Forsys Metals Corp ("Forsys" or the "Company")
(TSX:FSY)(FRANKFURT:F2T)(NAMIBIAN:FSY) is pleased to announce
positive drilling results from an extension exploration program on
the Company's fully permitted Valencia Mining Licence 149 in
Namibia, Africa. The new discovery, "Valencia East" is located 500
metres northeast from the planned Valencia production pit (see
Figure 1). Since November 20, 2012 the Company has completed a
total of 15 percussion drill holes for a total of 2,250 metres.
The Company is also pleased to announce that as a result of the
continued exploration success at Valencia, comprising Valencia
Main, Valencia East and Valencia North and at Namibplaas (EPL
3638), combined with the high likelihood of common infrastructure
(a NI 43-101 technical reporting requirement); these projects will
now be consolidated and considered as a single project. The Company
has designated that the newly consolidated property be named,
Norasa Uranium Project. Norasa is an everyday term used by the rich
and diverse culture of the Damara people and means united or
putting things together.
Marcel Hilmer, Chief Executive Officer, commented, "The initial
drilling results at Valencia East have confirmed considerable
mineralization in 11 of the 15 percussion drill holes, encountering
significant intersections of greater than 200 ppm U3O8 including
many greater than 400 ppm as highlighted in Table 1 below. The
results from this drilling program are very encouraging and
indicate the potential for a significant high-grade area located in
close proximity to the main Valencia deposit and proposed
processing plant. We are very pleased that this program continues
to increase both the potential resources and the overall grade of
the consolidated Valencia and Namibplaas projects, now known as
Norasa. The consolidation of the projects confirms our strategy to
build a world class, large capacity process plant that can be
supplied with ore from both the Valencia and Namibplaas
deposits."
Table 1: Highlights of recent assay results from Valencia East Percussion
Drilling
(Minimum of 200 ppm U3O8 and an interval of 1.0 metre or greater)
----------------------------------------------------------------------------
Grade
Interval (ppm)
Hole From (m) To (m) (m) U3O8
----------------------------------------------------------------------------
VEPD-002 56.8 66.2 9.4 233
Including 64.2 66.0 1.8 527
75.5 83.6 8.1 307
Including 76.6 78.4 1.8 747
----------------------------------------------------------------------------
VEPD-004 36.7 41.1 4.4 254
Including 38.0 39.3 1.3 438
52.8 56.0 3.2 214
----------------------------------------------------------------------------
VEPD-005 51.9 55.9 4.0 244
Including 54.2 55.9 1.7 345
90.3 99.6 9.3 201
Including 95.6 97.4 1.8 308
165.8 166.8 1.0 393
170.2 174.8 4.6 432
Including 170.3 172.3 2.0 757
----------------------------------------------------------------------------
VEPD-006 69.2 72.3 3.1 806
Including 70.6 71.8 1.2 1400
----------------------------------------------------------------------------
VEPD-008 36.2 37.5 1.3 399
----------------------------------------------------------------------------
VEPD-010 25.4 29.7 4.3 228
38.2 39.2 1.0 273
43.8 44.8 1.0 248
----------------------------------------------------------------------------
VEPD-011 21.4 28.0 6.6 205
31.4 32.4 1.0 311
----------------------------------------------------------------------------
VEPD-012 4.7 7.6 2.9 205
40.1 41.4 1.3 290
73.0 90.0 17.0 404
Including 81.7 83.3 1.6 731
Including 85.4 89.0 3.6 701
96.8 100.6 3.8 689
Including 98.6 99.8 1.2 1295
----------------------------------------------------------------------------
VEPD-013 35.9 44.5 8.6 251
103.3 114.8 11.5 346
Including 113 114.4 1.4 1692
----------------------------------------------------------------------------
VEPD-014 121.5 146.9 25.4 228
Including 137.3 138.4 1.1 552
Including 140.6 142.5 1.9 317
----------------------------------------------------------------------------
VEPD-015 21.1 22.5 1.4 221
35.4 38.4 3.0 416
----------------------------------------------------------------------------
Valencia East is located within the existing fully permitted
Valencia Mining Licence, ML 149.
To view FIGURE 1. Locality of Valencia East, please visit the
following link:
http://media3.marketwire.com/docs/FIGURE1-fsy.pdf.
Geology
The geology in Valencia East is very similar to that of the
Valencia Main deposit with uranium mineralization associated to
post D3 deformation anatectic alaskite intruding in stock-like
bodies into Meta-sediments of Nosib and Swakop Group (see Figure
2). The preferred intrusion path is along Khan Rossing Fm boundary
and the structural weakness zones created by complex folding.
The structure strikes NE/SW and is dipping steep to the SE.
To view FIGURE 2. Surface geology of Valencia East, please visit
the following link:
http://media3.marketwire.com/docs/FIGURE2-fsy.pdf.
Valencia East is the structural extention of Valencia Main and
forms a tightly packed sequence of upper Nosib and lower Swakop
Group lithologies dipping steeply to the SE. The sequence is
trending NE/SW and alaskites are intruding in stock work like
bodies subparrallel to the main contacts (Figure 3).
