VANCOUVER, Oct. 1 /PRNewswire-FirstCall/ - Opawica
Explorations Inc. (TSX.V; OPW)("Opawica" / the "Company") announces
the following assay results from drilling on the Company's 100%
owned Atikwa Lake Gold and Copper project located near Kenora, Ontario and about 60km northeast of
Rainy River Resources Gold Project.
Assay Results Received For Opawica 2010 Drilling - Atikwa Lake Property
-------------------------------------------------------------------------
From To Width Au AuEQ
Hole # Section Zone (m) (m) (m) g/t Cu % g/t
-------------------------------------------------------------------------
Maybrun
AT-10-05 992 N FW 488.0 526.5 38.5 0.37 0.204 0.72
-------------------------------------------------------------------------
inclu-
ding 514.0 526.5 12.5 0.64 0.180 0.95
-------------------------------------------------------------------------
inclu-
ding 515.0 518.0 3.0 1.45 0.135 1.68
-------------------------------------------------------------------------
609.0 610.0 1.0 2.55 0.011 2.57
-------------------------------------------------------------------------
648.0 649.0 1.0 1.37 0.003 1.38
-------------------------------------------------------------------------
-------------------------------------------------------------------------
Maybrun
AT-10-06 882 N Main 41.0 71.0 30.0 0.39 0.470 1.20
-------------------------------------------------------------------------
inclu-
ding 41.0 53.0 12.0 0.65 0.668 1.80
-------------------------------------------------------------------------
inclu-
ding 50.0 53.0 3.0 0.72 2.003 4.15
-------------------------------------------------------------------------
-------------------------------------------------------------------------
Maybrun
AT-10-07 908 N Main 12.0 51.0 39.0 0.60 0.707 1.81
-------------------------------------------------------------------------
inclu-
ding 33.0 37.0 4.0 2.41 1.278 4.60
-------------------------------------------------------------------------
and 45.0 46.0 1.0 5.06 0.964 6.71
-------------------------------------------------------------------------
-------------------------------------------------------------------------
Maybrun
AT-10-09 956 N Main 2.0 56.0 54.0 0.40 0.604 1.44
-------------------------------------------------------------------------
inclu-
ding 23.0 41.0 18.0 0.43 0.858 1.90
-------------------------------------------------------------------------
and 45.0 47.0 2.0 2.47 1.895 5.72
-------------------------------------------------------------------------
-------------------------------------------------------------------------
Maybrun
AT-10-10 883 N Main 3.0 20.0 17.0 1.37 0.527 2.27
-------------------------------------------------------------------------
inclu-
ding 16.0 17.0 1.0 10.93 0.607 11.97
-------------------------------------------------------------------------
26.0 60.0 34.0 0.33 0.553 1.28
-------------------------------------------------------------------------
inclu-
ding 26.0 39.0 13.0 0.55 1.062 2.37
-------------------------------------------------------------------------
inclu-
ding 34.0 39.0 5.0 1.12 1.851 4.29
-------------------------------------------------------------------------
-------------------------------------------------------------------------
Maybrun
AT-10-11 977 N Main 8.0 31.0 23.0 0.17 0.477 0.99
-------------------------------------------------------------------------
36.0 39.7 3.7 0.33 0.693 1.52
-------------------------------------------------------------------------
42.6 60.0 17.4 0.55 0.582 1.55
-------------------------------------------------------------------------
inclu-
ding 46.0 55.0 9.0 0.77 0.894 2.30
-------------------------------------------------------------------------
-------------------------------------------------------------------------
Maybrun
AT-10-12 924 N Main 18.0 52.0 34.0 1.26 0.538 2.18
-------------------------------------------------------------------------
inclu-
ding 24.0 41.0 17.0 2.22 0.789 3.57
-------------------------------------------------------------------------
inclu-
ding 31.0 33.0 2.0 16.67 3.180 22.12
-------------------------------------------------------------------------
inclu-
ding 32.0 33.0 1.0 32.42 1.410 34.84
-------------------------------------------------------------------------
Note: AuEQ (Au Equivalent) calculated using US $800 per oz for Au and
$2.00 per lb for Cu: AuEQ = (Cu*22.05*2.00/800*
31.1035)
Hole AT-10-05 was drilled into the Footwall Zone while the
balance of the above holes were infill holes drilled within the
open pit of the Maybrun Main Zone Indicated Resource. This infill
drilling was recommended in conjunction with the Company's
August 16, 2010 Preliminary Scoping
Study filed on SEDAR.
Assays are pending on one deep Footwall Zone hole (AT-10-24) and
12 further infill holes from the Maybrun Main open pit zone.
Further drilling has been recommended.
The above drill holes are approximately 90% true widths. The
AuEq calculations in this release represent head grades and does
not include metallurgical recoveries or net smelter returns for
gold and copper. All assaying of the above drill core was completed
by AGAT Laboratories of Mississauga,
Ontario.
Mr. Robert Laakso, P.Eng., is the
Qualified Person for the Atikwa Lake property and he has reviewed
the contents of this release.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release. The forgoing information may contain
forward-looking statements relating to the future performance of
the Company. Forward looking statements, specifically those
concerning future performance, are subject to certain risks and
uncertainties, and actual results may differ materially. These
risks and uncertainties are detailed from time to time in the
Company's filings with the appropriate regulatory authorities. We
seek safe harbour.
SOURCE Opawica Explorations Inc.
Copyright t. 1 PR Newswire