Ascot Resources Ltd. (
TSX: AOT; OTCQX:
AOTVF) (“
Ascot” or the
“
Company”) is pleased to announce the fourth and
final batch of assay results from the 2023 exploration drill
program at the Company’s Premier Gold Project
(“
PGP” or the “
project”), located
on Nisga’a Nation Treaty Lands in the prolific Golden Triangle of
northwestern British Columbia. This release summarizes the final
batch of assay results from this season’s surface drilling program
for in-fill and exploration purposes at the Big Missouri deposit,
approximately six kilometres north of the Premier mill. Underground
mine development towards various stoping areas is progressing at
Big Missouri, and the stopes targeted in drilling from this release
are in the near-term mine plan.
Highlights from the drill results
include:
- 58.18
g/t Au over 1.99m from a depth of 70.8m in hole P23-2532,
including 77.45 g/t Au over
0.99m.
- 9.89
g/t Au over 6.94m from a depth of 22.7m in hole P23-2509B,
including 51.00 g/t Au over
1.19m
- 8.26
g/t Au over 7.35m from a depth of 7.35m in hole P23-2506,
including 30.88 g/t Au over
1.44m
- 8.26
g/t Au over 5.57m from a depth of 16.9m in hole P23-2499,
including 15.75 g/t Au over
1.27m
Note: True widths are estimated to be between 70% to 90% of
reported interval widths.
Derek White, President and CEO of Ascot
commented, “Our 2023 surface drilling program finished on a high
note, with many planned stope shapes at Big Missouri being
confirmed and, in some cases, expanded. We look forward to
exploiting this material in the coming months and processing it at
the Premier mill, where we anticipate starting pre-commissioning
shortly. Similar confirmatory and expansion results were achieved
in 2023 at the Prew Zone of the Premier Deposit, where underground
access development is also being progressed. Overall, the 2023
drill program enhances our confidence in the geological model,
which is all the more important as we become Canada’s next gold
producer.”
Drilling for the 2023 exploration season at the
Big Missouri deposit was conducted from early August until the end
of October, during which time 72 holes were drilled from surface
for a total of 6,539 metres. This second and final batch of assay
results are from 55 holes totaling 5,293 metres, drilled from six
pads, and including three holes drilled at the Day Zone on the
western side of the Big Missouri Ridge. The drill holes targeted
stope shapes for additional pierce points, gaps between stopes due
to previous drill patterns, and extensions along strike and up dip.
An overview of drill hole locations is shown in Figure 1, a summary
of assay results is shown in Table 1, and drill pad coordinates are
provided in Table 2.
Cross sections of the drill holes reported in
this release are shown in Figures 2 to 4. Figure 2 shows a
relatively large stope shape which has now been much better defined
with additional drill holes, including hole P23-2532 which
intercepted 58.18 g/t Au over 1.99m from a depth of 70.8m.
Three holes (P23-2515 to 2517) were drilled at
the Day Zone on the western side of the Big Missouri ridge, where
the Company had previously drilled gold mineralization over a
strike length of 550 metres and demonstrated potential expansion by
a further 800 metres through IP geophysics in 2023. While anomalous
gold grades as high as 7.7 g/t were encountered at the predicted
intervals, more follow-up drilling will be required in the area in
subsequent drill seasons to test the 1,000-metre unexplored gap
between Day Zone and Martha Ellen deposit to the northwest.