To view FIGURE 3. General structure of Valencia E with D-type
alaskite intruding along Rossing Marble contacts, please visit the
following link:
http://media3.marketwire.com/docs/FIGURE3-fsy.pdf.
Mineralisation
The alkaline leukogranite, also known as alaskite is moderately
to highly radioactive on surface (see Figure 4) and continues to
depth beyond current drill cover. It is characterized by a coarse
grain texture, frequent smoky quartz clusters and the occurrence of
secondaries in the form of yellowish uranophane-group minerals
along micro-cracks and/or mineral boundaries.
To view FIGURE 4. Radiometric footprint of the Valencia East
area, please visit the following link:
http://media3.marketwire.com/docs/FIGURE4-fsy.pdf.
Phase 2 Drilling Program
The 2013 Valencia East drilling program is now underway. The
program is being scheduled for completion by mid 2013. The Company
has an approved budget of US$0.5 million to complete this phase of
drilling which will include a total of 31 percussion drill
holes.
NORASA - CONSOLIDATED NAMIBIAN PROJECTS
The Company has consolidated its various projects in the Erongo
region and collectively they will be known as Norasa. The location
of each project and details of the stage of development and or
resources are detailed in Figure 5 and below:
To view FIGURE 5. Locality map showing Valencia and Namibplaas
licenses in spatial relation, please visit the following link:
http://media3.marketwire.com/docs/Figure5-fsy.pdf.
- Valencia Main: Mineral Resources of 143.80 Mt, grade ppm eU3O8 191 for
60.5 Mlbs U3O8 including Reserves of 148.0 Mt, grade ppm U3O8 172 for
56.0 Mlbs.
- Valencia East: Highly prospective ongoing exploration site.
- Valencia North (previously "Joly Zone"): A prospective exploration
target with 825.5m drilled from 5 diamond drill holes and 451m drilled
from 3 percussion holes. Renewed drilling activity is expected to
commence in H2 2013.
- Namibplaas Main: Mineral Resources of 99.5 Mt, grade ppm eU3O8 152 for
33.4 Mlbs U3O8.
NI 43-101 and Qualified Persons
Mr. Martin Hirsch, M.Sc in Geology and a member of the British
IMMM, Chief Geologist for Forsys Metals Corp., is the designated
Qualified Person responsible for the Company's exploration
programs. He is familiar with the methods for Quality Assurance and
Quality Control specifically applicable to uranium. Mr. Hirsch has
sufficient experience that is relevant to the style and
mineralization, type of deposit and the use of radiometrics in
resource estimates as well as to the activity he is undertaking to
qualify as a Qualified Person under NI 43-101.
About Forsys Metals Corp.
Forsys Metals Corp. is an emerging uranium producer with 100%
ownership of the fully permitted Valencia uranium project and the
Namibplaas uranium project in Namibia, Africa a politically stable
and mining friendly jurisdiction. Information regarding current
National Instrument 43-101 compliant Resource and Reserves at
Valencia and Namibplaas are available on our website.
On behalf of the Board of Directors of Forsys Metals Corp.
Marcel Hilmer, Chief Executive Officer
Sedar Profile #00008536
Forward-Looking Information
This news release contains projections and forward-looking
information that involve various risks and uncertainties regarding
future events. Such forward-looking information can include without
limitation statements based on current expectations involving a
number of risks and uncertainties and are not guarantees of future
performance of the Company. The following are important factors
that could cause Forsys actual results to differ materially from
those expressed or implied by such forward looking statements:
fluctuations in uranium prices and currency exchange rates;
uncertainties relating to interpretation of drill results and the
geology; continuity and grade of mineral deposits; uncertainty of
estimates of capital and operating costs; recovery rates,
production estimates and estimated economic return; general market
conditions; the uncertainty of future profitability; and the
uncertainty of access to additional capital. Full description of
these risks can be found in Forsys Annual Information Form, dated
March 29, 2012, available on the Company's profile on the SEDAR
website at www.sedar.com. These risks and uncertainties could cause
actual results and the Company's plans and objectives to differ
materially from those expressed in the forward-looking information.
Actual results and future events could differ materially from
anticipated in such information. These and all subsequent written
and oral forward looking information are based on estimates and
opinions of management on the dates they are made and expressed
qualified in their entirety by this notice. The Company assumes no
obligation to update forward-looking information should
circumstances or management's estimates or opinions change.
Shares Outstanding: 109,875,422
The Toronto Stock Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of this release.
Contacts: Forsys Metals Corp Marcel Hilmer Chief Executive
Officer +61 417 177 942mhilmer@forsysmetals.com
www.forsysmetals.com TMX Equicom Patrick Piette +1 416-815-0700 Ext
267ppiette@equicomgroup.com
Forsys Metals (TSX:FSY)
Gráfico Histórico do Ativo
De Abr 2024 até Mai 2024
Forsys Metals (TSX:FSY)
Gráfico Histórico do Ativo
De Mai 2023 até Mai 2024