UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
 
 
FORM 6-K
 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
 
Date: November 8, 2024
 
Commission File Number: 001-33414
 
 
Denison Mines Corp. 
 (Name of registrant)
 
 
 
1100-40 University Avenue
Toronto Ontario
 M5J 1T1 Canada
 
 (Address of principal executive offices)
 

 Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
 
Form 20-F  ☐            Form    40-F   ☒
 
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ☐
 

 
 
  
 
SIGNATURES
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
 
 
 
 
 
 
 
 
 
 
 
 
 
DENISON MINES CORP.
 
 
 
 
 
 
 
/s/ Amanda Willett
Date November 8, 2024
 
 
 
Amanda Willett
 
 
 
 
Vice President Legal and Corporate Secretary
 
 
 
 
 
FORM 6-K EXHIBIT INDEX
 
 
 

Exhibit 99.1
INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
 
(Unaudited - Expressed in thousands of Canadian dollars (“CAD”) except for share amounts)
 
 
 
 
At September 30
2024
 
At December 31
2023
 
ASSETS
 
 
 
 
 
 
Current
 
 
 
 
 
 
Cash and cash equivalents (note 4)
 
 
$
 105,933
$
131,054
Trade and other receivables
 
 
 
  3,354
 
1,913
Inventories
 
 
 
 3,644
 
3,580
Investments-equity instruments (note 5)
 
 
 
 10,490
 
10,400
Prepaid expenses and other
 
 
 
 816
 
1,594
 
 
 
 
124,237
 
148,541
Non-Current
 
 
 
 
 
 
Inventories-ore in stockpiles
 
 
 
 2,098
 
2,098
Investments-equity instruments (note 5)
 
 
 
 -
 
117
Investments-uranium (note 5)
 
 
 
 242,780
 
276,815
Investments-convertible debentures (note 5)
 
 
 
 14,440
 
15,565
Investments-joint venture (note 6)
 
 
 
 18,173
 
17,290
Restricted cash and investments
 
 
11,799
 
11,231
Property, plant and equipment (note 7)
 
 
 
 258,360
 
254,946
Total assets
 
 
$
 671,887
 $
726,603
 
LIABILITIES
 
 
 
 
 
 
Current
 
 
 
 
 
 
Accounts payable and accrued liabilities (note 8)
 
 
$
 12,912
$
10,822
Current portion of long-term liabilities:
 
 
 
 
 
 
Deferred revenue (note 9)
 
 
 
 4,501
 
4,535
Reclamation obligations (note 10)
 
 
 
 2,257
 
2,256
Other liabilities
 
 
 
 120
 
333
 
 
 
 
 19,790
 
17,946
Non-Current
 
 
 
 
 
 
Deferred revenue (note 9)
 
 
 
 29,914
 
30,423
Reclamation obligations (note 10)
 
 
 
 31,945
 
32,642
Other liabilities
 
 
 
  2,960
 
1,201
Deferred income tax liability
 
 
 
 2,368
 
2,607
Total liabilities
 
 
 
  86,977
 
84,819
 
EQUITY
 
 
 
 
 
 
Share capital (note 11)
 
 
 
 1,657,432
 
1,655,024
Contributed surplus
 
 
 
 72,209
 
69,823
Deficit
 
 
 
 (1,146,498)
 
(1,084,881)
Accumulated other comprehensive income
 
 
 
 1,767
 
1,818
Total equity
 
 
 
 584,910
 
641,784
Total liabilities and equity
 
 
$
 671,887
$
726,603
Issued and outstanding common shares (note 11)
 
 
 
892,596,933
 
890,970,371
Commitments and contingencies (note 17)
 
 
 
 
 
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 1
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF INCOME (LOSS) AND COMPREHENSIVE INCOME (LOSS)
 
(Unaudited - Expressed in thousands of CAD dollars except for share and per share amounts)
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
 
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
REVENUES (note 14)
$
695
$
777
$
2,853
$
763
 
 
 
 
 
 
 
 
 
EXPENSES
 
 
 
 
 
 
 
 
Operating expenses (note 14)
 
 (1,030)
 
 (797)
 
 (3,617)
 
 (2,567)
Exploration (note 14)
 
 (2,834)
 
 (2,052)
 
 (10,002)
 
 (7,833)
Evaluation (note 14)
 
 (8,577)
 
 (5,217)
 
 (20,986)
 
 (12,601)
General and administrative (note 14)
 
 (3,552)
 
 (2,999)
 
 (10,877)
 
 (9,462)
Other (expense) income (note 13)
 
 (10,669)
 
 68,064
 
 (20,347)
 
 90,262
 
 
 (26,662)
 
 56,999
 
 (65,829)
 
 57,799
(Loss) income before net finance expense, equity accounting
 
 (25,967)
 
 57,776
 
 (62,976)
 
 58,562
 
 
 
 
 
 
 
 
 
Finance income (expense), net (note 13)
 
 638
 
 (418)
 
 2,381
 
 (1,706)
Equity share of loss of joint venture (note 6)
 
 (604)
 
 (459)
 
 (1,732)
 
 (3,814)
(Loss) income before taxes
 
(25,933)
 
 56,899
 
(62,327)
 
 53,042
 
 
 
 
 
 
 
 
 
Deferred income tax recovery
 
 166
 
 1,017
 
 239
 
1,695
Net (loss) income from continuing operations
 
 (25,767)
 
 57,916
 
 (62,088)
 
54,737
Net income from discontinued operations,
   net of taxes (note 14)
 
 
-
 
 
321
 
 
 471
 
 
1,161
Net (loss) income for the period
$
(25,767)
$
58,237
$
 (61,617)
$
55,898
 
 
 
 
 
 
 
 
 
Other comprehensive (loss) income:
 
 
 
 
 
 
 
 
Items that are or may be subsequently reclassified to (loss) income:
 
 
 
 
 
 
 
 
Foreign currency translation change
 
 16
 
(114)
 
 (51)
 
15
Comprehensive (loss) income for the period
$
(25,751)
$
58,123
$
(61,668)
$
55,913
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Basic and diluted net (loss) income per share:
 
 
 
 
 
 
 
 
Basic
$
 (0.03)
$
0.07
$
 (0.07)
$
0.07
Diluted
$
 (0.03)
$
0.07
$
 (0.07)
$
0.07
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Weighted-average number of shares outstanding
(in thousands):
 
 
 
 
 
 
 
 
Basic
 
 892,468
 
840,036
 
891,976
 
836,174
Diluted
 
 892,468
 
847,684
 
891,976
 
843,306
 
 
 
 
 
 
 
 
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 2
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 

CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
 
(Unaudited - Expressed in thousands of CAD dollars)
 
 
 
 
Nine Months Ended
September 30
 
 
 
 
 
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Share capital (note 11)
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
$
 1,655,024
$
1,539,209
Shares issued for cash, net of issue costs
 
 
 
 
 
 -
 
37,042
Other shares issued, net of issue costs
 
 
 
 
 
 95
 
193
Share options exercised-cash
 
 
 
 
 
 1,274
 
2,362
Share options exercised-transfer from contributed surplus
 
 
 
 599
 
 981
Share units exercised-transfer from contributed surplus
 
 
 
 440
 
 1,775
Balance-end of period
 
 
 
 
 
 1,657,432
 
1,581,562
 
 
 
 
 
 
 
 
 
Contributed surplus
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
 
 69,823
 
70,281
Share-based compensation expense (note 12)
 
 
 
 
 
 3,425
 
2,686
Share options exercised-transfer to share capital
 
 
 
 
 
 (599)
 
(981)
Share units exercised-transfer to share capital
 
 
 
 
 
 (440)
 
(1,775)
Balance-end of period
 
 
 
 
 
 72,209
 
70,211
 
 
 
 
 
 
 
 
 
Deficit
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
 
 (1,084,881)
 
(1,175,256)
Net (loss) income
 
 
 
 
 
 (61,617)
 
55,898
Balance-end of period
 
 
 
 
 
 (1,146,498)
 
(1,119,358)
 
 
 
 
 
 
 
 
 
Accumulated other comprehensive income (note 13)
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
 
 1,818
 
1,782
Foreign currency translation
 
 
 
 
 
 (51)
 
15
Balance-end of period
 
 
 
 
 
 1,767
 
1,797
 
 
 
 
 
 
 
 
 
Total Equity
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
$
 641,784
$
436,016
Balance-end of period
 
 
 
 
$
584,910
$
534,212
 
 
 
 
 
 
 
 
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 
 3
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOW
 
(Unaudited - Expressed in thousands of CAD dollars)
 
 
 
 
Nine Months Ended
September 30
 
 
 
 
2024
 
2023
 
CASH PROVIDED BY (USED IN):
 
 
 
 
 
 
 
OPERATING ACTIVITIES
 
 
 
 
 
 
Net loss for the period
 
 
$
(61,617)
$
55,898
Adjustments and items not affecting cash and cash equivalents:
 
 
 
 
 
 
Depletion, depreciation, amortization and accretion
 
 
 
 7,528
 
6,934
Fair value change losses (gains):
 
 
 
 
 
 
         Investments-equity instruments (notes 5 and 13)
 
 
 
 135
 
(2,645)
         Investments-uranium (note 5 and 13)
 
 
 
 20,437
 
(85,910)
         Investments-convertible debentures (notes 5 and 13)
 
 
 
 1,125
 
-
Joint venture-equity share of loss (note 6)
 
 
 
 1,732
 
3,814
Recognition of deferred revenue (note 9)
 
 
 
 (2,853)
 
(763)
Gain on property, plant and equipment disposals
 
 
 
 (149)
 
(1,299)
Post-employment benefit payments
 
 
 
 (96)
 
(68)
Reclamation obligation expenditures (note 10)
 
 
 
 (2,117)
 
(2,138)
Reclamation liability deposit from joint venture partner
 
 
 
 -
 
99
Share-based compensation (note 12)
 
 
 
 3,425
 
2,686
Foreign exchange gain (note 13)
 
 
 
 (803)
 
(150)
Deferred income tax recovery
 
 
 
(239)
 
(1,695)
Change in non-cash operating working capital items (note 13)
 
 
 
1,124
 
(571)
Net cash used in operating activities
 
 
 
 (32,368)
 
(25,808)
 
 
 
 
 
 
 
INVESTING ACTIVITIES
 
 
 
 
 
 
Increase in restricted cash and investments
 
 
 
 (568)
 
(269)
Purchase of investment in joint venture (note 6)
 
 
 
 (2,615)
 
(1,979)
Additions of property, plant and equipment (note 7)
 
 
 
 (5,196)
 
(1,525)
Proceeds on disposal of investments – uranium (note 5)
 
 
 
 13,598
 
-
Proceeds on disposal of property, plant and equipment
 
 
 
 227
 
125
Net cash provided by (used in) investing activities
 
 
 
 5,446
 
(3,648)
 
 
 
 
 
 
 
FINANCING ACTIVITIES
 
 
 
 
 
 
Proceeds from share options exercised, net of issue costs (note 12)
 
 
 
 1,258
 
2,362
Repayment of debt obligations
 
 
 
(213)
 
(164)
Proceeds from share issues, net of issue costs
 
 
 
-
 
37,022
Net cash provided by financing activities
 
 
 
 1,045
 
39,220
 
 
 
 
 
 
 
Decrease in cash and cash equivalents
 
 
 
 (25,877)
 
9,764
Foreign exchange effect on cash and cash equivalents
 
 
 
 756
 
160
Cash and cash equivalents, beginning of period
 
 
 
 131,054
 
50,915
Cash and cash equivalents, end of period
 
 
$
 105,933
$
60,839
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 
 
 
 
 
 4
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2024
 
(Unaudited - Expressed in CAD dollars except for shares and per share amounts)
 
 
1.
NATURE OF OPERATIONS
 
Denison Mines Corp. (“DMC”) and its subsidiary companies and joint arrangements (collectively, “Denison” or the “Company”) are engaged in uranium mining related activities, which can include acquisition, exploration, development and mining of uranium bearing properties, as well as the processing and selling of, and investing in uranium.
 
The Company has an effective 95.0% interest in the Wheeler River Joint Venture (“WRJV”), a 69.44% interest in the Waterbury Lake Uranium Limited Partnership (“WLULP”), a 22.5% interest in the McClean Lake Joint Venture (“MLJV”) (which includes the McClean Lake mill) and a 25.17% interest in the Midwest Joint Venture (“MWJV”), each of which are located in the eastern portion of the Athabasca Basin region in northern Saskatchewan, Canada. The McClean Lake mill is contracted to provide toll milling services to the Cigar Lake Joint Venture (“CLJV”) under the terms of a toll milling agreement between the parties (see note 9).
 
Through its 50% ownership of JCU (Canada) Exploration Company, Limited (“JCU”), Denison holds further indirect interests in various uranium project joint ventures in Canada, including the Millennium project (JCU 30.099%), the Kiggavik project (JCU 33.8118%), and the Christie Lake project (JCU 34.4508%). See note 6 for details.
 
DMC is incorporated under the Business Corporations Act (Ontario) and domiciled in Canada. The address of its registered head office is 40 University Avenue, Suite 1100, Toronto, Ontario, Canada, M5J 1T1.
 
 
2.
STATEMENT OF COMPLIANCE
 
These condensed interim consolidated financial statements have been prepared in accordance with International Accounting Standards (“IAS”) 34, Interim Financial Reporting. The condensed interim consolidated financial statements should be read in conjunction with the audited annual consolidated financial statements for the year ended December 31, 2023. The Company’s presentation currency is Canadian dollars (“CAD”).
 
These financial statements were approved by the board of directors for issue on November 7, 2024.
 
 
3.
MATERIAL ACCOUNTING POLICIES
 
The material accounting policies followed in these condensed interim consolidated financial statements are consistent with those applied in the Company’s audited annual consolidated financial statements for the year ended December 31, 2023.
 
The Company has adopted the amendments to IAS 1: Presentation of Financial Statements, IAS 7: Statement of Cash Flows and Errors, IFRS 7: Financial Instruments: Disclosures and IFRS 16: Leases, which are effective for annual periods beginning on or after January 1, 2024 and has concluded that these amendments have no impact on the Company’s condensed interim consolidated financial statements.
 
