Cartier cuts 7.7 g/t Au over 2.0 m in the VG Structure of the Chimo Mine Project
05 Março 2024 - 9:30AM
Cartier Resources Inc. (TSX-V: ECR, FSE: 6CA) (“Cartier or the
Company”) announces the results of its ongoing drilling program
(
FIGURE 1) for the Chimo Mine Project
(
FIGURE 2). The project comprises the Chimo Mine
and East Cadillac properties, the latter of which was acquired on
April 7, 2022 and has not been explored by Cartier to date. Both
properties are 100% owned by Cartier and are located 45 km east of
the Val-d’Or mining camp.
The results were obtained in the VG Structure at
a depth of 35 m and a distance of 275 m west of the VG Zone.
« The initial results from the current drilling
program attest to the potential of a 15-kilometre segment of the
Larder Lake–Cadillac faults corridor of the Chimo Mine Property,
which contains resources*, deposits and numerous gold showings to
be further explored » commented Philippe Cloutier, President and
CEO.
Table 1: Details of the new
results
Hole |
CoordinatesUTM (m) |
Azimuth (°) /Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
Gold Zone |
Gold Structure |
Location: West Nordeau Sector – Confirmation of the VG
Structure 275 m west of the VG Zone |
CH24-94 |
333253/5319894/350 |
160/-57 |
42.0 |
44.0 |
7.7 |
2.0 |
- |
VG |
including |
42.0 |
43.0 |
13.5 |
1.0 |
CH24-95 |
182/-66 |
84.6 |
85.3 |
4.7 |
0.7 |
The widths of the mineralized intersections are
presented as downhole lengths.The true widths of the mineralized
intersections are estimated at 70 to 75% of the reported core
length interval.
Table 2: Details of the
historical results
Hole |
CoordinatesUTM (m) |
Azimuth (°) /Plunge (°) |
From(m) |
To(m) |
Au(g/t) |
Length(m) |
Gold Zone |
Gold Structure |
Location: West Nordeau Sector – VG Structure |
W 90-08 |
333253/5319894/350 |
183/-80 |
59.2 |
61.0 |
14.5 |
1.8 |
- |
VG |
including |
59.4 |
59.7 |
75.3 |
0.3 |
The widths of the mineralized intersections are
presented as downhole lengths.The true widths of the mineralized
intersections are estimated at 55% of the reported core length
interval.
About the Chimo Mine Project:
- Positive PEA**, after tax:
NPV5% of CA$388M and 21%
IRR
- MRE*: 720,000 ounces of gold in
Indicated Resources and 1,633,000 ounces of gold in Inferred
Resources
* NI 43-101 Mineral Resources Estimate for Chimo
Mine and West Nordeau Gold Deposits, Québec, Canada, Vincent
Nadeau-Benoit, P.Geo., Alain Carrier, P.Geo., M.Sc. and Marc R.
Beauvais, P.Eng., InnovExplo Inc., August 22nd, 2022.
** NI 43-101 Technical Report and Preliminary
Economic Assessment for Chimo Mine and West Nordeau Gold Deposits,
Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R.
Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme
and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions, May,
29th, 2023.
About Cartier Resources Inc.Founded in 2006,
Cartier Resources Inc. is an exploration Company based in Val-d’Or,
Quebec, Canada. The Company’s projects are located in Quebec, which
consistently ranks among the world’s best mining jurisdictions.
Cartier is actively advancing the development of its flagship Chimo
Mine Project and exploring its other projects. The Company has a
cash position of $4.2 million and significant corporate and
institutional support, including Agnico Eagle Mines, O3 Mining and
provincial investment funds.
Quality Assurance / Quality
ControlFor each batch of samples sent to the laboratory,
Cartier inserts 5% of the number of samples in the form of
certified standards and another 5% in the form of blanks to ensure
quality control. The samples are analyzed at the Techni-Lab
(Actlabs) laboratory in Ste-Germaine-Boulé, Quebec, Canada. Samples
weighing 3 to 5 kg are crushed by the laboratory to 90% passing 10
mesh (2.00 mm), then a 500 g fraction of each sample is
pulverized to 90% passing 200 mesh (0.07 mm). The resulting 50
g pulps are analyzed by fire assay with an atomic absorption
finish. Samples with results ≥ 1.0 g/t and < 10.0 g/t are
re-assayed by fire assay with an atomic absorption finish. Results
greater than or equal to 10.0 g/t Au are analyzed by fire assay
with a gravimetric finish. For samples containing visible gold, a
500 g subsample of rock is analyzed by the metallic sieve
method.
Qualified PersonsThe Company’s
scientific and technical information in this news release was
prepared and reviewed by Mr. Gaétan Lavallière, P.Geo., PhD,
Vice-President, and Mr. Ronan Déroff, P.Geo., M.Sc., Senior
Geologist, Project Manager and Geomatician, both qualified persons
as defined in National Instrument 43-101. Mr. Lavallière approved
the information contained in this press release.
For more information, contact:Philippe Cloutier,
P.Geo.President and CEOTelephone:
819-856-0512philippe.cloutier@ressourcescartier.comwww.ressourcescartier.com
Neither the TSX Venture Exchange nor its
regulatory services provider accepts responsibility for the
adequacy or accuracy of this press release.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/383d63a4-d91c-4ec7-a069-81f017f7f69d
Cartier Resources (TSXV:ECR)
Gráfico Histórico do Ativo
De Out 2024 até Nov 2024
Cartier Resources (TSXV:ECR)
Gráfico Histórico do Ativo
De Nov 2023 até Nov 2024