Drilling Update - Komana East
15 Abril 2008 - 7:15AM
UK Regulatory
Drilling Update - Komana East
Glencar Mining plc
15 April 2008
Drilling Update
Glencar intersects 56 metres at 3.72 grams/tonne in Komana East
drilling programme
Highlights
- - Current drilling programme will impact very significantly on the
next Komana resource update
- - Strike length of mineralisation drilled to date extended to 1,100
metres
- - Average grade of mineralisation intersected in the ore zone is in
excess of 3.5 grams/tonne
- - Latest drilling results include 56m at 3.72 grams/tonne and 16
metres at 14.6 grams/tonne
- - Further stepout drilling results awaited and drilling is continuing
Glencar Mining plc , ("Glencar" or "the Company"), the AIM and IEX
listed company with gold exploration interests in Africa, is pleased
to announce assay results from the ongoing drilling campaign at
its Komana East target in southern Mali.
The assay results reported below confirm the belief that the Komana
East deposit is one with considerable size potential. The
consistently good widths and the high average grades encountered mean
that resource gold ounces can be quickly developed. Glencar
controls a total of 23 kilometres of strike length along the shear
structure to the north and south of Komana East within the Komana
licence and the mineralisation there is open along strike in both
directions and at depth. An additional nine kilometres of strike
length to the north is controlled by Glencar within the Sanioumale
licence, one of the licences under joint venture with a subsidiary of
Gold Fields Limited.
Since our last statement on 26 March 2008, Glencar has continued to
drill the Komana East target with very exciting results. The
programme to date comprises 34 holes, for 3,918 metres of RC drilling
and 255 metres of diamond core drilling. Of the 34 holes drilled at
Komana East to date, assays have been received for 20 holes. The
latest holes reported in this release were drilled both as 100 metre
stepout fencelines to the north and south of the previously reported
results, and deeper, cored drillholes within the previously drilled
zone (Note 1). The results of the latest holes drilled through the
ore zone are as follows:
KEDD344 16 metres at 14.6 grams/tonne (uncut) or 16 metres at 11.9
grams/tonne (cut) from 111 metres to 127 metres and the hole
bottomed in the ore zone (Note 2).
KERC361 56 metres at 3.72 grams/tonne from 21 metres to 77 metres and
the hole bottomed in the ore zone due to rig breakdown.
KERC416 13 metres at 1.83 grams/tonne from 81 metres to 94 metres
Assay results are awaited from two further stepout fencelines to the
south and from two stepout fencelines to the north. The northern
fencelines, in particular, each displayed very extensive, visual
indications of good grade mineralization. If these boreholes in the
northern stepout fencelines report ore grade assays as expected, the
drilled strike length of the main ore zone will then be 1,300 metres
with assays still awaited from two further 100 metre stepout
fencelines to the south.
Other holes which were drilled outside of the projected ore zone
returned the following assays:
KERC143 2 metres at 4.85 grams/tonne from 20 metres to 22 metres
KERC146 3 metres at 1.73 grams/tonne from 43 metres to 46 metres
Boreholes KERC139, KERC144 and KERC147, KERC360, KERC362 and KERC365,
all drilled outside the projected ore zone, did not report
significant grades above 0.5 grams/tonne.
Because of the importance of the results at Komana East, and in view
of the delays being experienced in receiving assay results from the
laboratory, we have requested the laboratory to prioritise the
results from Komana East which means that the outstanding results
from Komana West and Solona drilling will be received after those
from Komana East.
The Komana East target is approximately seven kilometres east of
Glencar's Komana West deposit and drilling by the previous licencee
Randgold in the area in the 1990s had already outlined a non - JORC
compliant resource of 280,000 ounces of gold. The mineralization at
Komana East is contained within a brecciated, silicious metasediment.
Details of the drillhole locations will be published shortly on the
Company's website at www.glencarmining.ie
We are very pleased to be able to report such exciting drilling
results from the Komana East target. It is the culmination of a
carefully constructed exploration programme in a very prospective
area, which has already shown its great potential in the discovery of
the Komana West deposit. The emerging Komana East deposit points to
the likely development of a mining camp in the Komana region,
comprising both Komana East and West deposits, with still excellent
potential both for extensions to the existing deposits and the
discovery of additional satellite deposits within this highly
prospective Sankarani shear system. We anticipate that current
drilling programme will impact very significantly on the next Komana
resource update.
Hugh McCullough, EurGeol., PGeo, Managing Director of Glencar, is a
member of the Institute of Geologists of Ireland. He is a qualified
person as defined in the Guidance Note for Mining, Oil and Gas
Companies, March 2006, of the London Stock Exchange. He has reviewed
and approved the technical information contained in this
announcement.
Note 1 - the Company has in place a comprehensive QA/QC programme
designed to ensure the integrity and quality of sampling and assay
results. All assays have been carried out at SGS Analabs laboratory
at Morila Mine in Mali.
Note 2 - In order to reduce the influence of exceptionally high assay
values for purposes of evaluating overall grades, it has been decided
to cut any higher values to a maximum grade of 30 grams/tonne and
grades are quoted herein in both cut and uncut form.
Notes to Editors
Glencar is a Dublin-based exploration company with a focus on
exploration and development of gold deposits in Africa. Glencar has
found major gold deposits in Ghana, West Africa in both the 1980s and
in the 1990s. The Company has operations in Mali and Ghana in West
Africa and in Uganda in East Africa.
For further information please contact:
Glencar Mining plc
Hugh McCullough, Managing Director
Tel: +353 1 661 9974
e-mail: info@glencarmining.ie
Bishopsgate Communications
Nick Rome/Fran Read
Tel: +44 20 7562 3350
e-mail: nick@bishopsgatecommunications.com
Davy Corporate Finance
Brian Corr, Associate Director
Tel: +353 1 679 6363
- ---END OF MESSAGE---
Georgina Energy (LSE:GEX)
Gráfico Histórico do Ativo
De Fev 2025 até Mar 2025
Georgina Energy (LSE:GEX)
Gráfico Histórico do Ativo
De Mar 2024 até Mar 2025