 
4.
CASH AND CASH EQUIVALENTS
 
The cash and cash equivalent balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Cash
 
 
$
 1,251
$
2,650
Cash in MLJV and MWJV
 
 
 
 543
 
1,036
Cash equivalents
 
 
 
 104,139
 
127,368
 
 
 
$
 105,933
$
131,054
 
 
 
  5
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS

5.
INVESTMENTS
 
The investments balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Investments:
 
 
 
 
 
 
    Equity instruments
 
 
 
 
 
 
       Shares
 
 
$
 10,455
$
10,390
       Warrants
 
 
 
 35
 
127
Convertible Debentures
 
 
 
 14,440
 
15,565
Physical Uranium
 
 
 
 242,780
 
276,815
 
 
 
$
 267,710
$
302,897
 
 
 
 
 
 
 
Investments-by balance sheet presentation:
 
 
 
 
 
 
Current
 
 
$
 10,490
$
10,400
Long-term
 
 
 
 257,220
 
292,497
 
 
 
$
 267,710
$
302,897
 
The investments continuity summary is as follows:
 
 
(in thousands)
 
Equity
Instruments
 
Convertible Debentures
 
Physical
Uranium
 
Total
Investments
 
 
 
 
 
 
 
 
 
Balance-December 31, 2023
$
 10,517
$
 15,565
$
 276,815
$
 302,897
Sale of investments
 
-
 
-
 
(13,598)
 
 (13,598)
Acquisition of investments
 
108
 
-
 
-
 
108
Change in fair value gain to profit and (loss) (note 13)
 
 (135)
 
 (1,125)
 
 (20,437)
 
 (21,697)
Balance-September 30, 2024
$
 10,490
$
 14,440
$
 242,780
$
 267,710
 
Investment in equity instruments and debentures
 
At September 30, 2024, the Company holds equity instruments consisting of shares and warrants in publicly traded companies as well as convertible debt instruments. The convertible debt instruments are classified as non-current as they are convertible and redeemable for a period more than one year after the balance sheet date. During the nine months ended September 30, 2024, a portion of the interest payable on the convertible debentures was settled in shares, at the option of the debtor per the unsecured convertible debenture agreement.
 
Investment in uranium
 
At September 30, 2024, the Company holds a total of 2,200,000 pounds of physical uranium as uranium oxide concentrates (“U3O8“) at a cost of $80,729,000 (USD$65,289,000 or USD$29.67 per pound of U3O8) and market value of $242,780,000 (USD$179,850,000 or USD$81.75 per pound of U3O8).
 
During the second quarter of 2024, the Company settled a sale of 100,000 pounds of U3O8 for proceeds of $13,598,000 (USD$10,000,000).
 
 
 
 
 
 
 
 6
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
6.
INVESTMENT IN JOINT VENTURE
 
The investment in joint venture balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Investment in joint venture:
 
 
 
 
 
 
JCU
 
 
$
 18,173
$
17,290
 
 
 
$
 18,173
$
17,290
 
A summary of the investment in JCU is as follows:
 
(in thousands)
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance-December 31, 2023
 
 
 
 
$
 17,290
Investment at cost:
 
 
 
 
 
 
  Additional investment in JCU
 
 
 
 
 
 2,615
  Equity share of loss
 
 
 
 
 
 (1,732)
Balance-September 30, 2024
 
 
 
 
$
 18,173
 
JCU is a private company that holds a portfolio of twelve uranium project joint venture interests in Canada, including a 10% interest in the WRJV, a 30.099% interest in the Millennium project (Cameco Corporation 69.901%), a 33.8118% interest in the Kiggavik project (Orano Canada Inc. 66.1882%), and a 34.4508% interest in the Christie Lake project (UEC 65.5492%).
 
During the nine months ended September 30, 2024, each shareholder of JCU funded operations with an investment in JCU of $2,615,000. The investment was made by share subscription, where each shareholder acquired additional common shares in JCU in accordance with each shareholder’s pro-rata ownership interest in JCU. As a result, the Company’s ownership interest in JCU remained unchanged at 50%.
 
The following tables summarize the consolidated financial information of JCU on a 100% basis, taking into account adjustments made by Denison for equity accounting purposes (including fair value adjustments and differences in accounting policies). Denison records its equity share of earnings (loss) in JCU one month in arrears (due to the information not yet being available), adjusted for any known material transactions that have occurred up to the period end date on which Denison is reporting.
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Total current assets(1)
 
 
$
 2,433
$
525
Total non-current assets
 
 
 
 38,737
 
38,666
Total current liabilities
 
 
 
 (415)
 
(381)
Total non-current liabilities
 
 
 
 (4,409)
 
(4,230)
Total net assets
 
 
$
 36,346
$
34,580
 
 
 
 7
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nine Months Ended
 
 
 
 
 
 
August 31, 2024(2)
 
 
 
 
 
 
 
Revenue
 
 
 
 
$
-
Net loss
 
 
 
 
 
(3,464)
Other comprehensive income
 
 
 
 
$
-
 
 
 
 
 
 
 
Reconciliation of JCU net assets to Denison investment carrying value:
 
 
 Adjusted net assets of JCU–at December 31, 2023
 
 
$
34,580
Net loss
 
 
 
 
 
(3,464)
Investment from owners
 
 
 
 
 
5,230
Net assets of JCU-at August 31, 2024
 
 
 
 
$
 36,346
Denison ownership interest
 
 
 
 
 
50%
Investment in JCU
 
 
 
 
$
 18,173
(1)
The current assets presented are entirely cash and cash equivalents for September 30, 2024, and December 31, 2023.
(2)
Represents JCU net loss for the nine months ended August 31, 2024 (recorded one month in arrears), adjusted for differences in fair value allocations and accounting policies.
 
 
7.
PROPERTY, PLANT AND EQUIPMENT
 
The property, plant and equipment (“PP&E”) continuity summary is as follows:
 
 
 
Plant and Equipment
 
Mineral
 
Total
(in thousands)
 
Owned
 
Right-of-Use
 
Properties
 
PP&E
 
 
 
 
 
 
 
 
 
Cost:
 
 
 
 
 
 
 
 
Balance-December 31, 2023
$
 112,705
$
 769
$
 180,813
$
 294,287
Additions (note 14)
 
 3,393
 
 1,704
 
 2,116
 
 7,213
Disposals
 
 (602)
 
 -
 
 -
 
 (602)
Balance-September 30, 2024
$
 115,496
$
 2,473
$
 182,929
$
 300,898
 
 
 
 
 
 
 
 
 
Accumulated amortization, depreciation:
 
 
 
 
 
 
 
 
Balance-December 31, 2023
$
 (38,833)
$
 (508)
$
-
$
 (39,341)
Amortization
 
 (480)
 
 -
 
-
 
 (480)
Depreciation
 
 (3,086)
 
 (155)
 
-
 
 (3,241)
Disposals
 
 524
 
 -
 
-
 
 524
Balance-September 30, 2024
$
 (41,875)
$
 (663)
$
-
$
 (42,538)
 
 
 
 
 
 
 
 
 
Carrying value:
 
 
 
 
 
 
 
 
Balance-December 31, 2023
$
 73,872
$
 261
$
 180,813
$
 254,946
Balance-September 30, 2024
$
73,621
$
1,810
$
 182,929
$
258,360
 
Plant and Equipment – Owned
 
The Company has a 22.5% interest in the McClean Lake mill through its ownership interest in the MLJV. The carrying value of the mill, comprised of various infrastructure, building and machinery assets, represents $53,056,000, or 72%, of the September 30, 2024 total carrying value amount of owned Plant and Equipment assets.
 
The additions to PP&E during the nine months ended September 30, 2024 primarily relate to long lead items for Wheeler River and the purchase of the MaxPERF Tool Systems.
 
Plant and Equipment – Right-of-Use
 
The Company has included the cost of various right-of-use (“ROU”) assets within its plant and equipment ROU carrying value amount. These assets consist of building, vehicle, and office equipment leases. The majority of the asset value is attributable to the building lease assets for the Company’s office in Toronto and warehousing space in Saskatoon.
 
 
 8
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Mineral Properties
 
As at September 30, 2024, the Company has various interests in development, evaluation and exploration projects located in Saskatchewan, Canada, which are either held directly or through contractual arrangements. The properties with significant carrying values are Wheeler River, Waterbury Lake, Midwest, Mann Lake, Wolly, Johnston Lake, and McClean Lake, which together represent $165,830,000, or 91%, of the total mineral property carrying value as at September 30, 2024.
 
In January 2024, the Company closed an earn-in agreement with Grounded Lithium Corp (“Grounded Lithium”). with respect to the Kindersley Lithium Project in Saskatchewan (“KLP”). The agreement includes a series of earn-in options, with each earn-in option being comprised of a cash payment to Grounded Lithium as well as work expenditures to advance KLP. Should the Company complete all three earn-in options it will earn a 75% working interest in the KLP. The Company made a payment of $800,000 to Grounded Lithium, incurred $61,000 of transaction expenses related to agreement, and currently holds no interest in KLP. The Company has incurred expenditures of $360,000 to the end of September 30, 2024, related to the earn-in option. The expenses incurred are expensed, consistent with the Company’s accounting policy.
 
 
8. ACCOUNTS PAYABLE AND ACCRUED LIABILITIES
 
The accounts payable and accrued liabilities balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Trade payables
 
 
$
 6,615
$
5,037
Payables in MLJV and MWJV
 
 
 
 5,678
 
4,843
Other payables
 
 
 
 619
 
942
 
 
 
$
 12,912
$
10,822
 
 
9. DEFERRED REVENUE
 
The deferred revenue balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Deferred revenue-pre-sold toll milling:
 
 
 
 
 
 
CLJV Toll Milling-Ecora
 
 
$
 34,415
$
34,958
 
 
 
$
 34,415
$
34,958
 
Deferred revenue-by balance sheet presentation:
 
 
 
 
Current
 
 
$
 4,501
$
4,535
Non-current
 
 
 
 29,914
 
30,423
 
 
 
$
 34,415
$
34,958
 
The deferred revenue liability continuity summary is as follows:
 
 
(in thousands)
 
 
 
 
 
 
Deferred
Revenue
 
 
 
 
 
 
 
Balance-December 31, 2023
 
 
 
 
$
 34,958
Revenue recognized during the period (note 14)
 
 
 
 
 
 (2,853)
Accretion (note 13)
 
 
 
 
 
 2,310
Balance-September 30, 2024
 
 
 
 
$
 34,415
 
Arrangement with Ecora Resources PLC (“Ecora”)
 
In February 2017, Denison closed an arrangement with Ecora, under which Denison received an upfront payment in exchange for its right to receive specified future toll milling cash receipts from the MLJV under the current toll milling agreement with the CLJV from July 1, 2016 onwards. The up-front payment was based upon an estimate of the gross toll milling cash receipts to be received by Denison.
 
 
 9
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
The Ecora Arrangement represents a contractual obligation of Denison to pay onward to Ecora any cash proceeds of future toll milling revenue earned by the Company related to the processing of the specified Cigar Lake ore through the McClean Lake mill. The deferred revenue balance represents a non-cash liability, which is adjusted as any toll milling revenue received by Denison is passed through to Ecora, or any changes in Cigar Lake Phase 1 and Phase 2 tolling milling production estimates are recognized.
 
During the nine months ended September 30, 2024, the Company recognized $2,853,000 of toll milling revenue from the draw-down of deferred revenue, based on Cigar Lake toll milling production of 12,247,000 pounds U3O8 (100% basis). The draw-down in 2024 includes a cumulative decrease in revenue for prior periods of $207,000 resulting from changes in estimates to the toll milling rates during 2024.
 
For the comparative nine months ended September 30, 2023, the Company recognized toll milling revenue of $763,000. Production-based revenue of $2,601,000 was recognized based on toll milling production of 10,310,000 pounds U3O8 (100% basis). The production-based revenue was offset by a $1,838,000 true-up adjustment to decrease the revenue recognized in prior periods as a result of changes in the estimates to determine the toll milling drawdown rate.
 
During the nine months ended September 30, 2024, the Company recognized accretion expense of $2,310,000, including a true-up adjustment of $63,000 due to the change in the estimated timing of milling of the Cigar Lake ore (September 30, 2023, accretion expense of $2,726,000 including a $452,000 true up adjustment).
 
The current portion of the deferred revenue liability reflects Denison’s estimate of Cigar Lake toll milling over the next 12 months. This assumption is based on current mill packaged production expectations and is reassessed on a quarterly basis.
 
 
10. RECLAMATION OBLIGATIONS
 
The reclamation obligations balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Reclamation obligations-by item:
 
 
 
 
 
 
Elliot Lake
 
 
$
 19,853
$
19,796
MLJV and MWJV
 
 
 
 12,709
 
12,215
Wheeler River and other
 
 
 
1,640
 
2,887
 
 
 
$
 34,202
$
34,898
 
 
 
 
 
 
 
Reclamation obligations-by balance sheet presentation:
 
 
 
 
Current
 
 
$
 2,257
$
2,256
Non-current
 
 
 
 31,945
 
32,642
 
 
 
$
 34,202
$
34,898
 
The reclamation obligations continuity summary is as follows:
 
 
(in thousands)
 
 
 
 
 
Reclamation
Obligations
 
 
 
 
 
 
 
Balance-December 31, 2023
 
 
 
 
$
 34,898
Accretion (note 13)
 
 
 
 
 
 1,421
Expenditures incurred
 
 
 
 
 
 (2,117)
Balance-September 30, 2024
 
 
 
 
$
 34,202
 
 
 
 10
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
Site Restoration: Elliot Lake
 
The Elliot Lake uranium mine was closed in 1992 and capital works to decommission this site were completed in 1997. The Company is responsible for monitoring the Tailings Management Areas at the Denison and Stanrock sites and for treatment of water discharged from these areas.
 
Spending on restoration activities at the Elliot Lake site is funded by the Elliot Lake Reclamation Trust (“Trust”). The Trust had a balance of $3,827,000 as at September 30, 2024 (December 31, 2023 - $3,259,000)
 
Site Restoration: McClean Lake Joint Venture and Midwest Joint Venture
 
Under the Saskatchewan Mineral Industry Environmental Protection Regulations (1996), the Company is required to provide its pro-rata share of financial assurances to the province of Saskatchewan relating to future decommissioning and reclamation plans that have been filed with, and approved, by the applicable regulatory authorities. As at September 30, 2024, the Company has provided irrevocable standby letters of credit, from a chartered bank, in favour of the Saskatchewan Ministry of Environment, totalling $22,972,000, which relate to the most recently filed reclamation plan dated November 2021.
 