Table 1 – Big
Missouri drill results
Hole # |
Azimuth/dip |
From(m) |
To(m) |
Width(m) |
Au(g/t) |
Ag(g/t) |
P23-2498 |
-59/70 |
8.30 |
11.40 |
3.10 |
3.78 |
35.51 |
incl. |
|
9.40 |
10.40 |
1.00 |
5.18 |
68.40 |
and |
|
19.45 |
23.20 |
3.75 |
7.43 |
25.97 |
incl. |
|
21.10 |
22.15 |
1.05 |
21.20 |
54.30 |
and |
|
100.30 |
108.10 |
7.80 |
3.15 |
6.34 |
and |
|
127.05 |
129.03 |
1.98 |
2.88 |
5.40 |
P23-2499 |
-64/70 |
7.54 |
22.47 |
14.93 |
4.56 |
14.36 |
incl. |
|
16.90 |
22.47 |
5.57 |
8.26 |
24.66 |
incl. |
|
21.20 |
22.47 |
1.27 |
15.75 |
62.70 |
and |
|
36.00 |
38.02 |
2.02 |
5.78 |
3.40 |
and |
|
57.68 |
59.44 |
1.76 |
3.26 |
6.50 |
and |
|
65.79 |
80.27 |
14.48 |
2.20 |
6.01 |
incl. |
|
69.79 |
71.79 |
2.00 |
3.24 |
6.10 |
and |
|
97.40 |
98.64 |
1.24 |
3.46 |
10.60 |
P23-2500 |
-61/78 |
8.10 |
21.69 |
13.59 |
2.61 |
14.86 |
incl. |
|
19.62 |
21.69 |
2.07 |
5.74 |
31.30 |
and |
|
39.82 |
48.00 |
8.18 |
1.25 |
5.66 |
and |
|
102.11 |
110.70 |
8.59 |
2.50 |
15.21 |
and |
|
122.70 |
126.69 |
3.99 |
2.94 |
4.86 |
incl. |
|
122.70 |
123.83 |
1.13 |
5.04 |
8.80 |
P23-2501 |
-65/79 |
7.40 |
11.50 |
4.10 |
2.60 |
11.68 |
and |
|
18.50 |
21.55 |
3.05 |
5.68 |
18.96 |
and |
|
34.30 |
36.00 |
1.70 |
6.89 |
5.80 |
and |
|
55.50 |
60.00 |
4.50 |
2.74 |
6.23 |
and |
|
74.05 |
82.87 |
8.82 |
4.24 |
17.29 |
and |
|
98.30 |
101.00 |
2.70 |
3.35 |
14.63 |
P23-2502 |
-50/82 |
8.71 |
11.90 |
3.19 |
3.67 |
11.20 |
and |
|
18.85 |
22.97 |
4.12 |
4.05 |
15.85 |
incl. |
|
20.69 |
21.81 |
1.12 |
8.27 |
17.20 |
and |
|
113.25 |
117.35 |
4.10 |
1.93 |
8.10 |
P23-2503 |
-49/92 |
18.85 |
23.00 |
4.15 |
6.59 |
10.66 |
incl. |
|
18.85 |
20.35 |
1.50 |
12.35 |
14.90 |
and |
|
43.55 |
46.50 |
2.95 |
2.69 |
5.98 |
P23-2504 |
-60/100 |
12.34 |
18.84 |
6.50 |
4.22 |
7.06 |
incl. |
|
17.20 |
18.84 |
1.64 |
6.96 |
10.10 |
and |
|
53.34 |
61.62 |
8.28 |
1.32 |
19.78 |
and |
|
97.48 |
101.24 |
3.76 |
1.57 |
68.56 |
and |
|
121.15 |
124.18 |
3.03 |
2.95 |
26.41 |
P23-2505 |
-67/99 |
16.20 |
21.94 |
5.74 |
1.60 |
11.23 |
and |
|
44.20 |
45.68 |
1.48 |
11.20 |
12.80 |
and |
|
70.20 |
71.95 |
1.75 |
10.80 |
10.60 |
and |
|
79.11 |
81.77 |
2.66 |
3.86 |
5.83 |
P23-2506 |
-52/100 |
13.90 |
21.25 |
7.35 |
8.26 |
12.84 |
incl. |
|
19.81 |
21.25 |
1.44 |
30.88 |
38.45 |
and |
|
26.40 |
27.40 |
1.00 |
8.67 |
8.30 |
and |
|
42.20 |
44.20 |
2.00 |
2.30 |
6.20 |
and |
|
111.65 |
112.56 |
0.91 |
1.88 |
18.20 |
P23-2507 |
-59/108 |
9.12 |
18.68 |
9.56 |
1.99 |
6.35 |
and |
|
26.24 |
29.52 |
3.28 |
1.25 |
10.73 |
and |
|
58.00 |
61.00 |
3.00 |
1.77 |
3.37 |
P23-2508 |
-57/115 |
13.10 |
20.20 |
7.10 |
1.46 |
7.02 |
and |
|
125.77 |
130.37 |
4.60 |
2.78 |
27.37 |
incl. |
|
127.26 |
128.37 |
1.11 |
5.11 |
71.70 |
P23-2509 |
-42/213 |
35.18 |
37.29 |
2.11 |
3.87 |
6.80 |
P23-2509B |
-43/204 |
22.65 |
29.59 |
6.94 |
9.89 |
6.37 |
incl. |
|
22.65 |
23.84 |
1.19 |
51.00 |
16.00 |
P23-2510 |
-44/227 |
30.96 |
32.31 |
1.35 |
