Cartier Highlights Gold Potential over 15 km Strike on Chimo Mine Project
03 Agosto 2023 - 8:03AM
Cartier Resources Inc. (TSX-V: ECR) (“Cartier”) presents an update
of the potential for the Chimo Mine Project (“The Project”),
comprising the Chimo Mine and East Cadillac properties, the latter
of which was acquired in the spring of 2022. The Project, 100%
owned by Cartier, is located at 45 km east of the Val-d'Or mining
camp.
The favorable context for discovery of Chimo
Mine type gold mineralization, as defined by Cartier’s work over
the past 10 years, occurs along a 15-km long east-south-east –
west-north-west oriented strike. The sector currently contributing
to the Project’s recent PEA* and Mineral
Resource Estimate** occupy a 3.7 km long segment of which
represents only 25% of this favorable strike length (FIGURE
1). The favorable strike is marked by numerous historical
drill hole intersections and several deposits, most only drilled to
shallow depths, and all coincident within a string of MegaTEM
anomalies. The table below presents historical drill hole
intersections along favorable strike of the Project.
« This 15-km long stretch shows significant
potential to increase resources and discover new gold zones on the
Project. Drilling programs are ready and the Cartier’s team is
currently reviewing multiple scenarios to rapidly showcase the
value of the Chimo Mine Project » commented Philippe Cloutier,
President and CEO.
Table: Historical drill hole
intersections along favorable strike of the Project (FIGURE
1)
Drill Hole |
CoordinatesUTM (m) |
Azimuth (°)/Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
Sector |
10 |
330918/5320314/335 |
180/-45 |
109.7 |
114.9 |
13.2 |
5.2 |
West Simon |
07-84-25 |
330932/5320380/335 |
180/-45 |
26.2 |
31.2 |
7.9 |
5.0 |
NE09-01 |
334801/5319598/352 |
180/-70 |
293.0 |
299.5 |
12.3 |
6.5 |
Nordeau |
08-84-19 |
334858/5319425/351 |
182/-53 |
116.7 |
119.4 |
12.9 |
2.7 |
NR-87-22 |
335550/5319359/354 |
185/-63 |
185.2 |
191.1 |
31.4 |
5.9 |
East Nordeau |
N-6 |
335507/5319328/355 |
185/-45 |
125.6 |
128.0 |
23.5 |
2.4 |
BA-88-14 |
338222/5319429/360 |
180/-40 |
66.2 |
71.3 |
13.0 |
5.1 |
East Bateman |
BA-90-09 |
338306/5319367/361 |
180/-65 |
29.7 |
33.9 |
9.3 |
4.2 |
The lengths of the mineralized intersections are
expressed as lengths measured along the drill core.
Reminder of the highlights of the Chimo
Mine Project:
- Recent positive Preliminary Economic Assessment*
(FIGURE 2):
- Post-Tax NPV5% of
CAD$388M and 20.8% IRR
- Average annual production of
116,900 ounces of gold at a milled average
of 4.6
g/t Au for a 9.7
years mine life
- Payback period of 2.9 years
- Long term gold price of US$1,750/oz, exchange rate of CAD $1.00
= US $0.77
- Capex of CAD$341M, average all-in sustaining cost of
US$755/oz
- Recent Mineral Resource Estimate** (FIGURE 3):
- 720,000 ounces of gold in the indicated resource
category
- 1,633,000 ounces of gold in the inferred resource category
- The main portion of the Chimo Mine Project, 3.7 km long
east-west, 1.6 km high and 500 m thick north-south, consists to
date of 19 gold structures including 30 gold zones.
- 53% of diluted and recoverable ounces of gold are
contained in 2 gold structures (5B and 5N).
- 46% of diluted and recoverable ounces of gold are
contained in 5 gold zones (5BE, 5NE1-5NE2, 5B and
5NE).
* NI 43-101 Technical Report and Preliminary
Economic Assessment for Chimo Mine and West Nordeau Gold Deposits,
Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R.
Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme
and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions, May,
29nd, 2023.
** NI 43-101 Mineral Resources Estimate for
Chimo Mine and West Nordeau Gold Deposits, Québec, Canada, Vincent
Nadeau-Benoit, P.Geo., Alain Carrier, P.Geo., M.Sc. and Marc R.
Beauvais, P.Eng., InnovExplo Inc., August 22nd, 2022.
About Cartier Resources
Inc.
Cartier Resources Inc. was founded in 2006 and
is an advanced gold project exploration company based in Val-d’Or.
The company’s projects are all located in Quebec, which has
consistently ranked as one of the world’s best mining
jurisdictions. Cartier is advancing the development of its flagship
Chimo Mine Project. The Company has a cash position exceeding
$2.4 M and a significant corporate and institutional
endorsement, including Agnico Eagle Mines, O3 Mining and Quebec
investment funds.
Qualified Persons
The scientific and technical information on the
Company and the Chimo Mine Project in this news release was
prepared and reviewed by Mr. Gaétan Lavallière, P. Geo.,
Ph. D, Cartier’s Vice- President and Mr. Ronan Déroff,
P. Geo, M. Sc., Cartier’s Senior Geologist, Project
Manager and Geomatician, both qualified persons as defined in NI
43-101. Mr. Lavallière approved the information contained in this
press release.
For more information, contact:Philippe Cloutier,
P. Geo.President and CEOTelephone:
819-856-0512philippe.cloutier@ressourcescartier.comwww.ressourcescartier.com
Neither the TSX Venture Exchange nor its
regulatory services provider accepts responsibility for the
adequacy or accuracy of this press release.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/cc98f2f5-8350-44d9-8932-993e1d90c8a7
Cartier Resources (TSXV:ECR)
Gráfico Histórico do Ativo
De Out 2024 até Nov 2024
Cartier Resources (TSXV:ECR)
Gráfico Histórico do Ativo
De Nov 2023 até Nov 2024