Site Restoration: Wheeler River and other
 
The Company’s exploration and evaluation activities, including those related to Wheeler River, are subject to environmental regulations as set out by the Government of Saskatchewan.
 
 
11. SHARE CAPITAL
 
Denison is authorized to issue an unlimited number of common shares without par value. A continuity summary of the issued and outstanding common shares and the associated dollar amounts is presented below:
 
 
Number of
 
 
 
Common
 
Share
(in thousands except share amounts)
Shares
 
Capital
 
 
 
 
Balance-December 31, 2023
890,970,371
$
1,655,024
Issued for cash:
 
 
 
Share option exercises
1,032,334
 
 1,274
Share option exercises-transfer from contributed surplus
-
 
 599
Share unit exercises-transfer from contributed surplus
 552,333
 
 440
Other share issues proceeds, net of issues costs
41,895
 
95
 
1,626,562
 
 2,408
Balance-September 30, 2024
892,596,933
$
 1,657,432
 
 
12. SHARE-BASED COMPENSATION
 
The Company’s share-based compensation arrangements include share options, restricted share units (“RSUs”) and performance share units (“PSUs”).
 
Share-based compensation is recorded over the vesting period, and a summary of share-based compensation expense recognized in the statement of income (loss) is as follows:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Share based compensation expense for:
 
 
 
 
 
 
 
 
Share options
$
 (404)
$
(261)
$
 (1,149)
$
(958)
RSUs
 
 (809)
 
(488)
 
 (2,276)
 
(1,642)
PSUs
 
 -
 
-
 
 -
 
(86)
Share based compensation expense
$
 (1,213)
$
(749)
$
 (3,425)
$
(2,686)
 
 
 
 11
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
An additional $4,888,000 in share-based compensation expense remains to be recognized, up until August 2027, on outstanding share options and share units at September 30, 2024.
 
Share Options
 
Share options granted in 2024 vest over a period of three years. A continuity summary of the share options granted under the Company’s Share Option Plan is presented below:
 
 
 
 
 
2024
 
 
 
 
 
 
 
 
Weighted
 
 
 
 
 
 
 
 
Average
 
 
 
 
 
 
 
 
Exercise
 
 
 
 
 
 
Number of
Common
 
Price per
Share
 
 
 
 
 
 
Shares
 
(CAD)
 
 
 
 
 
 
 
 
 
Share options outstanding-December 31, 2023
 
 
 
 
 
 5,220,667
$
1.49
Grants
 
 
 
 
 
 1,618,000
 
 2.59
Exercises (1)
 
 
 
 
 
 (1,032,334)
 
 1.23
Expiries
 
 
 
 
 
 (16,000)
 
0.68
Forfeitures
 
 
 
 
 
 (61,333)
 
1.50
Share options outstanding-September 30, 2024
 
 
 
 
 
 5,729,000
$
 1.85
Share options exercisable-September 30, 2024
 
 
 
 
 
2,614,000
$
1.50
(1)
The weighted average share price at the date of exercise was CAD$2.60.
 
A summary of the Company’s share options outstanding at September 30, 2024 is presented below:
 
 
 
 
 
 
Weighted
 
 
 
Weighted-
 
 
 
 
 
Average
 
 
 
Average
 
 
 
 
 
Remaining
 
 
 
Exercise
Range of Exercise
 
 
 
 
Contractual
 
Number of
 
Price per
Prices per Share
 
 
 
 
Life
 
Common
 
Share
(CAD)
 
 
 
 
(Years)
 
Shares
 
(CAD)
 
 
 
 
 
 
 
 
 
 
Share options outstanding
 
 
 
 
 
 
$ 0.01 to $ 0.99
 
0.44
 
36,000
$
0.46
$ 1.01 to $ 1.50
 
 
 
 
2.53
 
2,703,666
 
1.40
$ 1.51 to $ 2.00
 
 
 
 
2.46
 
1,198,334
 
1.84
$ 2.01 to $ 2.50
 
 
 
 
3.79
 
250,000
 
2.19
$ 2.51 to $ 3.00
 
 
 
 
4.43
 
1,541,000
 
2.62
Share options outstanding-September 30, 2024
 
3.07
 
5,729,000
$
1.85
 
Share options outstanding at September 30, 2024 expire between March 2025 and August 2029.
 
The fair value of each share option granted is estimated on the date of grant using the Black-Scholes option pricing model. The following table outlines the weighted-average assumptions used in the model to determine the fair value of share options granted:
 
 
 
 
 
Nine Months Ended
 
 
 
 
September 30, 2024
 
 
 
 
 
Risk-free interest rate
 
 
 
3.01% - 3.75%
Expected stock price volatility
 
 
 
60.73% - 66.40%
Expected life
 
 
 
3.40 years - 3.41 years
Expected dividend yield
 
 
 
-
Fair value per options granted
 
 
$0.93 to $1.38
 
 
 
 12
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
Share Units
 
RSUs granted under the Share Unit Plan in 2024 vest ratably over a period of three years.
 
 
 
RSUs
 
PSUs
 
 
 
 
Weighted
 
 
 
Weighted
 
 
 
 
Average
 
 
 
Average
 
 
Number of
 
Fair Value
 
Number of
 
Fair Value
 
 
Common
 
Per RSU
 
Common
 
Per PSU
 
 
Shares
 
(CAD)
 
Shares
 
(CAD)
 
 
 
 
 
 
 
 
 
Units outstanding–December 31, 2023
 
 5,580,919
$
1.20
 
481,500
$
0.83
Grants
 
 1,867,000
 
 2.58
 
-
 
      -
Exercises (1)
 
 (330,833)
 
 0.87
 
(221,500)
 
0.65
Forfeitures
 
(118,000)
 
2.21
 
-
 
      -
Units outstanding–September 30, 2024
 
 6,999,086
$
 1.57
 
260,000
$
0.98
Units vested–September 30, 2024
 
4,038,418
$
1.07
 
260,000
$
0.98
(1)
The weighted average share price at the date of exercise was $2.36 for RSUs and $2.63 for PSUs.
 
The fair value of each RSU and PSU granted is estimated on the date of grant using the Company’s closing share price on the day before the grant date.
 
 
13. SUPPLEMENTAL FINANCIAL INFORMATION
 
The accumulated other comprehensive income balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2024
 
2023
 
 
 
 
 
 
 
Cumulative foreign currency translation
 
 
$
 405
$
456
Experience gains-post employment liability
 
 
 
 
Gross
 
 
 
 1,847
 
1,847
Tax effect
 
 
 
 (485)
 
(485)
 
 
 
$
 1,767
$
1,818
 
The components of Other (expense) income are as follows:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Gains (losses) on:
 
 
 
 
 
 
 
 
Foreign exchange
$
 (308)
$
341
$
 803
$
150
Disposal of property, plant and equipment
 
 20
 
-
 
 20
 
1,299
Fair value changes (note 5):
 
 
 
 
 
 
 
 
   Investments-equity instruments
 
 3,289
 
4,530
 
 (135)
 
2,645
   Investments-uranium
 
 (14,680)
 
63,089
 
 (20,437)
 
85,910
   Investments-convertible debentures
 
 310
 
-
 
 (1,125)
 
-
    Gain on recognition of proceeds–UI Repayment Agreement
 
 
801
 
 
267
 
 
 1,197
 
 
802
Uranium investment carrying charges
 
 (207)
 
(95)
 
 (633)
 
(286)
Other
 
 106
 
(68)
 
 (37)
 
(258)
Other (expense) income
$
 (10,669)
$
68,064
$
 (20,347)
$
90,262
 
 
 
 13
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
    The components of Finance income (expense) are as follows:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Interest income
$
 1,891
$
741
$
 6,173
$
2,321
Interest expense
 
 (2)
 
(2)
 
 (5)
 
(4)
Accretion expense
 
 
 
 
 
 
 
 
Deferred revenue (note 9)
 
 (749)
 
(725)
 
 (2,310)
 
(2,726)
Reclamation obligations (note 10)
 
 (475)
 
(421)
 
 (1,421)
 
(1,261)
Other
 
 (27)
 
(11)
 
 (56)
 
(36)
Finance income (expense)
$
 638
$
(418)
$
 2,381
$
(1,706)
 
        The change in non-cash operating working capital items in the consolidated statements of cash flows is as follows:
 
 
 
 
 
Nine Months Ended
September 30
(in thousands)
 
 
 
 
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Change in non-cash working capital items:
 
 
 
 
 
 
 
 
Trade and other receivables
 
 
 
 
$
 (1,374)
$
(1,505)
Inventories
 
 
 
 
 
 (63)
 
(582)
Prepaid expenses and other assets
 
 
 
 
 
 759
 
592
Accounts payable and accrued liabilities
 
 
 
 
 
 1,802
 
924
Change in non-cash working capital items
 
 
 
 
$
 1,124
$
(571)
 
 
14. SEGMENTED INFORMATION
 
Business Segments
 
The Company operates in two primary segments – the Mining segment and the Corporate and Other segment. The Mining segment includes activities related to exploration, evaluation and development, mining, milling (including toll milling) and the sale of mineral concentrates. The Corporate and Other segment includes general corporate expenses not allocated to the other segments. The Company also previously had a third primary segment of operations, for activities related to the Company’s former environmental services business which provided mine decommissioning and other services to third parties (see Discontinued Operations for further information).
 
 
 
 
 14
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
For the nine months ended September 30, 2024, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
2,853
 -
2,853
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (3,617)
 -
 (3,617)
Exploration
 
 
 (10,002)
 -
 (10,002)
Evaluation
 
 
 (20,986)
 -
 (20,986)
General and administrative
 
 
 (19)
 (10,858)
 (10,877)
 
 
 
 (34,624)
 (10,858)
 (45,482)
Segment loss
 
$
 (31,771)
 (10,858)
 (42,629)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 9)
 
2,853
-
2,853
 
 
$
2,853
-
2,853
 
 
 
 
 
 
Capital additions:
 
 
 
 
 
 Property, plant and equipment (note 7)
$
 6,460
753
 7,213
 
 
 
 
 
 
Long-lived assets:
 
 
 
 
 
Plant and equipment
 
 
 
 
 
Cost
 
$
 110,534
  7,435
 117,969
Accumulated depreciation
 
 
 (40,892)
 (1,646)
 (42,538)
Mineral properties
 
 
 182,929
 -
 182,929
 
 
$
 252,571
5,789
 258,360
 
For the three months ended September 30, 2024, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
 695
 -
 695
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (1,030)
 -
 (1,030)
Exploration
 
 
 (2,834)
 -
 (2,834)
Evaluation
 
 
 (8,577)
 -
 (8,577)
General and administrative
 
 
 -
 (3,552)
 (3,552)
 
 
 
 (12,441)
 (3,552)
 (15,993)
Segment loss
 
$
 (11,746)
 (3,552)
 (15,298)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 9)
 
695
-
695
 
 
$
695
-
695
 
 
 
 
 15
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
  For the nine months ended September 30, 2023, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
 763
 -
 763
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (2,567)
 -
 (2,567)
Exploration
 
 
 (7,833)
 -
 (7,833)
Evaluation
 
 
 (12,601)
 -
 (12,601)
General and administrative
 
 
 (19)
 (9,443)
 (9,462)
 
 
 
 (23,020)
 (9,443)
 (32,463)
Segment loss
 
$
 (22,257)
 (9,443)
 (31,700)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 9)
 
763
-
763
 
 
$
763
-
763
 
 
 
 
 
 
Capital additions:
 
 
 
 
 
 Property, plant and equipment
$
 560
 999
 1,559
 
 
 
 
 
 
Long-lived assets:
 
 
 
 
 
Plant and equipment
 
 
 
 
 
Cost
 
$
 103,360
 6,291
 109,651
Accumulated depreciation
 
 
 (37,152)
 (1,013)
 (38,165)
Mineral properties
 
 
 179,357
 -
 179,357
 
 
$
 245,565
 5,278
 250,843
 
For the three months ended September 30, 2023, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
 777
 -
 777
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (797)
 -
 (797)
Exploration
 
 
 (2,052)
 -
 (2,052)
Evaluation
 
 
 (5,217)
 -
 (5,217)
General and administrative
 
 
 -
 (2,999)
 (2,999)
 
 
 
 (8,066)
 (2,999)
 (11,065)
Segment loss
 
$
 (7,289)
 (2,999)
 (10,288)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 9)
 
777
-
777
 
 
$
777
-
777
 
Discontinued Operations
 
The Company previously provided post-closure mine care and maintenance services, which were previously reported in a Closed Mines services segment and now constitute a discontinued operation. The consolidated statement of income (loss) for the discontinued operation is as follows:
 
 
 16
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
 
 
 
Three Month Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Revenue
$
-
$
1,993
$
-
$
6,582
 
 
 
 
 
 
 
 
 
Expenses
 
 
 
 
 
 
 
 
Operating expenses
 
-
 
(1,694)
 
-
 
(5,491)
Other income
 
 -
 
22
 
471
 
70
Income from discontinued operations,
   net of taxes
$
-
$
321
 
$
471
$
1,161
 
 
15. RELATED PARTY TRANSACTIONS
 
Korea Electric Power Corporation (“KEPCO”) and Korea Hydro & Nuclear Power (“KHNP”)
 
Denison and KHNP Canada Energy Ltd. (“KHNP Canda”, which is an indirect subsidiary of KEPCO through KHNP) are parties to a strategic relationship agreement (the “KHNP SRA”). The KHNP SRA provides for a long-term collaborative business relationship between the parties, which includes a right of KHNP Canada to nominate one representative to Denison’s Board of Directors, provided that its shareholding percentage stays above 5%.
 
KHNP Canada is also the majority member of the Korea Waterbury Uranium Limited Partnership, which is a consortium of investors that holds the non-Denison owned interests in Waterbury Lake Uranium Corporation (“WLUC”) and Waterbury Lake Uranium Limited Partnership (“WLULP”), entities whose key asset is the Waterbury Lake property.
 
Compensation of Key Management Personnel
 
Key management personnel are those persons having authority and responsibility for planning, directing and controlling the activities of the Company, directly or indirectly. Key management personnel includes the Company’s executive officers, vice-presidents and members of its Board of Directors.
 
