Orezone Gold Corporation (TSX:ORE) is pleased to announce
additional positive oxide and sulphide drill results from the
recently completed 215,000 m infill and expansion drill program at
its 100% owned Bombore Gold Project in Burkina Faso, West Africa.
Results include 146 reverse circulation (RC) holes (8,786 m) and 83
diamond drill (DD) core holes (13,163 m) from the northern portion
of the 11 km long Bombore resource (see Table 3. below). The
majority of these core results are from the northern P8P9 area
which comprises a significant portion of the 2010 resource. The
remaining 35,000 m of results are expected in May and a full NI
43-101 compliant resource update will be released at the end of
June.
"These results confirm the more robust nature of the P8P9 area
with respect to continuity, widths and grades that occurs to depths
of 120 m, the current average depth drilling," said Ron Little, CEO
for Orezone. "This further highlights the potential to
significantly expand and upgrade the Bombore resource and improve
the grade and preliminary economics of the project announced in
June 2011."
Resource Definition Drilling
Orezone has completed 115,423 m of new RC drilling and 101,317 m
of new core drilling on Bombore. Over 92,000 m of RC results and
82,000 of core results have been received, including 100% of the
results from the southern portion of the project for which resource
modeling is already in progress. Further expansion and exploration
drilling will continue during the second quarter in the southern
portion of the project with two core rigs and Orezone's own RC rig,
with a focus on the Siga South area; those results are expected
during the third quarter.
Regional Exploration
Reconnaissance mapping and prospecting is ongoing with auger
drilling to commence this month on the new Toeyoko permit and also
on Bombore I permit new oxide targets; those results are expected
during the third quarter.
Table 1. Cumulative Current Program Results Reported to Date
----------------------------------------------------------------------------
Current Program Results Reported to Date Average Grade
----------------------------------------------------------------------------
Uncut Cut(1)
Zone Holes meters % Complete (g/t) (g/t)
----------------------------------------------------------------------------
CFU - RC 9 582 7% 1.22 1.13
----------------------------------------------------------------------------
CFU - DD 4 653 17% 1.17 1.09
----------------------------------------------------------------------------
Maga - RC 142 8,962 41% 1.22 1.13
----------------------------------------------------------------------------
Maga - DD 59 8,872 44% 1.17 1.09
----------------------------------------------------------------------------
P8P9 - RC 613 39,400 99% 1.20 1.03
----------------------------------------------------------------------------
P8P9 - DD 159 25,781 93% 1.20 0.99
----------------------------------------------------------------------------
North - RC 764 48,944 68% 1.20 1.05
----------------------------------------------------------------------------
North - DD 222 35,306 67% 1.20 1.02
----------------------------------------------------------------------------
P11 - RC 239 12,517 100% 1.02 0.97
----------------------------------------------------------------------------
P11- DD 75 10,878 100% 1.06 0.96
----------------------------------------------------------------------------
Siga E - RC 182 9,893 100% 1.05 0.96
----------------------------------------------------------------------------
Siga E - DD 78 11,354 100% 1.27 1.06
----------------------------------------------------------------------------
Siga W - RC 146 7,401 100% 0.92 0.88
----------------------------------------------------------------------------
Siga W - DD 74 10,450 100% 0.90 0.87
----------------------------------------------------------------------------
Siga S - RC 208 10,517 100% 2.20 0.97
----------------------------------------------------------------------------
Siga S - DD 60 9,619 100% 1.08 1.01
----------------------------------------------------------------------------
South - RC 775 40,328 100% 1.45 0.95
----------------------------------------------------------------------------
South- DD 287 42,301 100% 1.07 0.97
----------------------------------------------------------------------------
P17 N - RC 4 201 100% 0.98 0.98
----------------------------------------------------------------------------
P17 N - DD 0 0 100%
----------------------------------------------------------------------------
P17 - RC 25 1,227 100% 2.24 1.86
----------------------------------------------------------------------------
P17 - DD 23 2,879 100% 1.50 1.38