1.12 |
8.20 |
P23-2511 |
-44/257 |
31.40 |
39.36 |
7.96 |
3.84 |
9.05 |
incl. |
|
31.40 |
33.77 |
2.37 |
7.36 |
15.47 |
P23-2512 |
-44/290 |
31.44 |
37.00 |
5.56 |
9.30 |
38.96 |
incl. |
|
34.40 |
35.53 |
1.13 |
18.25 |
39.30 |
P23-2513 |
-43/307 |
30.40 |
33.75 |
3.35 |
1.69 |
5.07 |
and |
|
36.75 |
39.75 |
3.00 |
1.67 |
7.60 |
P23-2514 |
-42/325 |
34.35 |
36.00 |
1.65 |
2.47 |
8.20 |
P23-2515 |
-86/68 |
5.00 |
6.75 |
1.75 |
1.22 |
4.50 |
P23-2516 |
-43/72 |
55.17 |
65.53 |
10.36 |
2.02 |
4.30 |
incl. |
|
64.38 |
65.53 |
1.15 |
7.72 |
20.40 |
P23-2517 |
-59/72 |
42.40 |
44.40 |
2.00 |
1.55 |
0.90 |
and |
|
50.40 |
52.16 |
1.76 |
1.14 |
1.90 |
P23-2518 |
-51/70 |
91.90 |
93.20 |
1.30 |
0.84 |
7.80 |
P23-2519 |
-50/109 |
90.52 |
97.50 |
6.98 |
1.83 |
3.75 |
incl. |
|
96.00 |
97.50 |
1.50 |
4.11 |
4.90 |
P23-2520 |
-45/88 |
95.10 |
98.30 |
3.20 |
2.81 |
8.47 |
incl. |
|
95.10 |
96.10 |
1.00 |
5.07 |
10.70 |
P23-2521 |
-46/102 |
86.71 |
87.88 |
1.17 |
2.13 |
3.90 |
P23-2522 |
-45/118 |
91.94 |
96.00 |
4.06 |
11.05 |
28.71 |
P23-2523 |
-46/138 |
87.17 |
92.10 |
4.93 |
2.80 |
10.31 |
and |
|
114.84 |
124.60 |
9.76 |
5.77 |
4.38 |
incl. |
|
114.84 |
116.00 |
1.16 |
32.90 |
9.70 |
P23-2524 |
-75/304 |
87.48 |
89.50 |
2.02 |
0.79 |
2.90 |
P23-2525 |
-58/341 |
82.20 |
91.08 |
8.88 |
4.99 |
4.43 |
P23-2526 |
-84/360 |
75.08 |
80.20 |
5.12 |
7.55 |
10.64 |
incl. |
|
79.08 |
80.20 |
1.12 |
23.60 |
17.70 |
P23-2527 |
-70/357 |
77.71 |
83.40 |
5.69 |
2.46 |
4.06 |
P23-2528 |
-54/353 |
93.27 |
99.36 |
6.09 |
3.84 |
4.74 |
P23-2529 |
-63/28 |
82.94 |
88.24 |
5.30 |
2.92 |
4.50 |
P23-2530 |
-68/79 |
82.87 |
85.23 |
2.36 |
2.89 |
8.21 |
P23-2531 |
-71/142 |
73.76 |
79.76 |
6.00 |
3.79 |
3.43 |
and |
|
87.24 |
87.80 |
0.56 |
2.85 |
7.50 |
P23-2532 |
-71/169 |
70.81 |
72.80 |
1.99 |
58.18 |
33.86 |
incl. |
|
70.81 |
71.80 |
0.99 |
77.45 |
46.45 |
P23-2533 |
-58/173 |
81.08 |
83.86 |
2.78 |
1.61 |
6.30 |
P23-2534 |
-65/189 |
89.66 |
91.89 |
2.23 |
3.27 |
32.32 |
P23-2535 |
-55/189 |
87.79 |
89.21 |
1.42 |
1.65 |
2.00 |
P23-2536 |
-80/206 |
74.95 |
76.21 |
1.26 |
4.83 |
13.80 |
and |
|
81.38 |
82.76 |
1.38 |
3.90 |
7.50 |
P23-2537 |
-71/199 |
88.89 |
90.70 |
1.81 |
5.27 |
18.40 |
P23-2538 |
-41/130 |
43.95 |
49.00 |
5.05 |
2.75 |
14.63 |
P23-2539 |
-50/151 |
42.00 |
49.00 |
7.00 |
2.88 |
4.60 |
incl. |
|
44.00 |
45.27 |
1.27 |
5.57 |
7.20 |
P23-2540 |
-40/159 |
49.08 |
54.00 |
4.92 |
3.96 |
6.51 |
incl. |
|
52.00 |
53.00 |
1.00 |
14.70 |
14.80 |
P23-2541 |
-41/162 |
49.00 |
51.00 |
2.00 |
4.87 |
6.15 |
P23-2542 |
-50/177 |
40.00 |
45.00 |
5.00 |
4.35 |
6.10 |
incl. |
|
41.00 |
42.00 |
1.00 |
9.65 |
4.60 |
P23-2543 |
-53/195 |
30.52 |
32.31 |
1.79 |
1.75 |
2.10 |
and |
|
36.88 |
39.07 |
2.19 |
2.45 |
4.76 |
P23-2544 |
-60/204 |
30.60 |
33.60 |
3.00 |
2.63 |
3.50 |
P23-2545 |
-55/215 |
31.70 |
34.70 |
3.00 |
4.98 |
6.53 |
P23-2546 |
-48/332 |
99.00 |
103.29 |
4.29 |
4.85 |
24.29 |
P23-2547 |