The following compensation was awarded to key management personnel:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Salaries and short-term employee benefits
$
(895)
$
(512)
$
(3,503)
$
(2,156)
Share-based compensation
 
(814)
 
(544)
 
(2,467)
 
(2,017)
Key management personnel compensation
$
(1,709)
$
(1,056)
$
(5,970)
$
(4,173)
 
 
16. FAIR VALUE OF INVESTMENTS AND FINANCIAL INSTRUMENTS
 
IFRS requires disclosures about the inputs to fair value measurements, including their classification within a hierarchy that prioritizes the inputs to fair value measurement. The three levels of the fair value hierarchy are:
 
Level 1 - Unadjusted quoted prices in active markets for identical assets or liabilities;
Level 2 - Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
Level 3 - Inputs that are not based on observable market data.
 
The fair value of financial instruments which trade in active markets, such as share and warrant equity instruments, is based on quoted market prices at the balance sheet date. The quoted market price used to value financial assets held by the Company is the current closing price. Warrants that do not trade in active markets have been valued using the Black-Scholes pricing model. Debt instruments have been valued using the effective interest rate for the period that the Company expects to hold the instrument and not the rate to maturity.
 
 
 17
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Except as otherwise disclosed, the fair values of cash and cash equivalents, trade and other receivables, accounts payable and accrued liabilities, restricted cash and cash equivalents and debt obligations approximate their carrying values as a result of the short-term nature of the instruments, the variable interest rate associated with the instruments or the fixed interest rate of the instruments being similar to market rates.
 
During 2024 and 2023, there were no transfers between levels 1, 2 and 3 and there were no changes in valuation techniques.
 
The following table illustrates the classification of the Company’s financial assets and liabilities within the fair value hierarchy:
 
 
 
Financial
 
Fair
 
September 30,
 
December 31,
 
 
Instrument
 
Value
 
2024
 
2023
(in thousands)
 
Category(1)
 
Hierarchy
 
Fair Value
 
Fair Value
 
 
 
 
 
 
 
 
 
Financial Assets:
 
 
 
 
 
 
 
 
Cash and equivalents
 
Category B
 
 
$
 105,933
$
131,054
Trade and other receivables
 
Category B
 
 
 
 3,354
 
1,913
Investments
 
 
 
 
 
 
 
 
Equity instruments-shares
 
Category A
 
Level 1
 
 10,455
 
10,390
Equity instruments-warrants
 
Category A
 
Level 2
 
 35
 
127
Convertible Debentures
 
Category A
 
Level 3
 
 14,440
 
15,565
Restricted cash and equivalents
 
 
 
 
 
 
 
 
Elliot Lake reclamation trust fund
 
Category B
 
 
 
 3,827
 
3,259
Credit facility pledged assets
 
Category B
 
 
 
 7,972
 
7,972
 
 
 
 
 
$
146,016
$
170,280
 
 
 
 
 
 
 
 
 
Financial Liabilities:
 
 
 
 
 
 
 
 
Account payable and accrued liabilities
 
Category C
 
 
 
 12,912
 
10,822
Debt obligations
 
Category C
 
 
 
 2,045
 
417
 
 
 
 
 
$
 14,957
$
11,239
(1)
Financial instrument designations are as follows: Category A=Financial assets and liabilities at fair value through profit and loss; Category B=Financial assets at amortized cost; and Category C=Financial liabilities at amortized cost.
 
Investments in uranium are categorized in Level 2. Investments in uranium are measured at fair value at each reporting period based on the month-end spot price for uranium published by UxC and converted to Canadian dollars using the period-end indicative foreign exchange rate.
 
Letters of Credit Facility
 
In December 2023, the Company entered into an agreement with The Bank of Nova Scotia to amend the terms of the Company’s Credit Facility to extend the maturity date to January 31, 2025 (the “Credit Facility”). All other terms of the Credit Facility (amount of credit facility, tangible net worth covenant, investment amounts, pledged assets and security for the facility) remain unchanged by the amendment and the Credit Facility remains subject to letter of credit and standby fees of 2.40% (0.40% on the $7,972,000 covered by pledged cash collateral) and 0.75% respectively. During the nine months ended September 30, 2024, the Company incurred letter of credit fees of $314,000 (September 30, 2023 - $320,000).
 
At September 30, 2024, the Company is in compliance with its facility covenants and has access to letters of credit of up to $23,964,000 (December 31, 2023 - $23,964,000). The facility is fully utilized as collateral for non-financial letters of credit issued in support of reclamation obligations for the MLJV, MWJV and Wheeler River (see note 10).
 
 
17. COMMITMENTS AND CONTINGENCIES
 
Capital Commitments
 
As of September 30, 2024, the Company has $9,900,000 in committed capital purchases related to its share of the long lead item procurement for the Wheeler Joint Venture ($11,100,000 in committed capital purchases on 100% basis). Thess commitments are related to long lead items and expected to be realized over the next 12 to 18 months.
 
 
 18
 
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
General Legal Matters
 
The Company is involved, from time to time, in various legal actions and claims in the ordinary course of business.
In the opinion of management, the aggregate amount of any potential liability is not expected to have a material
adverse effect on the Company’s financial position or results.
 
 
18. SUBSEQUENT EVENT
 
Option agreement with Foremost Clean Energy Ltd (“Foremost”)
 
On October 4, 2024, the Company closed the first phase of an Option Agreement with Foremost and acquired 1,369,810 shares of Foremost, valued at $5,876,000, as consideration for an initial 20% ownership of the Company’s interest in 10 uranium exploration properties. The Option Agreement provides Foremost with the option to acquire up to 70% of Denison's interest in 10 exploration properties over three earn-in phases. On completion of the first phase the Company owned approximately 19.95% of the issued and outstanding shares of Foremost.
 
 
 
 
 
 
 
 
 
  19
 
  Exhibit 99.2
 
 
 
 
 
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
FOR THE THREE AND NINE MONTHS ENDED
SEPTEMBER 30, 2024
 
 
 
 TABLE OF CONTENTS
 
 Q3 2024 PERFORMANCE HIGHLIGHTS
 2
 ABOUT DENISON
 3
 RESULTS OF CONTINUING OPERATIONS
 4
         Wheeler River Uranium Project
 6
 LIQUIDITY AND CAPITAL RESOURCES
 20
 DISCONTINUED OPERATIONS
 22
 OUTLOOK FOR 2024
 23
 ADDITIONAL INFORMATION
 23
 CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
 24
 

 
 
 
 
 
This Management’s Discussion and Analysis (‘MD&A’) of Denison Mines Corp. and its subsidiary companies and joint arrangements (collectively, ‘Denison’ or the ‘Company’) provides a detailed analysis of the Company’s business and compares its financial results with those of the previous year. This MD&A is dated as of November 7, 2024 and should be read in conjunction with the Company’s unaudited interim condensed consolidated financial statements and related notes for the three and nine months ended September 30, 2024. The unaudited interim condensed consolidated financial statements are prepared in accordance with International Financial Reporting Standards (‘IFRS’) as issued by the International Accounting Standards Board (‘IASB’), including IAS 34, Interim Financial Reporting. Readers are also encouraged to consult the audited consolidated financial statements and MD&A for the year ended December 31, 2023. All dollar amounts in this MD&A are expressed in Canadian dollars, unless otherwise noted.
 
Additional information about Denison, including the Company’s press releases, quarterly and annual reports, Annual Information Form and Form 40-F is available through the Company’s filings with the securities regulatory authorities in Canada at www.sedarplus.ca (‘SEDAR+’) and the United States at www.sec.gov/edgar.shtml (‘EDGAR’).
 
 
 
 
 
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
Q3 2024 PERFORMANCE HIGHLIGHTS
 
 
Signing of Wheeler River Benefit Agreements with Kineepik Métis Local #9 and the Village of Pinehouse Lake
 
In July 2024, Denison announced the signing of a Mutual Benefits Agreement (‘MBA’) with Kineepik Métis Local #9 (‘KML’), and a Community Benefit Agreement (‘CBA’) with the northern Village of Pinehouse Lake (‘Pinehouse’), in support of the development and operation of Denison’s 95% owned Wheeler River Project.
 
The MBA acknowledges that the project is located within KML’s Land and Occupancy Area in northern Saskatchewan and provides KML’s consent and support to advance the project. Additionally, the MBA recognizes that the development and operation of the project can support KML in advancing its social and economic development aspirations, while mitigating the impacts on the local environment and KML members. The MBA provides KML and its Métis members an important role in environmental monitoring and commits to the sharing of benefits from the successful operation of the project – including benefits from community investment, business opportunities, employment and training opportunities, and financial compensation.
 
The CBA acknowledges that Pinehouse is the closest residential community to the project by road, which relies on much of the same regional infrastructure that Denison will rely on as it advances the project. Pinehouse has provided its consent and support for the project, while Denison, on behalf of the Wheeler River Joint Venture, is committed to help Pinehouse develop its own capacity to take advantage of economic and other development opportunities in connection with the advancement and operation of the project.
 
Continued Advancement of Phoenix Engineering and Federal Regulatory Review of the Draft EIS
 
During the third quarter, the Company continued to focus its efforts on the advancement of the Phoenix project towards a final investment decision, in support of its objective to achieve first production by 2027 / 2028, including:
 
Phoenix engineering activities are advancing within expected timelines to support a financial investment decision (‘FID’) by mid-2025. Total engineering completion at end of the third quarter was 45%, supported by finalization of process design, piping and instrumentation diagrams (P&ID’s), hazard and operability studies (‘HAZOPs’), as well as the selection of major process equipment and electrical distribution infrastructure.
 
The review of the draft Environmental Impact Statement (‘EIS’) continues to advance and Denison has been in regular contact with CNSC staff to support the conclusion of any remaining information requests (‘IRs’). In September 2024, Denison received confirmation that the majority of outstanding IRs have been resolved, which suggests that the Federal review process is nearing completion.
 
Option of Non-Core Exploration Projects to Foremost Clean Energy Ltd.
 
In September 2024, Denison executed an option agreement with Foremost Clean Energy Ltd (‘Foremost’), which grants Foremost an option to acquire up to 70% of Denison's interest in 10 non-core uranium exploration properties (collectively, the ‘Foremost Transaction’). Pursuant to the Foremost Transaction, Foremost would acquire such total interests upon completion of a combination of direct payments to Denison and funding of exploration expenditures with an aggregate value of up to approximately $30 million. The Foremost Transaction provides the following benefits to Denison:
 
Collaboration with Foremost is expected to increase exploration activity on a portfolio of non-core Denison properties with the potential to increase the probability of discovery within Denison's vast Athabasca Basin exploration portfolio.
 
In October 2024, Denison received an upfront payment in Foremost common shares (representing an ~19.95% ownership interest in Foremost). If Foremost completes the remaining two phases of the Foremost Transaction Denison will receive further cash and/or common share milestone payments of $4.5 million and Foremost will fund of $20 million in project exploration expenditures.
 
In addition to becoming Foremost’s largest shareholder, Denison retains direct interests in the optioned exploration properties and also secures certain strategic pre-emptive rights to participate in future exploration success from the optioned properties.
 

 
 
 2
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
ABOUT DENISON
 
Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories. Denison’s common shares are listed on the Toronto Stock Exchange (the ‘TSX’) under the symbol ‘DML’ and on the NYSE American exchange under the symbol ‘DNN’.
 
Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. In mid-2023, a Feasibility Study (‘FS’) was completed for the Phoenix deposit as an ISR mining operation, and an update to the previously prepared 2018 Pre-Feasibility Study (‘PFS’) was completed for Wheeler River’s Gryphon deposit as a conventional underground mining operation (the ‘Gryphon Update’). Based on the respective studies, both deposits have the potential to be competitive with the lowest cost uranium mining operations in the world. Permitting efforts for the planned Phoenix ISR operation commenced in 2019 and have advanced significantly, with licensing in progress and a draft Environmental Impact Statement (‘EIS’) submitted for regulatory and public review in October 2022.
 
Denison’s interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake Joint Venture (‘MLJV’), which includes unmined uranium deposits (planned for extraction via the MLJV’s SABRE mining method starting in 2025) and the McClean Lake uranium mill (currently utilizing a portion of its licensed capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Main and Midwest A deposits held by the Midwest Joint Venture (‘MWJV’), and a 69.44% interest in the Tthe Heldeth Túé (‘THT’) and Huskie deposits on the Waterbury Lake Property (‘Waterbury’). The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, the Company has direct ownership interests in properties covering ~384,000 hectares in the Athabasca Basin region.
 
Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited (‘JCU’), Denison holds further interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).
 
In 2024, Denison is celebrating its 70th year in uranium mining, exploration, and development, which began in 1954 with Denison’s first acquisition of mining claims in the Elliot Lake region of northern Ontario.
 
 
SELECTED FINANCIAL INFORMATION
 
(in thousands)
 
As at
September 30,
2024
 
As at
December 31,
2023
 
 
 
 
 
Financial Position:
 
 
 
 
Cash and cash equivalents
$
 105,933
$
131,054
Working capital(1)
$
108,948
$
135,130
Investments in uranium
$
 242,780
$
276,815
Property, plant and equipment
$
 258,360
$
254,946
Total assets
$
 671,887
$
726,603
Total long-term liabilities(2)
$
 67,187
$
66,873
(1)
Working capital is a non-IFRS financial measure and is calculated as the value of current assets less the value of current liabilities, excluding non-cash current liabilities. Working capital as at September 30, 2024 excludes $4,501,000 from the current portion of deferred revenue (December 31, 2023 – $4,535,000).
(2)
Predominantly comprised of the non-current portion of deferred revenue, non-current reclamation obligations, and deferred income tax liabilities.
 