----------------------------------------------------------------------------
P16 - RC 29 1,544 100% 1.36 1.30
----------------------------------------------------------------------------
P16 - DD 16 1,983 58% 3.12 1.97
----------------------------------------------------------------------------
SE - RC 58 2,972 100% 1.63 1.46
----------------------------------------------------------------------------
SE - DD 39 4,862 72% 2.31 1.67
----------------------------------------------------------------------------
----------------------------------------------------------------------------
All - RC 1,597 92,244 80% 1.32 1.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
All - DD 548 82,468 81% 1.18 1.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
(1) Weighted average grade of individual assays, cut to 5 g/t, that occur
both in and outside the 2010 Whittle pit shells
Table 2. Breakdown of Drilling Meterage for this Release
----------------------------------------------------------------------------
Zone Diamond Drill Reverse Circulation
------------------------------------------------------------
# of holes meters # of holes meters
----------------------------------------------------------------------------
CFU 0 0 9 582
----------------------------------------------------------------------------
Maga 9 1,171 92 5,507
----------------------------------------------------------------------------
P8P9 74 11,993 45 2,697
----------------------------------------------------------------------------
P17 0 0 0 0
----------------------------------------------------------------------------
P16 0 0 0 0
----------------------------------------------------------------------------
Siga S 0 0 0 0
----------------------------------------------------------------------------
Siga W 0 0 0 0
----------------------------------------------------------------------------
Siga E 0 0 0 0
----------------------------------------------------------------------------
P11 0 0 0 0
----------------------------------------------------------------------------
TOTAL 83 13,019 146 8,786
----------------------------------------------------------------------------
Table 3. Highlights of Diamond Drill Hole Results for this
Release
(Includes holes previously reported for which the final total
assay results are now available)
----------------------------------------------------------------------------
Uncut Cut
From To Length Grade(2) Grade(3) Total
Zone Section Hole # (m) (m) (m) (g/t) (g/t) Assay(4)
----------------------------------------------------------------------------
P8P9 2000 BBD0588 85.00 92.00 7.00 1.46 1.46
----------------------------------------------------------------------------
P8P9 1950 BBD0543 38.50 46.00 7.50 2.47 2.47
----------------------------------------------------------------------------
P8P9 1950 BBD0543 72.00 85.00 13.00 5.12 1.12
----------------------------------------------------------------------------
P8P9 1950 BBD0543 104.00 143.00 39.00 1.12 1.12
----------------------------------------------------------------------------
P8P9 1950 BBD0544 78.00 82.00 4.00 5.21 2.53 Pending
----------------------------------------------------------------------------
P8P9 1950 BBD0544 159.00 166.00 7.00 1.61 1.61 Pending
----------------------------------------------------------------------------
P8P9 1950 BBD0544 187.00 214.00 27.00 0.98 0.98 Pending
----------------------------------------------------------------------------
P8P9 1950 BBD0545 121.00 129.00 8.00 4.30 1.95 Pending
----------------------------------------------------------------------------
P8P9 1900 BBD0609 118.00 123.00 5.00 2.73 2.22
----------------------------------------------------------------------------
P8P9 1900 BBD0611 129.00 165.00 36.00 1.21 1.21
----------------------------------------------------------------------------
P8P9 1900 BBD0612 78.00 99.00 21.00 1.66 1.50 Pending
----------------------------------------------------------------------------
P8P9 1900 BBD0615 127.00 136.00 9.00 1.87 1.87 Pending
----------------------------------------------------------------------------
P8P9 1850 BBD0500 53.00 65.00 12.00 1.09 1.02
----------------------------------------------------------------------------
P8P9 1850 BBD0701 149.00 164.00 15.00 1.30 1.30
----------------------------------------------------------------------------
P8P9 1800 BBD0537 100.00 108.00 8.00 1.27 1.27
----------------------------------------------------------------------------
P8P9 1800 BBD0537 113.00 123.00 10.00 1.42 1.42
----------------------------------------------------------------------------
P8P9 1800 BBD0538 35.50 48.50 13.00 1.42 1.42
----------------------------------------------------------------------------
