Cartier Cuts High-Grade Intersection of 35.3 g/t Au over 4.4 m North of the Portal Zone on East Cadillac
20 Novembro 2024 - 9:00AM
Cartier Resources Inc. (TSXV: ECR, FSE: 6CA)
("Cartier" or the "Company") reports high-grade gold results in the
Portal sector at its 100%-owned East Cadillac property. The latter
is located 45 km east of the Val-d’Or mining camp.
Highlights:
- The drill holes intersected:
- An intersection grading
241.0 g/t Au over 0.6 m included within
35.3 g/t Au over 4.4 m, 250 m north of the
Portal Gold Zone (FIGURE and table
1 below);
- Intersections grading 13.7
g/t Au over 0.5 m included within 4.7 g/t Au over
4.5 m and
5.9 g/t Au over
1.5 m, situated several meters from the Portal exploration
ramp (Table 2 below);
- The two drills, completing the 2024
exploration drilling program of 29,000 m (164 holes), have
discovered to date 5 new high-grade gold zones on the East Cadillac
property and exploration continues (FIGURE).
“ The results, obtained north of the Portal
Zone, suggest the presence of a second high-grade gold structure in
this area ” commented Philippe Cloutier, President and CEO.
Table 1: New
Results from the Intersection North of the Portal Gold
Zone
Hole |
CoordinatesUTM (m) |
Azimuth (°) /Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
CH24-197 |
330398/ 5320455/ 336 |
52/-56 |
166.3 |
166.9 |
241.0 |
0.6 |
Included within |
164.3 |
168.7 |
35.3 |
4.4 |
The lengths of the mineralized intersections are
expressed as measured lengths along the drill core.The estimated
true widths of the mineralized intersections are approximately 20%
of the reported lengths.
Table 2: New
Results from the Portal Gold Zone
Hole |
CoordinatesUTM (m) |
Azimuth (°) /Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
CH24-191 |
330299/ 5320411/ 337 |
182/-63 |
201.5 |
202.0 |
13.7 |
0.5 |
Included within |
198.5 |
203.0 |
4.7 |
4.5 |
CH24-190 |
202/-73 |
217.1 |
218.6 |
5.9 |
1.5 |
The lengths of the mineralized intersections are
expressed as measured lengths along the drill core.The estimated
true widths of the mineralized intersections are approximately 65%
to 75% of the reported lengths.
Table 3: Portal Gold
Zone Previous 2024 Results
Hole |
CoordinatesUTM (m) |
Azimuth (°) /Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
CH24-186 |
330304/ 5320309/ 337 |
161/-45 |
56.0 |
64.0 |
7.2 |
8.0 |
Including |
56.0 |
58.0 |
11.0 |
2.0 |
and |
62.0 |
64.0 |
12.5 |
2.0 |
and |
62.0 |
62.5 |
26.2 |
0.5 |
CH24-188 |
330299/ 5320411/ 337 |
181/-46 |
153.8 |
154.3 |
7.2 |
0.5 |
The lengths of the mineralized intersections are
expressed as measured lengths along the drill core.The estimated
true widths of the mineralized intersections are approximately 85%
to 95% of the reported lengths.
Table 4: Best
Historical Results from the Portal Gold Zone
Hole |
CoordinatesUTM (m) |
Azimuth (°) /Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
07-86-02 |
330267/ 5320398/ 336 |
180/-48 |
141.7 |
142.1 |
18.5 |
0.4 |
07-87-05 |
330326/ 5320268/ 337 |
180/-49 |
11.0 |
11.5 |
15.0 |
0.5 |
Included within |
11.0 |
14.4 |
5.0 |
3.4 |
07-86-04 |
330269/ 5320556/ 335 |
180/-47 |
282.7 |
285.9 |
2.9 |
3.2 |
The lengths of the mineralized intersections are
expressed as measured lengths along the drill core.The estimated
true widths of the mineralized intersections are approximately 85%
to 95% of the reported lengths.
Quality Assurance / Quality
Control
For each batch of samples sent to the
laboratory, Cartier inserts 5% of the number of samples in the form
of certified standards and another 5% in the form of blanks to
ensure quality control. The samples are analyzed at the Techni-Lab
(Actlabs) laboratory in Ste-Germaine-Boulé, Québec, Canada. Samples
weighing 3 to 5 kg are crushed by the laboratory to 90% passing 10
mesh (2.00 mm), then a 500 g fraction of each sample is
pulverized to 90% passing 200 mesh (0.07 mm). The resulting 50
g pulps are analyzed by fire assay with an atomic absorption
finish. Samples with results ≥ 1.0 g/t and < 10.0 g/t are
re-assayed by fire assay with an atomic absorption finish. Results
greater than or equal to 10.0 g/t Au are analyzed by fire assay
with a gravimetric finish. For samples containing visible gold, a
500 g subsample of rock is analyzed by the metallic sieve
method.
Qualified Persons
The Company’s scientific and technical
information in this news release was prepared and reviewed by
Mr. Gaétan Lavallière, P.Geo., Ph.D., Vice-President, and Mr.
Ronan Déroff, P.Geo., M.Sc., Senior Geologist, Project Manager and
Geomatician, both qualified persons as defined in National
Instrument 43 101. Mr. Lavallière approved the information
contained in this press release.
About Cartier Resources Inc.
Founded in 2006, Cartier Resources Inc. is an
exploration company based in Val-d’Or, Québec, Canada. The
Company’s projects are located in Québec, which consistently ranks
among the world’s best mining jurisdictions. Cartier is actively
advancing the development of its flagship East Cadillac Project and
is looking for business partners for its other projects. The
Company has significant corporate and institutional support,
including Agnico Eagle Mines, O3 Mining and provincial investment
funds.
For more information, contact:Philippe Cloutier, P.Geo.President
and CEOTelephone:
819-856-0512philippe.cloutier@ressourcescartier.comwww.ressourcescartier.com |
|
Neither the TSX Venture Exchange nor its
regulatory services provider accepts responsibility for the
adequacy or accuracy of this press release.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/cb4ecda8-bddb-4250-983e-ccb4b4937b62
Cartier Resources (TSXV:ECR)
Gráfico Histórico do Ativo
De Out 2024 até Nov 2024
Cartier Resources (TSXV:ECR)
Gráfico Histórico do Ativo
De Nov 2023 até Nov 2024