 
 
 
 
 3
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
SELECTED QUARTERLY FINANCIAL INFORMATION
 
 
 
 
 
2024
 
2024
 
2024
 
2023
(in thousands, except for per share amounts)
 
Q3
 
Q2
 
Q1
 
Q4
 
 
 
 
 
 
 
 
 
 
 
Continuing Operations:
 
 
 
 
 
 
 
 
 
 
Total revenues
$
 695
  $
1,326
  $
832
$
1,092
Net (loss) earnings
$
 (25,767)
  $
(16,441)
  $
(19,880)
$
34,627
Basic and diluted (loss) earnings per share
$
 (0.03)
  $
(0.02)
  $
(0.02)
$
0.04
 
 
 
 
 
 
 
 
 
Discontinued Operations:
 
 
 
 
 
 
 
 
Net earnings (loss)
$
-
  $
471
  $
-
$
(150)
Basic and diluted earnings (loss) per share
$
-
  $
0.00
  $
-
$
(0.00)
 
 
 
 
2023
 
2023
 
2023
 
2022
(in thousands, except for per share amounts)
 
Q3
 
Q2
 
Q1
 
Q4
 
 
 
 
 
 
 
 
 
 
 
Continuing Operations:
 
 
 
 
 
 
 
 
Total revenues
$
777
  $
968
  $
(982)
$
1,015
Net earnings (loss)
$
57,916
  $
(345)
  $
(2,834)
$
(6,247)
Basic and diluted earnings (loss) per share
$
0.07
  $
(0.00)
  $
(0.00)
$
(0.01)
 
 
 
 
 
 
 
 
 
Discontinued Operations:
 
 
 
 
 
 
 
 
Net earnings
$
321
  $
406
  $
434
$
506
Basic and diluted earnings per share
$
0.00
  $
0.00
  $
0.00
$
0.00
 
Significant items causing variations in quarterly results
 
The Company’s revenues are based on a draw-down of deferred toll milling revenue, the rate of which fluctuates due to the timing of uranium processing at the McClean Lake mill, as well as changes to the estimated mineral resources of the Cigar Lake mine. The rate of draw-down for the toll milling deferred revenue was updated for changes to expected future toll milling production rates at McClean Lake in the first quarter of 2023. This update resulted in negative revenue, which is uncommon. See RESULTS OF OPERATIONS below for further details.
Exploration expenses are generally largest in the first and third quarters due to the timing of the winter and summer exploration seasons in northern Saskatchewan.
Evaluation expenses have been increasing over the past eight quarters as the Company advances towards a FID for Phoenix.
Other income and expense fluctuate due to changes in the fair value of the Company’s portfolio investments, convertible debentures, and uranium investments, all of which are recorded at fair value through profit or loss and are subject to fluctuations in the underlying share and commodity prices. The Company’s uranium investments are also subject to fluctuations in the US dollar to Canadian dollar exchange rate. The impact of fair value changes on the Company’s net earnings / loss was particularly significant in the second, third and fourth quarters of 2023. See OTHER INCOME below for more details.
The Company’s results are also impacted, from time to time, by other non-recurring events arising from its ongoing activities, as discussed below, where applicable.
 
 
RESULTS OF CONTINUING OPERATIONS
 
REVENUES
 
McClean Lake Uranium Mill
 
McClean Lake is located on the eastern edge of the Athabasca Basin in northern Saskatchewan, approximately 750 kilometres north of Saskatoon. Denison holds a 22.5% ownership interest in the MLJV and the McClean Lake uranium mill, one of the world’s largest uranium processing facilities, which is contracted to process ore from the Cigar Lake mine under a toll milling agreement. The MLJV is a joint venture between Orano Canada, with a 77.5% interest, and Denison, with a 22.5% interest.
 
 
 4
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
In February 2017, Denison closed an arrangement with Ecora Resources PLC (‘Ecora’, then known as Anglo Pacific Group PLC) and one of its wholly owned subsidiaries (the ‘Ecora Arrangement’) under which Denison received an upfront payment of $43,500,000 in exchange for its right to receive future toll milling cash receipts from the MLJV under the then current toll milling agreement with the Cigar Lake Joint Venture (‘CLJV’) from July 1, 2016 onwards. The Ecora Arrangement consists of certain contractual obligations of Denison to forward to Ecora the cash proceeds of future toll milling revenue earned by the Company related to the processing of the specified Cigar Lake ore through the McClean Lake mill and, as such, the upfront payment was accounted for as deferred revenue.
 
During the three and nine months ended September 30, 2024, the McClean Lake mill processed 2.7 million and 12.2 million pounds U3O8, respectively, for the CLJV (September 30, 2023 – 2.7 million and 10.3 million pounds U3O8) and Denison recorded toll milling revenue of $695,000 and $2,853,000, respectively (September 30, 2023 – $777,000 and $763,000). The increase in toll milling revenue during the nine months ended September 30, 2024, as compared to the prior year, is due to both the increase in production in the current year-to-date period as well as a $1,946,000 negative non-cash cumulative accounting adjustment that was recorded in the prior year. In the first quarter of 2022, the operators of the Cigar Lake mine announced a reduction in forecasted mine production from 18 million pounds U3O3 per year to 15 million pounds U3O8 per year in 2022 and 2023, and then to 13.5 million pounds U3O3 per year thereafter. In the first quarter of 2023, the operators of the Cigar Lake mine announced that forecasted future mine production was increased back to 18 million pounds U3O3 per year. Under IFRS 15, Revenue from Contracts with Customers, the change in the estimated timing of the toll milling of the CLJV ores in 2022 resulted in an increase to the implied financing component of the toll milling transaction, thus increasing the total deferred revenue to be recognized over the life of the toll milling contract as well as the deferred revenue draw-down rate. The updated draw-down rate was applied retrospectively to all pounds produced for the CLJV since the inception of the Ecora Arrangement in July 2016, resulting in an increase in revenue in the first quarter of 2022, which was effectively reversed in the first quarter of 2023, resulting in the reduction in revenue.
 
During the three and nine months ended September 30, 2024, the Company also recorded accounting accretion expense of $749,000 and $2,310,000, respectively, on the toll milling deferred revenue balance (September 30, 2023 – $725,000 and $2,726,000). Generally, the annual accretion expense will decrease over the life of the contract as the deferred revenue liability decreases over time. During the nine months ended September 30, 2024, the decrease in accretion expense, as compared to the prior year, was predominantly due to a $483,000 true up recognized in the prior year to increase the life-to-date accretion expense due to the change in the timing in the estimated CLJV toll milling activities discussed above. During the nine months ended September 30, 2024, a true-up of only $63,000 was recorded as a result of the update to the Cigar Lake mineral resource estimate.
 
The impact of the current and prior period true-ups to revenue and accretion are non-cash.
 
OPERATING EXPENSES
 
Mining
 
Operating expenses of the mining segment include depreciation and development costs, costs relating to Denison’s legacy mine sites in Elliot Lake, as well as cost of sales related to the sale of uranium, when applicable. Operating expenses in the three and nine months ended September 30, 2024, were $1,030,000 and $3,617,000, respectively (September 30, 2023 – $797,000 and $2,567,000).
 
Included in operating expenses for the three and nine months ended September 30, 2024, is depreciation expense relating to the McClean Lake mill of $435,000 and $1,928,000, respectively (September 30, 2023 – $422,000 and $1,689,000), as a result of processing 2.7 million and 12.2 million pounds U3O8 for the CLJV in the applicable periods (September 30, 2023 – 2.7 million and 10.3 million pounds U3O8). Also included in operating expenses are costs related to the Company’s Elliot Lake legacy mine sites of $358,000 and $1,048,000, respectively (September 30, 2023 – $242,000 and $533,000), and development costs of the MLJV and other operating costs of $236,000 and $640,000, respectively (September 30, 2023 – $133,000 and $345,000).
 
During the first quarter of 2024, the MLJV began planning work for the 2024 SABRE program, the goal of which is to prepare the McClean North site for the commencement of SABRE mining activities in 2025. The site work commenced during the second quarter of 2024. Work completed to date includes the completion of the SABRE pad, the commencement of drilling of the access holes, and procurement activities. During the three and nine months ended September 30, 2024, the company capitalized its share of development and equipment cost of $987,000 and $1,184,000, respectively, related to the advancement of the SABRE program.
 
MINERAL PROPERTY EVALUATION
 
During the three and nine months ended September 30, 2024, Denison’s share of evaluation expenditures was $8,577,000 and $20,986,000, respectively (September 30, 2023 – $5,217,000 and $12,601,000).
 
 
 5
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
The increase in evaluation expenditures, compared to the prior period, was primarily due to the continuation and acceleration of project engineering activities associated with the Phoenix detailed design engineering phase, as well as an increase in staffing levels to support the advancement of the Company’s various evaluation projects.
 
The following table summarizes the evaluation activities completed during the nine months ended September 30, 2024.
 
PROJECT EVALUATION ACTIVITIES
Property
Denison’s ownership
Evaluation activities
Wheeler River
95%(1)
 
Engineering, detailed design, metallurgical testing, Feasibility Field Test (‘FFT’) decommissioning, 2024 field program activities, environmental and sustainability activities, and EIS regulatory reviews.
 
Waterbury Lake
69.44%(2)
 
2024 field activities and progression of the PFS for the THT deposit.
 
 
Midwest
25.17%
2024 inaugural ISR field test activities, and progression of the Preliminary Economic Assessment (‘PEA’) report.
 
Kindersley Lithium Project (‘KLP’)
Earn-in(3)
Project planning for 2024 activities, commencement of field programs and commencement of the PFS for the KLP project.
 
   
 
 
 
Notes
(1)
The Company’s effective ownership interest as at September 30, 2024, including the indirect 5% ownership interest held through JCU.
(2)
Represents Denison’s ownership position as at June 30, 2024.
(3)
Pursuant to an earn-in agreement executed in January 2024, Denison can earn up to a 75% interest in the KLP through a series of options exercisable with direct payments and work expenditures. As at September 30, 2024, Denison has not yet vested an ownership interest in the project.
 
Wheeler River Uranium Project
 
On June 26, 2023, Denison announced the results of (i) the Phoenix FS completed for ISR mining of the high-grade Phoenix deposit and (ii) an updated Gryphon PFS for conventional underground mining of the basement-hosted Gryphon deposit.
 
The Phoenix FS was completed by Wood, WSP USA Environment and Infrastructure Inc., SRK Consulting (Canada) Inc., and Newmans Geotechnique Inc. The study confirms robust economics and the technical viability of an ISR uranium mining operation with low initial capital costs and a high rate of return.
 
The Phoenix FS reflects several design changes and the results of a rigorous technical de-risking program completed by Denison over the 4.5 years following the publication of the 2018 PFS, which was highlighted by the then-novel selection of the ISR mining method for Phoenix.
 
With the benefit of extensive lab and field testing of all key elements of the proposed ISR mining operation, and 2023 cost estimates reflecting recent inflationary pressures, the Phoenix FS is expected to provide an excellent basis to advance engineering designs in support of an FID.
 
 
 
 
 6
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 

See the following tables for the highlights of the Phoenix FS.
 
Summary of Economic Results (100% Basis) – Base Case
Uranium selling price
UxC Spot Price(1)
(~US$66 to US$70/lb U3O8)
 
Exchange Rate (US$:CAD$)
1.35
Discount Rate
8%
Operating profit margin(2)
90.9%
 
 
Pre-tax NPV8%(3) (Change from 2018 PFS)(4)
$2.34 billion (+150%)
Pre-tax IRR(3)
105.9%
Pre-tax payback period(5)
~10 months
 
 
Post-tax NPV8%(3)
$1.43 billion
Post-tax IRR(3)
82.3%
Post-tax payback period(5)
~11 months
 
 
Adjusted Post-tax NPV8%(3)(6)
$1.56 billion
Adjusted Post-tax IRR(3)(6)
90.0%
Adjusted Post-tax payback period(3)(6)
~10 months
 Notes
(1)
Spot price forecast is based on “Composite Midpoint” scenario from UxC’s UMO (defined below) and is stated in constant (not-inflated) dollars. See Denison news releases dated June 26, 2023 and August 9, 2023 and the Wheeler Technical Report (defined below) for details.
(2)
Operating profit margin is calculated as aggregate uranium revenue less aggregate operating costs, divided by aggregate uranium revenue. Operating costs exclude all royalties, surcharges and income taxes.
(3)
NPV and IRR are calculated to the start of construction activities for the Phoenix operation and excludes $67.4 million in pre-FID expenditures.
(4)
Change from 2018 PFS is computed by reference to the same scenario from the 2018 PFS, adjusted to incorporate certain pre-FID costs for consistent comparability.
(5)
Payback period is stated as number of months to payback from the start of uranium production.
(6)
The Adjusted Post-tax NPV, IRR and payback period are based on the “adjusted post-tax” scenario, which includes the benefit of certain entity level tax attributes which are expected to be available and used to reduce taxable income from the Phoenix operation. See Denison news release dated June 26, 2023 and the Wheeler Technical Report (defined below) for details.
 
Summary of Key Phoenix Operational Parameters (100% basis)
Mine life
10 years
Proven & Probable reserves(1)
56.7 million lbs U3O8 (219,000 tonnes at 11.7% U3O8)
First 5 years of reserves(2)
41.9 million lbs U3O8 (Average 8.4 million lbs U3O8 / year)
Remaining years of reserves
14.8 million lbs U3O8 (Average 3.0 million lbs U3O8 / year)
Initial capital costs(3)
$419.4 million
Average cash operating costs
$8.51 (US$6.28) per lb U3O8
All-in cost(4)
$21.73 (US$16.04) per lb U3O8
Notes
(1)
See Denison press release dated June 26, 2023 for additional details regarding Proven & Probable reserves.
(2)
The first five years is determined by reference to the 60-month period that commences at the start of operations.
(3)
Initial capital costs exclude $67.4 million in estimated pre-FID expenditures expected to be incurred before the project’s FID has been made.
(4)
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8 to be produced.
 
The Gryphon Update was prepared by Engcomp Engineering and Computing Professionals Inc., SLR International Corporation, Stantec Consulting Ltd., and Hatch Ltd., and is largely based on the 2018 PFS, with efforts targeted at the review and update of capital and operating costs, as well as various minor scheduling and design optimizations. The study remains at the PFS level of confidence.
 
Overall, the Gryphon Update demonstrates that the underground development of Gryphon is a positive potential future use of cash flows generated from Phoenix, as it can leverage existing infrastructure to provide an additional source of low-cost production.
 
 
 
 
 7
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
See the following tables for the highlights of the Gryphon Update.
 
Summary of Economic Results (100% Basis) – Base Case
Uranium selling price
US$75/lb U3O8(1)
(Fixed selling price)
Exchange Rate (US$:CAD$)
1.35
Discount Rate
8%
Operating profit margin(3)
83.0%
 
 
Pre-tax NPV8%(3) (Change from 2018 PFS)(4)
$1.43 billion (+148%)
Pre-tax IRR(3)
41.4%
Pre-tax payback period(5)
~ 20 months
 
 
Post-tax NPV8%(3)(6)
$864.2 million
Post-tax IRR(3)(6)
37.6%
Post-tax payback period(5)(6)
~ 22 months
  Notes
(1)
Fixed selling price is based on the forecasted annual “Composite Midpoint” long-term uranium price from UxC’s Q2’2023 UMO (defined below) and is stated in constant (not-inflated) dollars. See Denison news releases dated June 26, 2023 and August 9, 2023, and the Wheeler Technical Report (defined below) for details.
(2)
Operating profit margin is calculated as aggregate uranium revenue less aggregate operating costs, divided by aggregate uranium revenue. Operating costs exclude all royalties, surcharges and income taxes.
(3)
NPV and IRR are calculated to the start of construction activities for the Gryphon operation, and excludes $56.5 million in pre-FID expenditures.
(4)
Change from 2018 PFS is computed by reference to the same scenario from the 2018 PFS, adjusted to incorporate certain pre-FID costs for consistent comparability.
(5)
Payback period is stated as number of months to payback from the start of uranium production.
(6)
There is no “adjusted” post-tax case for Gryphon, given that the entity level tax attributes of the Wheeler River Joint Venture owners are assumed to have been fully depleted by the Phoenix operation. See Denison news release dated June 26, 2023 and the Wheeler Technical Report (defined below) for details.
 