P8P9 1800 BBD0538 141.00 159.00 18.00 0.88 0.88
----------------------------------------------------------------------------
P8P9 1800 BBD0539 0.00 6.00 6.00 3.23 3.02
----------------------------------------------------------------------------
P8P9 1750 BBD0582 85.00 101.00 16.00 0.79 0.79
----------------------------------------------------------------------------
P8P9 1750 BBD0656 72.00 94.00 22.00 1.23 1.23
----------------------------------------------------------------------------
P8P9 1750 BBD0656 97.00 103.00 6.00 2.12 2.12
----------------------------------------------------------------------------
P8P9 1750 BBD0657 37.00 56.00 19.00 2.55 2.09
----------------------------------------------------------------------------
P8P9 1750 BBD0658 129.00 145.00 16.00 1.04 0.97
----------------------------------------------------------------------------
P8P9 1700 BBD0581 50.00 67.00 17.00 1.91 1.83
----------------------------------------------------------------------------
P8P9 1700 BBD0584 101.00 115.00 14.00 2.03 1.94
----------------------------------------------------------------------------
P8P9 1700 BBD0584 134.00 143.00 9.00 1.84 1.29
----------------------------------------------------------------------------
P8P9 1700 BBD0584 161.00 175.00 14.00 1.05 0.87
----------------------------------------------------------------------------
P8P9 1700 BBD0585 147.00 160.00 13.00 1.14 1.14
----------------------------------------------------------------------------
P8P9 1700 BBD0607 118.00 132.00 14.00 0.82 0.82 Pending
----------------------------------------------------------------------------
P8P9 1650 BBD0530 26.00 34.00 8.00 1.54 1.54
----------------------------------------------------------------------------
P8P9 1650 BBD0533 3.00 16.00 13.00 1.26 1.06
----------------------------------------------------------------------------
P8P9 1650 BBD0533 55.00 70.00 15.00 0.75 0.75
----------------------------------------------------------------------------
P8P9 1650 BBD0533 92.00 98.00 6.00 1.69 1.69
----------------------------------------------------------------------------
P8P9 1650 BBD0534 85.50 91.50 6.00 3.09 3.09
----------------------------------------------------------------------------
P8P9 1650 BBD0534 211.00 220.00 9.00 1.40 1.40
----------------------------------------------------------------------------
P8P9 1600 BBD0498 28.50 31.50 3.00 4.17 4.17
----------------------------------------------------------------------------
P8P9 1600 BBD0605 74.00 104.00 30.00 0.85 0.85 Pending
----------------------------------------------------------------------------
P8P9 1600 BBD0606 89.00 114.00 25.00 0.99 0.98 Pending
----------------------------------------------------------------------------
P8P9 1600 BBD0606 138.00 157.00 19.00 0.90 0.90 Pending
----------------------------------------------------------------------------
P8P9 1600 BBD0606 161.00 177.00 16.00 0.78 0.78 Pending
----------------------------------------------------------------------------
P8P9 1550 BBD0494 111.00 117.00 6.00 2.11 2.11 Pending
----------------------------------------------------------------------------
P8P9 1550 BBD0495 100.00 111.00 11.00 1.05 1.05
----------------------------------------------------------------------------
P8P9 1500 BBD0574 47.00 63.00 16.00 2.02 1.53
----------------------------------------------------------------------------
P8P9 1500 BBD0575 76.00 89.00 13.00 0.93 0.93
----------------------------------------------------------------------------
P8P9 1500 BBD0577 79.00 100.00 21.00 0.95 0.95
----------------------------------------------------------------------------
P8P9 1450 BBD0489 50.00 64.00 14.00 1.09 0.99
----------------------------------------------------------------------------
P8P9 1450 BBD0490 16.50 22.50 6.00 2.50 2.37
----------------------------------------------------------------------------
P8P9 1450 BBD0491 116.00 138.00 22.00 8.16 0.93 Pending
----------------------------------------------------------------------------
P8P9 1400 BBD0400 64.50 77.50 13.00 1.22 1.22
----------------------------------------------------------------------------
P8P9 1400 BBD0651 75.00 88.50 13.50 1.24 1.24
----------------------------------------------------------------------------
P8P9 1400 BBD0652 100.50 117.00 16.50 1.51 1.51
----------------------------------------------------------------------------
P8P9 1400 BBD0652 196.00 205.00 9.00 1.31 1.31
----------------------------------------------------------------------------
P8P9 1350 BBD0522 170.00 177.00 7.00 1.64 1.50
----------------------------------------------------------------------------
P8P9 1350 BBD0522 207.00 229.00 22.00 1.28 1.28