-63/333 |
67.64 |
70.57 |
2.93 |
6.49 |
9.92 |
and |
|
77.00 |
80.67 |
3.67 |
2.92 |
7.50 |
P23-2548 |
-74/334 |
60.00 |
61.75 |
1.75 |
3.23 |
14.60 |
and |
|
83.00 |
87.00 |
4.00 |
3.65 |
6.13 |
P23-2549 |
-64/349 |
65.00 |
67.50 |
2.50 |
3.08 |
5.06 |
and |
|
70.50 |
72.50 |
2.00 |
2.72 |
7.05 |
P23-2550 |
-62/11 |
66.50 |
68.50 |
2.00 |
2.78 |
48.95 |
P23-2551 |
-76/24 |
70.00 |
73.50 |
3.50 |
2.76 |
5.14 |
incl. |
|
70.00 |
71.00 |
1.00 |
5.00 |
5.00 |
and |
|
80.14 |
83.00 |
2.86 |
2.00 |
5.88 |
Note: True widths are estimated to be between
70% to 90% of reported interval widths.
Figure 1 – 3D
view of the drill pad locations and drill hole traces reported in
this release
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/4013ecce-6468-4aef-be89-9e1a3137deb0
Figure 2 –
3D-cross section of drill holes from pad 23BM4. Gold mineralization
in the new drill holes shows that the final stope shape will
require only minor modifications.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/4d1d468d-89f7-4433-84cc-b204226149b1
Figure 3 –
3D-cross section of drill holes from pad 23BM5. High-grade gold was
intercepted in between two stope shapes in holes P23-2543 (1 metre
grading 10 g/t gold) and P23-2539, suggesting the potential for the
stope shapes to expand and be connected.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/7eb9ec8c-d76e-4f9b-82eb-0d43010024e6
Figure 4 –
3D-cross section of drill holes from pads 23BM3, 23BM2 and 23BM6.
High-grade gold was intercepted in many areas outside of current
stope shapes, such as near-surface to the east of pad 23BM2, or at
depth as drilled from pad 23BM6.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/a121dcfe-eb3f-4992-b9b0-22421281da87
Table 2 – Drill pad
locations
Pad # |
UTM N |
UTM E |
Elevation (masl) |
Hole no. |
23BM2 |
436671 |
6219676 |
998 |
P23-2498 to P23-2514 |
23Day1 |
435816 |
6219437 |
926 |
P23-2515 to P23-2517 |
23BM3 |
436577 |
6219681 |
1042 |
P23-2518 to P23-2523 |
23BM4 |
436525 |
6219752 |
1050 |
P23-2524 to P23-2537 |
23BM5 |
436647 |
6219528 |
971 |
P23-2538 to P23-2547 |
23BM6 |
436766 |
6219582 |
965 |
P23-2548 to P23-2551 |
Qualified Person
Lawrence Tsang, P.Geo., the Company’s
Exploration Manager provides the field management for the PGP
exploration program. John Kiernan, P.Eng., Chief Operating Officer
of the Company is the Company’s Qualified Person (QP) as defined by
National Instrument 43-101 and has reviewed and approved the
technical contents of this news release.
Quality Assurance/Quality
Control
Analytical work is being carried out by ALS
Canada Ltd. (“ALS”). Ascot’s quality-assurance and quality-control
program includes the use of analytical blanks to monitor for cross
contamination, certified reference material standards to assess
analytical accuracy, and duplicate samples to quantify sampling
precision. This is in addition to the internal quality assurance
program employed by ALS.
