein Network confirms the potential to add further
mineralization in the hanging wall of the Minto Mine and Surluga
Deposits. Our drilling also continues to extend the vein system to
the east and illustrates the additional potential of the
extensional vein networks forming significant zones of
mineralization around our two deposits.”
Table 1 – Highlights from drilling in the Sadowski Vein
Network (Figure 1)
Hole |
From (m) |
To |
Length (m)* |
Visible Gold |
Gold (g/t) |
Zone |
|
|
(m) |
|
|
|
|
SD-23-436 |
6.18 |
17.20 |
11.02 |
VG |
1.36 |
Sadowski Vein Network |
Including |
16.7 |
17.2 |
0.50 |
VG |
27.50 |
SD-23-437 |
10.62 |
36.23 |
25.61 |
VG |
2.64 |
Including |
16.74 |
17.48 |
0.74 |
VG |
50.70 |
17.48 |
18.49 |
1.01 |
VG |
22.70 |
42.53 |
45.05 |
2.52 |
|
0.54 |
SD-23-438 |
40.64 |
41.64 |
1.00 |
|
4.95 |
65.62 |
66.97 |
1.35 |
|
0.64 |
SD-23-439 |
44.00 |
45.00 |
1.00 |
VG |
0.49 |
57.78 |
59.00 |
1.22 |
|
0.66 |
SD-23-440 |
N.S.R. |
|
Assay results presented over core length. True width for the
intersections varies between 40 to 75%. |
|
Quality Assurance/Quality Control ("QA/QC")
Measures
Drill core samples were transported in security
sealed bags for analyses to Actlabs in Ancaster, Ontario.
Individual samples were labelled, placed in plastic sample bags and
sealed. Groups of samples were then placed into durable rice bags
and shipped. The residual coarse reject portions of the samples
remain in storage if further work or verification is needed.
Red Pine has implemented a quality-control
program to comply with best practices in the sampling and analysis
of drill core. As part of its QA/QC program, Red Pine inserts
external gold standards (low to high grade) and blanks every 20
samples in addition to random standards, blanks, and
duplicates.
Qualified Person
Quentin Yarie, P.Geo. and Chief Executive
Officer of Red Pine and the Qualified Person, as defined by
National Instrument 43-101, has reviewed, and approved the news
release’s technical information.
About Red Pine Exploration
Inc.
Red Pine Exploration Inc. is a gold exploration
company headquartered in Toronto, Ontario, Canada. The Company's
shares trade on the TSX Venture Exchange under the symbol "RPX" and
on the OTCQB Markets under the symbol “RDEXF”.
The Wawa Gold Project is in the Michipicoten
Greenstone Belt of Ontario, a region that has seen major investment
by several producers in the last five years. Its land package hosts
numerous historic gold mines and is over 6,900 hectares in size.
Led by Quentin Yarie, CEO, who has over 25 years of experience in
mineral exploration, Red Pine is strengthening its position as a
major mineral exploration and development player in the
Michipicoten region.
For more information about the Company,
visit www.redpineexp.com
Or contact: Quentin Yarie, President and CEO,
(416) 364-7024, qyarie@redpineexp.com
Or
Carrie Howes, Director Corporate Communications, (416)
644-7375, chowes@redpineexp.com
1 National Instrument 43-101 Technical Report
for the Wawa Gold Project, Brian Thomas P.Geo. Golder Associates
Ltd, report effective August 18, 2021.
Neither TSX Venture Exchange nor its Regulation
Services Provider (as that term is defined in policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Cautionary Note Regarding Forward-Looking
Information
This news release contains statements which constitute
“forward-looking information” within the meaning of applicable
securities laws, including statements regarding the plans,
intentions, beliefs and current expectations of the Company with
respect to future business activities and operating
performance.
Forward-looking information is often identified by the words
“may”, “would”, “could”, “should”, “will”, “intend”, “plan”,
“anticipate”, “believe”, “estimate”, “expect” or similar
expressions. Forward-looking information contained in this news
release includes but may not be limited to:” the potential for a
hybrid pit and underground project”. Investors are cautioned that
forward-looking information is not based on historical facts but
instead reflect management’s expectations, estimates or projections
concerning future results or events based on the opinions,
assumptions and estimates of management considered reasonable at
the date the statements are made. Such opinions, assumptions and
estimates are inherently subject to a variety of risks and
uncertainties that could cause actual events or results to differ
materially from those projected and undue reliance should not be
placed on such information, as unknown or unpredictable factors
could have material adverse effects on future results, performance
or achievements. Among the key factors that could cause actual
results to differ materially from those projected in the
forward-looking information are the following: the Company's
expectations in connection with the projects and exploration
programs being met, the impact of general business and economic
conditions, global liquidity and credit availability on the timing
of cash flows and the values of assets and liabilities based on
projected future conditions, fluctuating gold prices, currency
exchange rates (such as the Canadian dollar versus the United
States Dollar), variations in ore grade or recovery rates, changes
in accounting policies, changes in the Company's mineral reserves
and resources, changes in project parameters as plans continue to
be refined, changes in project development, construction,
production and commissioning time frames, the possibility of
project cost overruns or unanticipated costs and expenses, higher
prices for fuel, power, labour and other consumables contributing
to higher costs and general risks of the mining industry, failure
of plant, equipment or processes to operate as anticipated,
unexpected changes in mine life, seasonality and weather, costs and
timing of the development of new deposits, success of exploration
activities, permitting time lines, government regulation of mining
operations, environmental risks, unanticipated reclamation
expenses, title disputes or claims, and limitations on
insurance.
This information is qualified in its entirety by cautionary
statements and risk factor disclosure contained in filings made by
the Company, including the Company’s annual information form,
financial statements and related MD&A for the year ended July
31, 2022, and the interim financial reports and related MD&A
for the period ended April 30, 2023, filed with the securities’
regulatory authorities in certain provinces of Canada and available
at www.sedar.com.
Should one or more of these risks or uncertainties materialize,
or should assumptions underlying the forward-looking information
prove incorrect, actual results may vary materially from those
described herein as intended, planned, anticipated, believed,
estimated or expected. Although the Company has attempted to
identify important risks, uncertainties and factors which could
cause actual results to differ materially, there may be others that
cause results not to be as anticipated, estimated or intended. The
Company does not intend, and does not assume any obligation, to
update this forward-looking information except as otherwise
required by applicable law.
Figure 1 - Mineralized Zones on the Wawa Gold Project, showing
the location of the current drill results
https://www.globenewswire.com/NewsRoom/AttachmentNg/ce127a4c-728f-45a8-ad22-ff540a833777
Figure 2 - Sadowski Vein Network drilling results up to 50.7 g/t
Au from 2023 with 1990 Van Ollie Exploration
https://www.globenewswire.com/NewsRoom/AttachmentNg/8f8644a7-2ea4-4a6c-a272-10f453e7c5bb
Figure 3 - Cross-Section of the 2023 Sadowski Vein Network
drilling in the Hanging Wall of the Surluga Deposit
https://www.globenewswire.com/NewsRoom/AttachmentNg/61d34400-8128-4557-940d-20a0c09043bd
Red Pine Exploration (TSXV:RPX)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Red Pine Exploration (TSXV:RPX)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025