----------------------------------------------------------------------------
P8P9 1350 BBD0522 232.00 252.00 20.00 2.93 2.53
----------------------------------------------------------------------------
P8P9 1350 BBD0522 295.00 306.00 11.00 0.94 0.94
----------------------------------------------------------------------------
P8P9 1350 BBD0525 218.00 231.00 13.00 2.48 2.30
----------------------------------------------------------------------------
P8P9 1350 BBD0526 59.50 71.00 11.50 1.31 1.31
----------------------------------------------------------------------------
P8P9 1350 BBD0528 153.00 160.00 7.00 23.63 2.85
----------------------------------------------------------------------------
P8P9 1300 BBD0569 7.50 25.00 17.50 1.48 1.48
----------------------------------------------------------------------------
P8P9 1300 BBD0570 77.00 86.00 9.00 7.21 1.15
----------------------------------------------------------------------------
P8P9 1300 BBD0571 143.00 151.00 8.00 2.01 2.01
----------------------------------------------------------------------------
P8P9 1250 BBD0483 167.00 173.00 6.00 2.25 2.25
----------------------------------------------------------------------------
P8P9 1250 BBD0483 176.00 202.00 26.00 2.18 1.48
----------------------------------------------------------------------------
P8P9 1250 BBD0483 219.00 248.00 29.00 1.05 1.05
----------------------------------------------------------------------------
P8P9 1250 BBD0483 260.00 293.00 33.00 0.75 0.75
----------------------------------------------------------------------------
P8P9 1200 BBD0563 115.00 129.00 14.00 1.16 1.16
----------------------------------------------------------------------------
P8P9 1150 BBD0393 12.50 30.50 18.00 1.02 1.02
----------------------------------------------------------------------------
Siga
E 12600 BBD0267 83.00 93.50 10.50 1.36 1.36
----------------------------------------------------------------------------
Siga
E 12600 BBD0267 99.50 105.50 6.00 2.70 1.92
----------------------------------------------------------------------------
Siga
E 12550 BBD0409 50.00 63.00 13.00 1.17 0.94
----------------------------------------------------------------------------
Siga
E 12500 BBD0405 117.50 125.00 7.50 2.61 1.41
----------------------------------------------------------------------------
Siga
E 12500 BBD0405 185.00 200.00 15.00 0.81 0.81
----------------------------------------------------------------------------
Siga
E 12200 BBD0449 79.00 88.00 9.00 1.41 1.41
----------------------------------------------------------------------------
Siga
E 12050 BBD0602 0.00 7.00 7.00 2.35 2.35
----------------------------------------------------------------------------
Siga
S 11050 BBD0227 117.50 126.50 9.00 1.15 1.15
----------------------------------------------------------------------------
Siga
S 10900 BBD0221 119.00 123.50 4.50 2.56 2.25
----------------------------------------------------------------------------
Siga
S 10500 BBD0170 85.00 109.50 24.50 0.83 0.83
----------------------------------------------------------------------------
Siga
S 10500 BBD0170 117.00 129.00 12.00 2.69 2.06
----------------------------------------------------------------------------
SIGA
W 11800 BBD0311 129.00 143.50 14.50 0.79 0.79
----------------------------------------------------------------------------
SIGA
W 11650 BBD0305 36.00 50.00 14.00 0.86 0.86
----------------------------------------------------------------------------
P16 44200 BBD0448 22.50 39.00 16.50 9.13 3.78
----------------------------------------------------------------------------
P16 44200 BBD0448 53.00 58.00 5.00 16.50 4.17
----------------------------------------------------------------------------
P16 44200 BBD0448 80.00 85.00 5.00 5.01 2.26
----------------------------------------------------------------------------
P16 44200 BBD0448 102.50 118.00 15.50 2.21 1.72
----------------------------------------------------------------------------
(2) Weighted average grade of uncut individual assays
(3) Weighted average grade of individual assays cut to 5 g/t
(4) Composite width and grade are preliminary where leach residue fire
assay results are pending
Table 4. Highlights of Reverse Circulation Results for this
Release
(Includes holes previously reported for which the final total
assay results are now available)
----------------------------------------------------------------------------
Uncut Cut
From To Length Grade(5) Grade(6) Total
Zone Section Hole (m) (m) (m) (g/t) (g/t) Assay(7)
----------------------------------------------------------------------------
Maga 3800 BBC2753 20.00 28.00 8.00 2.15 2.06
----------------------------------------------------------------------------