Samples are dried and weighed by ALS. They are
then crushed to 75% passing 2mm, with 250g split and pulverized to
85% passing 75µm. Samples are processed at the ALS preparation lab
in Terrace and sent to ALS in North Vancouver for analysis. There,
all samples are dissolved using four acid digestion with an ICP-AES
finish and fire assay with AA finish for gold. Samples over 100ppm
silver are digested with aqua regia and then volumetrically diluted
before an ICP-AES or AA finish (up to 1,500ppm). Samples over
1,500ppm silver are fire assayed with a gravimetric finish. Samples
over 10ppm gold are fire assayed with a gravimetric finish.
Identified or suspected metallic gold or silver are subjected to
“metallics” assays. Sampling and storage is located at the
Company’s secure facility in Stewart, British Columbia.
On behalf of the Board of Directors of
Ascot Resources Ltd.“Derek C. White”President &
CEO
For further information
contact:
David Stewart, P.Eng.VP, Corporate Development & Shareholder
Communicationsdstewart@ascotgold.com778-725-1060 ext. 1024
About Ascot Resources Ltd.
Ascot is a Canadian junior exploration and
development company focused on re-starting the past producing
Premier gold mine, located on Nisga’a Nation Treaty Lands, in
British Columbia’s prolific Golden Triangle. Ascot shares trade on
the TSX under the ticker AOT. Concurrent with progressing the
development of Premier, the Company continues to successfully
explore its properties for additional high-grade underground
resources. Ascot is committed to the safe and responsible
development of Premier in collaboration with Nisga’a Nation as
outlined in the Benefits Agreement.
For more information about the Company, please
refer to the Company’s profile on SEDAR+ at www.sedarplus.ca or
visit the Company’s web site at www.ascotgold.com, or for a virtual
tour visit www.vrify.com under Ascot Resources.
The TSX has not reviewed and does not accept
responsibility for the adequacy or accuracy of this release.
Cautionary Statement Regarding
Forward-Looking Information
All statements and other information contained
in this press release about anticipated future events may
constitute forward-looking information under Canadian securities
laws ("forward-looking statements"). Forward-looking statements are
often, but not always, identified by the use of words such as
"seek", "anticipate", "believe", "plan", "estimate", "expect",
"targeted", "outlook", "on track" and "intend" and statements that
an event or result "may", "will", "should", "could" or "might"
occur or be achieved and other similar expressions. All statements,
other than statements of historical fact, included herein are
forward-looking statements, including statements in respect of the
advancement and development of the PGP and the timing related
thereto, the exploration of the Company’s properties and
management’s outlook for the remainder of 2023 and beyond. These
statements involve known and unknown risks, uncertainties and other
factors that may cause actual results or events to differ
materially from those anticipated in such forward-looking
statements, including risks associated with the business of Ascot;
risks related to exploration and potential development of Ascot's
projects; business and economic conditions in the mining industry
generally; fluctuations in commodity prices and currency exchange
rates; uncertainties relating to interpretation of drill results
and the geology, continuity and grade of mineral deposits; the need
for cooperation of government agencies and indigenous groups in the
exploration and development of properties and the issuance of
required permits; the need to obtain additional financing to
develop properties and uncertainty as to the availability and terms
of future financing; the possibility of delay in exploration or
development programs and uncertainty of meeting anticipated program
milestones; uncertainty as to timely availability of permits and
other governmental approvals; risks associated with COVID-19
including adverse impacts on the world economy, construction timing
and the availability of personnel; and other risk factors as
detailed from time to time in Ascot's filings with Canadian
securities regulators, available on Ascot's profile on SEDAR+ at
www.sedar.ca including the Annual Information Form of the Company
dated March 23, 2023 in the section entitled "Risk Factors".
Forward-looking statements are based on assumptions made with
regard to: the estimated costs associated with construction of the
Project; the timing of the anticipated start of production at the
Project; the ability to maintain throughput and production levels
at the Premier Mill; the tax rate applicable to the Company; future
commodity prices; the grade of Resources and Reserves; the ability
of the Company to convert inferred resources to other categories;
the ability of the Company to reduce mining dilution; the ability
to reduce capital costs; and exploration plans. Forward-looking
statements are based on estimates and opinions of management at the
date the statements are made. Although Ascot believes that the
expectations reflected in such forward-looking statements and/or
information are reasonable, undue reliance should not be placed on
forward-looking statements since Ascot can give no assurance that
such expectations will prove to be correct. Ascot does not
undertake any obligation to update forward-looking statements. The
forward-looking information contained in this news release is
expressly qualified by this cautionary statement.
Ascot Resources (TSX:AOT)
Gráfico Histórico do Ativo
De Dez 2024 até Jan 2025
Ascot Resources (TSX:AOT)
Gráfico Histórico do Ativo
De Jan 2024 até Jan 2025