Summary of Key Gryphon Operational Parameters (100% basis)
Mine life
6.5 years
Probable reserves(1)
49.7 million lbs U3O8 (1,257,000 tonnes at 1.8% U3O8)
Average annual production
7.6 million lbs U3O8
Initial capital costs(2)
$737.4 million
Average cash operating costs
$17.27 (US$12.75) per lb U3O8
All-in cost(3)
$34.50 (US$25.47) per lb U3O8
Notes
(1)
See Denison press release dated June 26, 2023 for additional details regarding Probable reserves.
(2)
Initial capital costs exclude $56.5 million in estimated pre-FID expenditures expected to be incurred before an FID has been made.
(3)
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8 to be produced.
 
Further details regarding Wheeler River, including the estimated mineral reserves and resources for Phoenix and Gryphon, are provided in the Technical Report for the Wheeler River project titled ‘NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada’ with an effective date of June 23, 2023 (‘Wheeler Technical Report’). A copy of the Wheeler Technical Report is available on Denison’s website and under its profile on each of SEDAR+ and EDGAR.
 
 
 
 8
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
The location of the Wheeler River property, as well as the Phoenix and Gryphon deposits, and existing and proposed infrastructure, is shown on the map provided below.
 
 
Evaluation Program
 
Denison’s 2024 evaluation plans for Wheeler River include: (1) advancing detailed design engineering and long-lead procurement, (2) finalizing the EIS through both federal and provincial processes, (3) completing the required program documents to support licensing and permitting approval on the construction of the proposed Phoenix ISR operation, (4) advancing negotiation of additional impact benefit type agreements with interested parties, (5) planning and executing field program optimization studies to finalize the selection of permeability enhancement technologies and drilling methodology; and (6) completing the final decommissioning activities of the FFT.
 
During the three and nine months ended September 30, 2024, Denison’s share of evaluation costs at Wheeler River was $7,597,000 and $18,875,000, respectively (September 30, 2023 – $4,420,000 and $10,728,000).
 
Engineering Activities
 
Feasibility Field Test
 
The FFT was designed to use the commercial-scale ISR test pattern installed at Phoenix in 2021 to facilitate a combined evaluation of the Phoenix deposit's hydraulic flow properties with the leaching characteristics that were previously assessed through the metallurgical core-leach testing program.
 
 
 9
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
The successful completion of the leaching and neutralization phases of the FFT in the fourth quarter of 2022 provided further verification of the permeability, leachability, reclamation, and containment parameters needed for the successful application of the ISR mining method at the Phoenix deposit.
 
The final stage of the FFT, the recovered solution management phase, was completed in 2023 and involved treating the solutions recovered in 2022 during the leaching and neutralization phases. A total of 560 cubic metres of recovered solution was successfully processed into (i) treated effluent and (ii) a mineralized precipitate, which contains an estimated 99.99% of the 14,400 pounds U3O8 previously estimated to be dissolved in the recovered solution. The treated effluent was tested to ensure compliance with permit conditions and was then injected into the mineralized zone. The mineralized precipitate will be stored on surface at site and will be monitored in further care and maintenance activities. The results of this phase of the FFT validate the Company’s processing designs and assumptions for the future Phoenix processing plant.
 
Following the completion of the recovered solution management phase in late 2023, Denison initiated the decommissioning of the FFT facilities in accordance with its permit conditions. Decommissioning involves the cleaning, deconstruction, and shipment off-site of equipment used during the leaching, neutralization, and solution management phases.
 
During the second quarter of 2024, project planning and procurement for the decommissioning phase was completed, and substantially all key decommissioning activities and scopes were carried out and completed in the third quarter.
 
Metallurgical Testing
 
During the third quarter of 2024, the metallurgical test program continued at Saskatchewan Research Council Laboratories (‘SRC’) in Saskatoon, including post-leach analysis on the most recently completed core leach test sample, as well as the completion of the effluent treatment test work and leaching and settling test work on the process precipitate solids. In addition, the Company commenced an evaluation of available technology for the potential concentration of low-grade uranium-bearing solution, with further testing planned in the fourth quarter based on the results of from the initial test program.
 
Front End Engineering Design (‘FEED’)
 
The FEED phase was initiated for Phoenix in early 2023 and was concluded upon the initiation of the detailed design engineering phase in January 2024.
 
Detailed Design Engineering
 
The detailed design engineering phase includes work related to the process plant, freeze plant, electrical substation & distribution, integration of wellfield surface facilities, ponds/pads, site earthworks (including the access road to site), air strip and road design, civil piping (including firewater), overall site layout with modular building design and integration.
 
The engineering activities required to construct and commission the proposed Phoenix operation are advancing within expected timelines to support a FID by mid-2025. Total engineering completion at end of the third quarter was 45% supported by finalization of process design, P&ID’s, and HAZOPs, as well as the selection of major process equipment and electrical distribution infrastructure.
 
The work packages completed to date have been able to confirm the FS design with no major deviations from plans made in prior engineering studies. Detailed engineering deliverables continue to advance within each of the core engineering disciplines (process, mechanical, civil, structural, electrical and instrumentation) showing significant advancement in principal engineering documents including design criteria, specifications, general arrangements, equipment lists, data sheets, P&ID’s, block diagrams, and control narratives.
 
Field Program
 
The field drilling program at Phoenix commenced in the third quarter of 2024. The program was designed to optimize the deployment of specific permeability enhancement techniques, confirm installation methodology of subsurface freeze drilling equipment and materials, as well as to confirm monitoring well design and sampling methodology. During the third quarter of 2024, two freeze holes and one injection well were completed in Phases 1 and 2 at Phoenix, respectively. Test work was completed to optimize the use of permeability enhancement techniques, and additional hydrogeological test work was performed. The planned field program activities are expected to be completed in the fourth quarter of 2024.
 
 
 
 
10
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
Long Lead Procurement
 
During the first nine months of 2024, procurement activities ramped up with the initiation of the procurement process for 17 long lead items including: the finished goods packing system, thickeners and clarifiers, sand filters, centrifuges, product dryer and scrubber, freeze plant, electrical substation and distribution equipment, medium voltage back-up diesel generators, potable water and sewage treatment systems, and the ISR wellfield header houses.
 
As of September 30, 2024, the Project has $11,100,000 in committed capital purchases.
 
Construction Planning
 
Early construction planning, including engagement with key northern business partners, continues to progress. The engineering team is currently developing execution schedules and detailed construction methodologies for each key scope of work.
 
Environmental and Sustainability Activities
 
Environmental Assessment (‘EA’) Activities
 
Throughout 2024, the Company continued to support the advancement of the Canadian Nuclear Safety Commission’s (‘CNSC’) ongoing review of the draft Environmental Impact Statement (‘EIS’) submitted for the project in October 2022. Following the June 2024 submission of a third round of responses to information requests (‘IRs’) from the Federal Indigenous Review Team (‘FIRT’), Denison has been in regular contact with CNSC staff to support the conclusion of any remaining IRs.
 
In September 2024, Denison received confirmation that the majority of outstanding IRs have been resolved, which suggests that the Federal review process is nearing completion.
 
The Company’s objective has been to submit substantially the same version of the EIS to both the federal and provincial authorities. Given the positive progress of the Federal EA review process, the Company submitted the final Provincial EIS to the Saskatchewan Ministry of Environment (‘MOE’) in the third quarter of 2024. 
 
Licensing Activities
 
Denison has submitted substantially all of the program and design documents required to obtain a site preparation and construction license from the CNSC. The CNSC has completed its initial review of the documents and have determined the majority of technical application requirements have been met, which is expected to allow for the project to advance to a licensing hearing and subsequent license issuance by the CNSC. A Commission hearing for the project is expected to be scheduled once the EIS is accepted for final submission by CNSC staff.
 
Community Engagement Activities
 
As part of ongoing engagement activities, Denison carried out community meetings with Indigenous and non-Indigenous interested parties in March, May, and June of 2024. Notably, Denison undertook an in-person community tour in the Athabasca Basin region of northern Saskatchewan in collaboration with the Ya’thi Nene Lands and Resources Office (‘YNLRO’), which represents the seven Athabasca Basin communities of Hatchet Lake Denesułiné First Nation, Black Lake Denesułiné First Nation, Fond du Lac Denesułiné First Nation and the municipalities of Stony Rapids, Uranium City, Wollaston Lake, and Camsell Portage.
 
In early July 2024, Denison announced that it had signed an MBA with KML and a CBA with Pinehouse, each in support of the development and operation of the Wheeler River Project.
 
The MBA acknowledges that the project is located within KML’s Land and Occupancy Area and provides KML’s consent and support to advance the project. Additionally, the MBA outlines a shared recognition that the successful advancement of the project can support KML in advancing its aspirations for the successful social and economic development of KML while mitigating the risk of impacts on the local environment and KML members.
 
The CBA acknowledges that Pinehouse is the closest residential community to the project by road, which relies on much of the same regional infrastructure that Denison will use as it advances the project. Pursuant to the terms of the CBA, Pinehouse has provided its consent and support for the project. Denison’s commitments in the CBA are intended to help Pinehouse develop its own capacity to take advantage of economic and other development opportunities in connection with the advancement and operation of the project. The commitments in the CBA aim to create a long-lasting positive legacy that continues beyond the project’s lifespan.
 
 
 
 11
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
Additionally, in March 2024, Denison signed a Sustainable Communities Investment Agreement with the municipalities of the Northern Village of Beauval, the Northern Village of Île-à-la Crosse, the Northern Hamlet of Jans Bay, and the Northern Hamlet of Cole Bay. This agreement acknowledges that the municipalities have a desire to work together to develop a regional approach that enables social, economic, and cultural revitalization, in which Denison can play a supporting role. An important outcome of this agreement is the support and consent of these four municipalities for the Wheeler River project.
 
During the third quarter of 2024, Denison began planning for further engagement activities expected to occur with numerous communities starting in early 2025 in advance of the Commission hearings, which are anticipated to be scheduled once the final EIS is filed with the CNSC.
 
Evaluation Pipeline Properties
 
Waterbury Lake
 
In 2020, an independent PEA was completed for Waterbury, which evaluated the potential use of the ISR mining method at the THT deposit. Further details regarding Waterbury, including the estimated mineral resources, are provided in the Technical Report for Waterbury titled ‘Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada’ with an effective date of October 30, 2020, a copy of which is available on Denison’s website and under its profile on each of SEDAR+ and EDGAR.
 
Denison’s 2023 evaluation activities at Waterbury were designed to build upon the 2020 PEA and were highlighted by an ISR field program consisting of the installation of the first ISR test wells at THT, the completion of pump and injection testing, permeameter data collection, hydrogeological logging, metallurgical sampling, geological logging, as well as an ion tracer test.
 
The 2023 THT ISR field program successfully achieved each of its planned objectives: (i) validation of hydraulic conductivity in 100% of the test well within the ore zone and achieving hydraulic conductivity values consistent with the 2020 PEA; (ii) the establishment of a 10-hour breakthrough time with an ion tracer test, demonstrating the ability to maintain hydraulic control of injected solutions and achieve breakthrough times consistent with expectations; and, (iii) demonstration of the effectiveness of permeability enhancement.
 
In 2024, Denison’s evaluation plans for Waterbury were designed to complete: (1) metallurgical test work on core retrieved during the 2023 field program, (2) additional pump and injection tests on the installed ISR test wells to validate year-over-year hydrogeological test results, and (3) collection of key components of environmental baseline data.
 
During the first half of 2024, work included planning activities and the procurement of long-lead time materials for the 2024 field program, updates to engineering design activities and assessments, evaluating the THT resource model from the 2020 PEA, and continuation of the metallurgical test program.
 
The 2024 field test program was completed in the third quarter of 2024. During the program, two small-diameter test wells, installed in the THT east pod, as part of the 2023 drill program, were re-entered. The wells were retrofitted to their target depths and, outfitted with well screens and/or pressure monitoring devices as applicable, in order to facilitate additional hydrogeological and geophysical testing. Additionally, core samples were retrieved from the site for extensive density analysis, which will inform a planned update to the mineral resource estimate.
 
During the third quarter of 2024, metallurgical test work also advanced, including the completion of an intact core leach and remediation test. The core has been taken offline for post-leach characterization and recovery reconciliation. THT column leach and remediation test work was also completed and will be incorporated into a potential future PFS. All metallurgical test work was conducted at SRC facilities in Saskatoon.
 
The results of the metallurgical test work, the ISR field program, and the engineering studies and assessments are expected to support the completion of a potential future PFS.
 
In addition, to support future potential regulatory / permitting processes for THT, engagement activities were undertaken in June 2024 in the Athabasca Basin region of northern Saskatchewan in collaboration with the Ya’thi Nene Lands and Resources Office (‘YNLRO’), who represent the seven Athabasca Basin communities of Hatchet Lake Denesułiné First Nation, Black Lake Denesułiné First Nation, Fond du Lac Denesułiné First Nation and the municipalities of Stony Rapids, Uranium City, Wollaston Lake, and Camsell Portage.
 
 
 
 12
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
Midwest
 
The MWJV is operated by Orano Canada and is host to the high-grade Midwest Main and Midwest A uranium deposits, which lie along strike and within six kilometres of the THT and Huskie deposits on Denison’s 69.44% owned Waterbury Lake project. The Midwest and Waterbury deposits are all located in close proximity to existing uranium mining and milling infrastructure including provincial highways, powerlines, and Denison’s 22.5% owned McClean Lake mill.
 
A Concept Study evaluating the potential application of the ISR mining method at Midwest was prepared by Denison during 2022 and was formally issued to the MWJV in early 2023. Based on the positive results of the Concept Study, the MWJV provided Denison with approval to complete additional ISR-related evaluation work for Midwest.
 