Maga 3400 BBC2976 17.00 28.00 11.00 1.11 1.11 Pending
----------------------------------------------------------------------------
Maga 3350 BBC2886 23.00 30.00 7.00 6.24 1.56 Pending
----------------------------------------------------------------------------
Maga 3100 BBC2947 13.00 36.00 23.00 0.59 0.59 Pending
----------------------------------------------------------------------------
Maga 3100 BBC2948 0.00 19.00 19.00 0.75 0.75 Pending
----------------------------------------------------------------------------
Maga 2950 BBC2839 22.00 38.00 16.00 0.68 0.68 Pending
----------------------------------------------------------------------------
Maga 2950 BBC2844 41.00 56.00 15.00 0.71 0.71 Pending
----------------------------------------------------------------------------
Maga 2950 BBC2845 38.00 51.00 13.00 3.57 0.90 Pending
----------------------------------------------------------------------------
Maga 2750 BBC2929 41.00 46.00 5.00 3.14 2.22 Pending
----------------------------------------------------------------------------
P8P9 2300 BBC2901 10.00 16.00 6.00 1.86 1.86
----------------------------------------------------------------------------
P8P9 2300 BBC2904 17.00 28.00 11.00 1.01 1.01
----------------------------------------------------------------------------
P8P9 2100 BBC2690 23.00 36.00 13.00 0.95 0.88
----------------------------------------------------------------------------
P8P9 2050 BBC2684 21.00 27.00 6.00 2.10 2.10
----------------------------------------------------------------------------
P8P9 2000 BBC2656 35.00 50.00 15.00 1.27 1.14
----------------------------------------------------------------------------
P8P9 1950 BBC2653 16.00 24.00 8.00 1.48 1.48
----------------------------------------------------------------------------
P8P9 1950 BBC2654 26.00 35.00 9.00 1.58 1.58
----------------------------------------------------------------------------
P8P9 1850 BBC2673 30.00 34.00 4.00 2.87 2.87
----------------------------------------------------------------------------
P8P9 1850 BBC2674 31.00 42.00 11.00 1.46 1.46
----------------------------------------------------------------------------
P8P9 1800 BBC2668 59.00 68.00 9.00 1.46 1.41
----------------------------------------------------------------------------
P8P9 1750 BBC2667 48.00 62.00 14.00 1.41 1.34
----------------------------------------------------------------------------
P8P9 1750 BBC2713 22.00 34.00 12.00 4.53 2.82
----------------------------------------------------------------------------
P8P9 1750 BBC2729 46.00 59.00 13.00 1.19 1.19
----------------------------------------------------------------------------
P8P9 1500 BBC2727 44.00 54.00 10.00 2.13 1.73
----------------------------------------------------------------------------
P8P9 1150 BBC2724 36.00 43.00 7.00 2.23 1.75
----------------------------------------------------------------------------
P8P9 1150 BBC2724 51.00 69.00 18.00 1.77 1.73
----------------------------------------------------------------------------
P8P9 1150 BBC2725 11.00 23.00 12.00 1.31 1.17
----------------------------------------------------------------------------
P8P9 1000 BBC2718 40.00 52.00 12.00 1.02 1.02
----------------------------------------------------------------------------
(5) Weighted average grade of uncut individual assays
(6) Weighted average grade of individual assays cut to 5 g/t
(7) Composite width and grade are preliminary where leach residue fire
assay results are pending
The mineralized intervals are based on a lower cut-off grade of
0.5 g/t, a minimal width of 3 m and up to a maximum of two
consecutive meters of dilution being included. The true width of
the mineralization is approximately 85% of the drill length
intervals in Maga, P16, P17 and P8P9 areas, and to 95% of the drill
length intervals in the Siga area. The half-core samples were
collected by Orezone employees using a diamond saw. The core
samples from the weathered (oxide) zone were prepared by Abilab
Burkina s.a.r.l. (a subsidiary of ALS-Chemex), BIGS Global Burkina
s.a.r.l and SGS Burkina Faso s.a.r.l., and then split by Orezone to
1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was
analyzed for leachable gold at BIGS Global Burkina s.a.r.l in
Ouagadougou, by bottle-roll cyanidation using a LeachWell(TM)
catalyst. The samples from the fresh or sulphide zone were prepared
by BIGS Global Burkina s.a.r.l, SGS Burkina Faso s.a.r.l. and
Abilab Burkina s.a.r.l. in Ouagadougou and then split by Orezone to
1 kg using Rotary Sample Dividers (RSDs). A 1 kg aliquot was
analyzed for leachable gold at BIGS Global Burkina s.a.r.l in
Ouagadougou, by bottle-roll cyanidation using a LeachWell(TM)
catalyst.
