Blue River Resources Ltd. ("Blue River" or the "Company") (TSX VENTURE:BXR)
announces it has received Approval for it's Mines Act Permit Amendment from the
BC Ministry of Energy and Mines for its 100%-owned Castle Copper Project,
located 12 km northeast of Princeton BC. The exploration permit is for 20
diamond drill holes from 20 drill set-ups and 10 trenches.


The Castle Project totals over 18,000 acres in size, covering an estimated 8 km
strike length of the north/south trending Nicola Fault. The Nicola Fault has
been interpreted to regionally control copper mineralization found at the Copper
Mountain Mine and in the Princeton area. 


The Company's initial 2011 diamond drilling program defined copper
porphyry-style mineralization over, and beyond the extent of a
500-metre-by-150-metre zone of surface copper mineralization and copper-in-soil
geochemical anomalies previously identified by the Company. The 2011 drilling
program was designed to test lithology, and alteration beneath the known surface
mineralization and it identified strong epidote-chlorite and quartz-sericite
alteration, which is consistent with a copper porphyry mineralized system,
similar to Copper Mountain Mining's operating Copper Mountain mine, located 25
kilometers south of the Castle Property. 


President Griffin Jones states "The initial drill program on the Castle Copper
Project encountered copper mineralization in 8 of the 10 holes drilled last
year. Of particular interest is the last hole drilled, BXR-11-9, which
intersected 200 metres (600 feet) of copper porphyry-style alteration and
mineralization, indicating the potential for a large porphyry system. This area,
called the Christian Zone, will be the focus of the upcoming diamond drill
program."


Earlier this year, Blue River uncovered historic drilling information from a
1972 drilling program on the Property from a B.C. Government Property File
research program. This information indicates that copper mineralization may
extend to the North and West of the 2011 drilling campaign on the Castle Copper
Project, specifically near the Christian Zone area. 


Drilling equipment and personnel are being mobilized.

The technical information contained in this news release was reviewed and
approved by Paul D. Gray, P. Geo, Company Director, and a qualified person as
defined under National Instrument 43-101.


ON BEHALF OF THE BOARD OF DIRECTORS

Griffin Jones, President

This news release contains forward-looking statements, which relate to future
events or future performance and reflect management's current expectations and
assumptions. Such forward-looking statements reflect management's current
beliefs and are based on assumptions made by and information currently available
to the Company. Investors are cautioned that these forward looking statements
are neither promises nor guarantees, and are subject to risks and uncertainties
that may cause future results to differ materially from those expected. These
forward-looking statements are made as of the date hereof and, except as
required under applicable securities legislation, the Company does not assume
any obligation to update or revise them to reflect new events or circumstances.


All of the forward-looking statements made in this press release are qualified
by these cautionary statements and by those made in our filings with SEDAR in
Canada (available at www.sedar.com) and in other reports on our website at
www.blueriv.com.


Blue River Resources (TSXV:BXR)
Gráfico Histórico do Ativo
De Out 2024 até Nov 2024 Click aqui para mais gráficos Blue River Resources.
Blue River Resources (TSXV:BXR)
Gráfico Histórico do Ativo
De Nov 2023 até Nov 2024 Click aqui para mais gráficos Blue River Resources.