In 2024, the evaluation plans for Midwest were designed to include an inaugural ISR field test program, intended to validate various characteristics of the Midwest Main deposit, and to collect a database of geotechnical, hydrogeological, and metallurgical data to further evaluate the ISR mining conditions present at the Midwest Main deposit.
 
The ISR field test program was completed in the second quarter of 2024. Ten small-diameter test wells were installed within the Midwest Main deposit – including a four-well test pattern and six individual wells to test specific areas of the deposit for various characteristics. The test pattern included one injection well, one extraction well, a recharge well, and a monitoring well outfitted with a multi-channel vibrating wire piezometer. The six additional wells were drilled to their target depths and, as applicable, outfitted with well screens and/or pressure monitoring devices to facilitate broader hydrogeological testing. All wells were decommissioned at the conclusion of the program consistent with regulatory commitments.
 
Highlights from the program include the following:
 
Confirmed Hydraulic Conductivity: Pump and injection tests validated hydraulic connectivity in the test wells within the mineralized zone and achieved hydraulic conductivity values (a measure of permeability) consistent with the Concept Study. Sufficient permeability within the mineralized zone is a key criterion for the successful deployment of the ISR mining method.
 
Demonstrated the Effectiveness of Permeability Enhancement: One method of permeability enhancement was successfully deployed within two wells, demonstrating the suitability of the method to the Midwest Main deposit. The efficiency of permeability enhancement was verified by comparison of pre- and post-permeability enhancement hydraulic testing.
 
Metallurgical Samples Defined and Collected for Leaching Characteristics: Core samples representative of the Midwest deposit were collected during the program for use in future metallurgical tests to determine the leaching characteristics.
 
The field program results, along with further technical studies, are expected to be used to advance the de-risking of the ISR mining requirements to further the evaluation of the ISR mining method for the property, the results of which are anticipated to be summarized through the preparation of a PEA.
 
Additionally, analysis of core collected during the drilling program successfully confirmed the location and grade of mineralization within the Midwest Main deposit. The results are expected to be used to update the mineral resource estimate and provide a basis for future evaluations of mineral extraction by both ISR and the SABRE mining method. Certain core samples are also being analyzed to support future mineral processing assessments.
 
Kindersley Lithium Project
 
In January 2024, Denison entered into an agreement with Grounded Lithium with respect to the KLP in Saskatchewan. The agreement includes a series of earn-in options, with the exercise of each earn-in option completed by way of a cash payment to Grounded Lithium as well as required work expenditures to advance the KLP.
 
In September 2024, Denison finalized a $4.5 million program and budget for the advancement of KLP through a robust process of technical de-risking, which is expected to conclude with the potential completion of a PFS by mid-2025. Activities in 2024 are expected to include: (1) the collection of formation specific field information, including the flow and concentration of various horizons of the Duperow formation, as well as, collection of fresh brine for lab-based test work; (2) the initiation of a comprehensive lab-scale metallurgical test program on available DLE technology and testing on downstream processes; (3) the development of a process simulation model for lithium processing; and (4) the commencement of technical assessments required for inclusion in a future PFS.
 
 
 
 13
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
In early November 2024, the Company and Grounded Lithium kicked off the 2024 field program with the re-entry of a previously completed lithium well that is expected to be used to conduct hydrological investigations and brine collection.
 
Additionally, global engineering and consulting firm Stantec Inc. (“Stantec”) was selected as lead author for a future PFS.
 
The above noted program for KLP is planned to continue into 2025. 
 
MINERAL PROPERTY EXPLORATION
 
During the three and nine months ended September 30, 2024, Denison’s share of exploration expenditures was $2,834,000 and $10,002,000, respectively (September 30, 2023 – $2,052,000 and $7,833,000). Spending in the current quarter and nine months ended September 30, 2024, was higher than the prior year primarily due to an increase in winter and summer exploration activities.
 
Exploration spending in the Athabasca Basin is generally seasonal in nature, with spending typically higher during the winter exploration season (January to mid-April) and summer exploration season (June to mid-October).
 
The following table summarizes the 2024 exploration activities, some of which were completed in early October 2024. For exploration expenditures reported in this MD&A, all amounts are reported for the three and nine months ended September 30, 2024.
 
EXPLORATION ACTIVITIES
Property
Denison’s ownership
Drilling in metres (m)(1)
Other activities
Crawford Lake
100.00%
1,128 (2 holes)
Geophysical Survey
Hatchet Lake
70.15%(2)
884 (4 holes)
-
Johnston Lake
100.00%
6,228 (8 holes)
Geophysical Survey
Moon Lake South
75.00%
7,383 (11 holes)
Geophysical Survey
Wheeler River
95.00%(3)
6,666 (12 holes)
-
Waterfound
24.68%(4)
8,652 (14 holes)
Geophysical Survey
 
 
 
 
     Total
 
30,941 (51 holes)
 
 
(1)
The Company reports total exploration metres drilled and the number of holes that were successfully completed to their target depth.
(2)
Denison’s effective ownership interest as at September 30, 2024. Subsequent to quarter end, Foremost completed the first phase of its earn-in under the option agreement for the Foremost Transaction, pursuant to which the Company’s ownership interest in Hatchet Lake decreased to 56.12%.
(3)
Denison’s effective ownership interest as at September 30, 2024, including an indirect 5.0% ownership interest held through Denison’s 50% ownership of JCU.
(4)
Denison’s effective ownership interest as at September 30, 2024, including an indirect 12.90% ownership interest held through Denison’s 50% ownership of JCU.
The Company’s land position in the Athabasca Basin, as of September 30, 2024, is illustrated in the figure below. The Company’s Athabasca land package remained unchanged in the third quarter of 2024, consisting of 383,861 hectares (227 claims). The land position reported by the Company excludes the land positions held by JCU. Subsequent to the end of the third quarter, the Company completed the transfer of the operatorship of 10 non-core properties to Foremost, as part of the earn-in agreement.
 
 
 
 
 
 
 
 
 14
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
  
 
Wheeler River Exploration
 
Denison’s share of exploration costs at Wheeler River during the three and nine months ended September 30, 2024 was $16,000 and $1,962,000 (September 30, 2023 – $259,000 and $1,554,000).
 
The 2024 Wheeler River winter exploration drilling program was initiated in mid-January and was completed in early April. A total of 6,666 metres were drilled in 12 holes. The focus of the 2024 winter drill program was to identify an ISR-amenable unconformity-associated uranium deposit proximal to the proposed Phoenix infrastructure. The drill program was focused on two key areas: (1) the N Zone, located approximately four kilometres northeast of Phoenix, and (2) the RE/RW area, an underexplored, northeast-striking conductive trend that runs between the Phoenix and Gryphon deposits. Additionally, one drill hole was completed at M Zone to test the up-dip extension of a graphitic semi-brittle fault intersected during the 2020 drill program. Results are reported using preliminary radiometric equivalent grades (‘eU3O8’), which are assessed by downhole probing during active drill programs (see ‘ASSAY PROCEDURES AND DATA VERIFICATION’ for additional details).
 
At the N Zone, 1,602 metres were drilled in three diamond drill holes. The drill holes were designed to test conductive anomalies identified from the 2023 N Zone Stepwise Moving Loop Electromagnetic (‘SWML EM’) survey. Elevated radioactivity measuring three to four times background was reported in each hole; however, no mineralization above a minimum cutoff of 0.05% eU3O8 was observed.
 
Eight holes totalling 4,554 metres were drilled in the RE/RW area between Phoenix and Gryphon. Drilling in this area targeted conductive anomalies coincident with resistivity low anomalies identified from previous geophysical surveys, and also tested areas where previous drilling was determined to have identified anomalous structure, alteration, or geochemical enrichment that remained open when projected to the unconformity contact. While elevated radioactivity was observed in each hole, no mineralization above a minimum cutoff of 0.05% eU3O8 was reported.
 
Significant structural disruption was observed in several holes completed during the program, most notably in hole WR-823, which intersected intense structural disruption and associated core loss in the basal sandstone, interpreted to represent the sandstone expression of brittle reactivation along a graphitic fault observed in historical hole WR-483. Elevated uranium and elevated base metal concentrations were returned from systematic samples collected within and below the fault zone.
 
 
 
 15
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
 
The best geochemical results from the RE/RW drilling were returned from WR-826, which was drilled approximately 1.7 km west-northwest of Phoenix Zone A to follow up anomalous boron values and indicative structure in historical drill hole ZR-14. WR-826 returned polymetallic enrichment along the upper contact of a semibrittle graphitic fault, intersected approximately 14 m below the unconformity, highlighted by 173 ppm uranium, 203 ppm nickel, and 19.4 ppm cobalt. Additionally, lead isotope analysis of several spot samples collected from the basement of WR-826 indicates that the lead present in the samples is strongly radiogenic, suggesting that a significant component of the lead analyzed from the samples is likely to be the result of radioactive decay from uranium to lead. The radiogenic nature of lead samples returned from WR-826, along with the uranium and base metal enrichment returned from the basal sandstone of WR-823, highlight the prospectivity of this trend.
 
One hole was drilled at M Zone to test the unconformity subcrop of a graphitic semi-brittle fault intersected at depth in 2020 drill hole WR-777. The follow-up hole did not intersect significant structure, alteration, or elevated radioactivity associated with the unconformity contact.
 
The location of the 2024 drill holes is depicted in the figure below.
 
 
No additional exploration field work took place in the second or third quarters of 2024.
 
 
 
 
 16
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 

Exploration Pipeline Properties
 
During the first nine months of 2024, exploration field programs were carried out at five of Denison’s pipeline properties (three operated by Denison). Denison’s share of exploration costs for these properties was $2,380,000 and $7,398,000, respectively, for the three and nine months ended September 30, 2024 (September 30, 2023 – $1,665,000 and $6,025,000).
 
The Company continues to review, prioritize, and rationalize its Athabasca Basin exploration portfolio to continue exploring its highest priority-projects, with the potential to deliver significant and meaningful new discoveries.
 
Crawford Lake
 
The Crawford Lake property is located adjacent to the southwestern portion of the Wheeler River project, and borders the Moon Lake South project. Winter access to the property can be gained from the north via the Fox Lake road and from the south via the Cree Lake road. The property is underlain by Athabasca Group sandstones, which in turn overlie metamorphic rocks of the Wollaston and Mudjatik Domains. The depth to the unconformity is between 415 and 515 metres.
 
During the first quarter of 2024, a SWML EM survey was completed on the property to better define basement conductivity associated with the CR-3 conductive trend near the adjacent Moon Lake South property and generated targets for the fall drill program, which remained in progress at the end of the third quarter.
 
As of September 30, 2024, a total of 1,128 metres have been drilled in two completed holes. The first two holes of the program failed to explain the conductive response outlined in the 2024 SWML EM survey, and were interpreted to have overshot the graphitic sediments typically associated with the CR-3. The 2024 exploration drilling program was completed in October 2024, and core samples collected during the drill program have been submitted to the SRC geoanalytical lab, with results expected by the end of the fourth quarter.
 
Johnston Lake
 
During the first quarter of 2024, a Small Moving Loop Electromagnetic (‘SML EM’) survey was completed on the Company’s 100%-owned Johnston Lake property to better define basement conductivity associated with the MJ1 conductive trend and generate targets for future drill testing on the project. The final processed data set was received early in the second quarter of 2024, and several of the conductivity anomalies identified from the survey were targeted as part of the 2024 Johnston Lake exploration drilling program, which began in June and was completed in August.
 
The 2024 Johnston Lake exploration drilling program consisted of total of 6,228 metres drilled in eight completed holes, and one abandoned hole. In addition to testing conductivity anomalies along the MJ-1 trend, the program sought to evaluate the extents of significant geochemical anomalies identified from historical drilling. Although significant structural disruption, alteration and elevated radioactivity indicative of a potentially mineralizing system, were identified in each hole, no significant mineralization grading greater than 0.05% eU3O8 was observed from radiometric probing. Assay samples were submitted to the SRC lab in late August, with results anticipated during the fourth quarter.
 
Moon Lake South
 
The Moon Lake South property is located adjacent, to the west, of the Wheeler River project and north of Denison’s 100% owned Crawford Lake project, approximately 30 kilometres northwest of Cameco’s Key Lake Operation. The Moon Lake South project is a joint venture between Denison, which holds a 75% interest in the property, and CanAlaska Uranium Ltd., which holds the remaining 25% interest. Denison is the project operator.
 
The 2024 winter exploration program consisted of eight completed diamond drill holes totalling 5,634 metres, designed to evaluate the potential to expand the footprint of high-grade uranium mineralization discovered in 2023 drill hole MS-23-10A, and to test conductivity anomalies identified from SWML EM surveys completed in the area to identify additional mineralization along strike of known mineralized occurrences identified in 2021.
 
Low-grade uranium mineralization was encountered in three of the eight holes completed during the winter program. MS-23-23 tested the unconformity 32 metres due west of the mineralization discovered in 2023 drill hole MS-23-10A (2.46% U3O8 over 8.0 metres), intersecting uranium mineralization at the sub-Athabasca unconformity grading 0.12% eU3O8 over 0.6 metres. Drill hole MS-24-25, drilled to target the unconformity 115 metres due west of MS-23-10A, intersected uranium mineralization grading 0.12% eU3O8 over 0.4 metres, hosted at the contact between a fault zone and a graphitic pelite.
 
 
 
 17
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
The third mineralized intersection was returned from hole MS-24-27, which was drilled to target the unconformity approximately 915 metres northeast of MS-23-10A, and 250 metres along strike to the southwest of low-grade mineralization intersected in 2021 drill hole MS-21-06. MS-24-27 intersected mineralization grading 0.08% eU3O8 over 0.2 metres, associated with the contact between a graphitic pelite and an underlying granitic unit, lying approximately 45 metres below the unconformity.
 
Additionally, the SWML EM survey that was initiated in the fourth quarter of 2023 was completed in February 2024. The preliminary data is of good quality and appears to have successfully resolved the position of the CR-3 conductor in the survey area. The 2023/2024 SWML EM survey results will be integrated with other geophysical, geological, and geochemical data in the area to guide future exploration activities on the property.
 