The RC drilling samples were divided by Orezone employees using
Rotary Sample Dividers (RSDs). A 2 kg split was prepared by Abilab
Burkina s.a.r.l. (a subsidiary of ALS-Chemex), BIGS Global Burkina
s.a.r.l and SGS Burkina Faso s.a.r.l., and then split by Orezone to
1 kg using RSDs. A 1 kg aliquot was analyzed for leachable gold at
BIGS Global Burkina s.a.r.l in Ouagadougou, by bottle-roll
cyanidation using a LeachWell(TM) catalyst. The leach residues from
all samples with a leach grade in excess of 0.2 g/t were prepared
by BIGS Global Burkina s.a.r.l. and then split by Orezone to 50 g
using Rotary Sample Dividers (RSDs). A 50 g aliquot was analyzed by
fire assay at Abilab Burkina s.a.r.l. (a subsidiary of ALS-Chemex)
or a 30 g aliquot at SGS Burkina Faso s.a.r.l.
Orezone employs a rigorous Quality Control Program (QCP)
including a minimum of 10% standards, blanks and duplicates. This
program was executed under the supervision of Pascal Marquis, SVP
Exploration for Orezone, who is a Qualified Person under National
Instrument 43-101 and approved the technical information in this
release. A complete table of results and the NI 43-101 Bombore
Resource Report that describes the Bombore resource model can be
found at www.orezone.com.
About Orezone Gold Corporation
Orezone is a Canadian company with a gold discovery track record
of +10 M oz and recent mine development experience in Burkina Faso,
West Africa. Bombore, the Company's 100% owned flagship project, is
one of the largest gold deposits in the country and is situated 85
km east of the capital city, adjacent to an international highway.
The 2010 Resource is constrained within optimized open pit shells
that span 11 km, and include 1.6 Moz indicated and 1.9 Moz inferred
resources with an average drill depth of only 60 meters. The
Company has completed a 215,000 m drill program to extend the
average depth of drilling to 120 meters. The program results are
expected to significantly expand resources and support the
completion of a Definitive Feasibility Study in 2012. Orezone's
goal is to develop Bombore into a world-class deposit and become a
mid-tier producer by 2015.
FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION: This
news release contains certain "forward-looking statements" within
the meaning of applicable Canadian securities laws. Forward-looking
statements and forward-looking information are frequently
characterized by words such as "plan," "expect," "project,"
"intend," "believe," "anticipate", "estimate" and other similar
words, or statements that certain events or conditions "may" or
"will" occur. Forward-looking statements in this release include
statements regarding, among others, ; capital and operating cost
estimates; gold production for the project; completion of a
Definitive Feasibility Study in 2012; completion of a resource
update in Q2 2012; commencement of production at the Bombore
Project.
FORWARD-LOOKING STATEMENTS are based on certain assumptions, the
opinions and estimates of management at the date the statements are
made, and are subject to a variety of risks and uncertainties and
other factors that could cause actual events or results to differ
materially from those projected in the forward-looking statements.
These factors include the inherent risks involved in the
exploration and development of mineral properties, the
uncertainties involved in interpreting drilling results and other
geological data, fluctuating metal prices, the possibility of
project cost overruns or unanticipated costs and expenses, the
ability of contracted parties (including laboratories and drill
companies to provide services as contracted); uncertainties
relating to the availability and costs of financing needed in the
future and other factors. The Company undertakes no obligation to
update forward-looking statements if circumstances or management's
estimates or opinions should change. The reader is cautioned not to
place undue reliance on forward-looking statements. Comparisons
between any resource model or estimates with the subsequent drill
results are preliminary in nature and should not be relied upon as
potential qualified changes to any future resource updates or
estimates.
Readers are advised that National Instrument 43-101 of the
Canadian Securities Administrators requires that each category of
mineral reserves and mineral resources be reported separately.
Readers should refer to the annual information form of Orezone for
the year ended December 31, 2011 and other continuous disclosure
documents filed by Orezone since January 1, 2012 available at
www.sedar.com, for this detailed information, which is subject to
the qualifications and notes set forth therein.
Contacts: Orezone Gold Corporation Ron Little CEO (613) 241-3699
Toll Free: (888) 673-0663rlittle@orezone.com Orezone Gold
Corporation Pascal Marquis SVP Exploration (613) 241-3699 Toll
Free: (888) 673-0663pmarquis@orezone.com
Orezone Gold (TSX:ORE)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Orezone Gold (TSX:ORE)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025