A supplementary drill program was initiated during the third quarter, designed to test strong conductivity anomalies identified from the 2024 SWML EM survey, interpreted to represent the CR-3 conductor in the vicinity of three mineralized showings along strike to the northeast. The drill program consisted of three diamond drill holes totalling 1,086 metres. Two of the holes failed to explain the conductive response outlined from the 2024 SML EM survey. While the third hole of the program encountered elevated radioactivity approximately 90 cm below the unconformity, the results of downhole gamma logging did not indicate mineralization that exceeded a 0.05% eU3O8 cutoff. Drilling was completed during the first week of October, and select samples were sent to the geoanalytical lab at SRC in Saskatoon. Receipt of analytical results is anticipated during the fourth quarter.
 
Waterfound
 
Waterfound is operated by Orano Canada. Denison has an effective 24.68% ownership interest in the project, including its 11.78% direct interest and a 12.90% indirect interest from its 50% ownership of JCU.
 
The 2024 exploration diamond drill program was designed to focus on the D-1 North conductor, which hosts the Crocodile and Alligator Zones, in an area where, the conductor takes a significant bend from an E-W orientation to NNE-SSW. Ten drill holes were completed during the 2024 winter drilling program for a total of 6,136 metres. Elevated radioactivity was encountered in each hole completed during the winter drilling program.
 
The summer exploration drilling program began in early June and was completed in early July, during which an additional 2,516 metres were drilled in four completed holes, bringing the total for the year to 8,652 metres drilled in 14 completed holes. Low-grade, basement-hosted mineralization was encountered in three of the four holes completed during the 2024 summer drilling program. Assay results from drill core samples collected during the summer exploration program are pending.
 
A small direct current resistivity survey was completed over the eastern portion of the D-1 North trend to identify resistivity low anomalies that may be indicative of enhanced hydrothermal alteration related to a potentially mineralizing system. The survey was suspended in early April due to deteriorating conditions related to the spring thaw and resumed in July and was completed in early August.
 
Hatchet Lake
 
Prior to the closing of the first phase of the earn-in option with Foremost on October 4, 2024 (see Denison press releases dated September 24, 2024 and October 7, 2024), Hatchet Lake was a joint venture between Denison Mines Corp. (70.15%) and Eros Resources Corp (29.85%). With the completion of the first option phase of the Foremost Transaction, Foremost has acquired a 14.03% stake in the Hatchet Lake joint venture, and Denison’s ownership interest has decreased to 56.12%. In addition, Foremost has assumed operatorship of the project.
 
The Hatchet Lake Project consists of nine mineral dispositions totalling 10,212 hectares. The property is split into two non-contiguous claim blocks: the Richardson grid, which consists of four claims totalling 5,328 hectares; and the Hatchet South claim block, which consists of five Claims totalling 4,884 hectares. The Richardson block hosts multiple mineralized drill holes, with grades of up to 1.52% U3O8, and covers the strike extension of Cameco’s Richardson grid, where historical drilling has identified multiple high-grade unconformity-associated uranium intercepts. The Hatchet South claim block contains the Tuning Fork Grids, where previous drilling has identified low-grade uranium mineralization grading up to 0.1% U3O8, along with significant copper, arsenic, and boron enrichment.
 
In 2024, a small diamond drilling program was completed at Hatchet Lake to test the extent of previously identified geochemical anomalies that are associated with significant structure and alteration. A total of 884 metres was drilled in four diamond drill holes, two holes along the Richardson Trend and two holes at Tuning Fork. Significant alteration and structure was observed in each of the four completed holes. Geochemical samples collected during the program have been submitted to the SRC laboratory, with analytical results expected during the fourth quarter.
 
 
 
 18
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
GENERAL AND ADMINISTRATIVE EXPENSES
 
Total general and administrative expenses were $3,552,000 and $10,877,000, respectively, during the three and nine months ended September 30, 2024 (September 30, 2023 – $2,999,000 and $9,462,000). These costs are mainly comprised of head office salaries and benefits, share based compensation, audit and regulatory costs, legal fees, investor relations expenses, and all other costs related to operating a public company with listings in Canada and the United States. The increase in general and administrative expenses during the three and nine months ended September 30, 2024, was predominantly driven by an increase in share based compensation and head office salaries and benefits due to increases in headcount.
 
OTHER INCOME AND EXPENSE
 
During the three and nine months ended September 30, 2024, the Company recognized a net other expense of $10,669,000 and $20,347,000, respectively (September 30, 2023 – net other income of $68,064,000 and $90,262,000).
 
The main drivers of the other income/expense are as follows:
 
Fair value losses on uranium investments
 
During 2021, the Company acquired 2,500,000 pounds of U3O8 at a weighted average cost of $36.67 (US$29.66) per pound U3O8 (including purchase commissions of $0.05 (US$0.04) per pound U3O8) to be held as a long-term investment to strengthen the Company’s balance sheet and potentially enhance its ability to access project financing in support of the future advancement and/or construction of Wheeler River. Given that this material is held for long-term capital appreciation, the Company’s holdings are measured at fair value, with changes in fair value between reporting dates recorded through profit and loss. In 2023, the Company sold 200,000 pounds of U3O8 at a weighted average price of $99.50 (US$73.38) per pound U3O8. During the second quarter of 2024, the Company sold an additional 100,000 pounds of U3O8 at a weighted average price of $135.98 (US$100.00) per pound U3O8. As at September 30, 2024, the Company held 2,200,000 pounds of U3O8.
 
During the three months ended September 30, 2024, the spot price of U3O8 decreased from $117.03 (US$85.50) per pound U3O8 as at June 30, 2024, to $110.35 (US$81.75) per pound U3O8 at September 30, 2024, resulting in a fair value of the Company’s uranium investments of $242,780,000 and mark-to-market loss for the three months ended September 30, 2024 of $14,680,000 on the Company’s uranium holdings (September 30, 2023 – mark to market gain of $63,089,000). During the nine months ended September 30, 2024, the spot price of U3O8 decreased from $120.35 (US$91.00) per pound U3O8 as at December 31, 2023, to $110.35 (US$81.75) per pound U3O8 at September 30, 2024, resulting in mark-to-market loss for the nine months ended September 30, 2024 of $20,437,000 on the Company’s uranium holdings (September 30, 2023 – gains of $85,910,000) including a realized gain on sale of $9,950,000 (US$7,050,000) from the second quarter uranium sales.
 
Fair value gains/losses on portfolio investments
 
During the three and nine months ended September 30, 2024, the Company recognized a gain of $3,289,000 and a loss of $135,000, respectively, on portfolio investments carried at fair value (September 30, 2023 – gains of $4,530,000 and $2,645,000). Gains and losses on investments carried at fair value are determined by reference to the closing share price of the related investee at the end of the period, or, as applicable, immediately prior to disposal.
 
Fair value gains/losses on F3 Debentures
 
During the year ended December 31, 2023, the Company completed a $15 million strategic investment in F3 Uranium Corp. (‘F3’) in the form of unsecured convertible debentures, which carry a 9% coupon and were to be convertible at Denison’s option into common shares of F3 at a conversion price of $0.56 per share. During the third quarter, F3 completed an arrangement, whereby F3 transferred 17 prospective uranium exploration projects to F4 Uranium (‘F4’). As a result of the spin out, for the conversion price of $0.56, Denison will now receive one share of F3 and 1/10 of a share of F4. F3 has the right to pay up to one third of the quarterly interest payable by issuing common shares. F3 will also have certain redemption rights on or after the third anniversary of the date of issuance of the Debentures and/or in the event of an F3 change of control. As a result of the Debentures’ conversion and redemption features, the contractual cash flow characteristics of these instruments do not solely consist of the payment of principal and interest and therefore the debentures are accounted for as a financial asset at fair value through profit and loss.
 
During the three and nine months ended September 30, 2024, the Company recognized mark-to-market gain of $310,000 and a loss of $1,125,000, respectively (September 30, 2023 – $nil and $nil) on its investments in the debentures mainly due to a decrease in the F3 share price between December 31, 2023 and September 30, 2024, which reduced the value of the debenture’s embedded conversion option.
 
 
 
 19
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
Gain on receipt of proceeds from Uranium Industry a.s.
 
In January 2022, the Company executed a Repayment Agreement (‘RA’) pursuant to which the parties negotiated the repayment of the debt owing from Uranium Industry a.s. (‘UI’) to Denison in connection with the Company’s sale of its mining assets and operations located in Mongolia to UI in 2015 for upfront cash consideration as well as the rights to receive additional contingent consideration. Under the terms of the RA, UI has agreed to make scheduled payments of the amounts owing from the sale of the Mongolia operations through a series of quarterly installments and annual milestone payments, until December 31, 2025. The total amount due to Denison under the RA, including amounts received to date, is approximately US$16,000,000, inclusive of additional interest to be earned over the term of the agreement at a rate of 6.5% per annum. To date, the Company has collected US$8,200,000 of the amounts due under the RA. The RA includes customary covenants and conditions in favour of Denison, including certain restrictions on UI’s ability to take on additional debt, in consideration for Denison’s deferral of enforcement of the arbitration award while UI is in compliance with its obligations under the RA.
 
During the three and nine months ended September 30, 2024, the Company received US$600,000 and US$900,000, respectively, from UI (September 30, 2023 – US$200,000 and US$600,000), of which a portion relates to reimbursement of legal and other expenses incurred by Denison. During the three and nine months ended September 30, 2024, as a result of the payments received, the Company recorded gains related to the Mongolia sale receivable of $801,000 and $1,197,000, respectively (September 30, 2023 – $267,000 and $802,000). This receivable is recorded at fair value at each period end (September 30, 2024 and December 31, 2023 – $nil).
 
Foreign exchange losses/gains
 
During the three and nine months ended September 30, 2024, the Company recognized a foreign exchange loss of $308,000 and a gain of $803,000, respectively (September 30, 2023 – gains of $341,000 and $150,000). The foreign exchange gain is predominantly due to the impact of the increase in the US dollar to Canadian dollar exchange rate during the first half of 2024 on US dollar cash and accounts receivable balances.
 
EQUITY SHARE OF INCOME FROM JOINT VENTURES
 
During the three and nine months ended September 30, 2024, the Company recorded its equity share of loss from JCU of $604,000 and $1,732,000, respectively (September 30, 2023 – $459,000 and $3,814,000). The Company records its share of income or loss from JCU one month in arrears, based on the most available financial information, adjusted for any subsequent material transactions that have occurred.
 
 
LIQUIDITY AND CAPITAL RESOURCES
 
Cash and cash equivalents were $105,933,000 at September 30, 2024 (December 31, 2023 – $131,054,000).
 
The decrease in cash and cash equivalents of $25,121,000 was due to net cash used in operations of $32,368,000, partially offset by net cash provided by investing activities of $5,446,000 and cash provided by financing activities of $1,045,000, as well as a foreign exchange effect on cash and cash equivalents of $756,000.
 
Net cash used in operating activities of $32,368,000 was primarily due to net loss for the period, and adjustments for non-cash items, including fair value adjustments.
 
Net cash provided by investing activities of $5,446,000 was primarily due to proceeds on disposal of investments in uranium in the second quarter, partially offset by the Company’s incremental investment in JCU, an increase in property, plant & equipment relating to long lead items for the Wheeler River project, and a decrease in restricted cash due to the Company’s funding the Elliot Lake reclamation trust fund.
 
Net cash provided by financing activities of $1,045,000 was mainly due to the proceeds related to the issuance of 1,032,334 shares upon the exercise of employee stock options.
 
 
 
 
 20
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
Use of Proceeds
 
2021 ATM Program Financing
 
As disclosed in the Company’s prospectus supplement to the 2021 Base Shelf Prospectus dated September 28, 2021 (‘September 2021 Prospectus Supplement’), the net proceeds raised under the 2021 ATM Program were expected to be utilized to potentially fund Wheeler River evaluation and detailed project engineering, long lead project construction items, as well as general, corporate and administrative expenses, subject to the actual amount raised. The Company’s use of proceeds from this offering was in line with that disclosed in the September 2021 Prospectus Supplement. The 2021 ATM Program was terminated on October 11, 2023.
 
October 2023 Financing
 
As disclosed in the Company’s prospectus supplement to the 2021 Base Shelf Prospectus dated October 11, 2023 (‘October 2023 Prospectus Supplement’), the net proceeds of the October 2023 equity financing are expected to be utilized to fund the advancement of the Phoenix project through the procurement of long lead items (including associated engineering, testing, and design), exploration and evaluation expenses, as well as general, corporate and administrative expenses. During the period from the closing of the financing in October 2023 to September 30, 2024, the Company’s use of proceeds from this offering was in line with that disclosed in the October 2023 Prospectus Supplement.
 
Revolving Term Credit Facility
 
On December 21, 2023, the Company entered into an agreement with the Bank of Nova Scotia (‘BNS’) to extend the maturity date of the Company’s credit facility to January 31, 2025 (the ‘Credit Facility’). Under the Credit Facility, the Company has access to letters of credit of up to $23,964,000, which is fully utilized for non-financial letters of credit in support of reclamation obligations. All other terms of the Credit Facility (tangible net worth covenant, pledged cash, investments amount and security for the facility) remain unchanged by the amendment – including a requirement to provide $7,972,000 in cash collateral on deposit with BNS to maintain the current letters of credit issued under the Credit Facility.
 
TRANSACTIONS WITH RELATED PARTIES
 
Korea Electric Power Corporation (‘KEPCO’)
Denison and KHNP Canada Energy Ltd. (‘KHNP Canada’) (which is an indirect subsidiary of KEPCO) are parties to a Strategic Relationship Agreement, which provides for a long-term collaborative business relationship between the parties and includes a right of KHNP Canada to nominate one representative to Denison’s Board of Directors provided that its shareholding percentage is at least 5%.
 
KHNP Canada is also the majority member of the Korea Waterbury Uranium Limited Partnership (‘KWULP’). KWULP is a consortium of investors that holds the non-Denison owned interests in Waterbury Lake Uranium Corporation and Waterbury Lake Uranium Limited Partnership, entities whose key asset is Waterbury.
 
 
 
 
 
 
 21
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
COMPENSATION OF KEY MANAGEMENT PERSONNEL
 
Key management personnel are those persons having authority and responsibility for planning, directing and controlling the activities of the Company, directly or indirectly. Key management personnel include the Company’s executive officers, vice-presidents, and members of its Board of Directors.
 
The following compensation was awarded to key management personnel:
 
 
 
Three Months Ended
 
Nine Months Ended
 
 
September 30,
 
September 30,
 
September 30,
 
September 30,
(in thousands)
 
2024
 
2023
 
2024
 
2023
 
 
 
 
 
 
 
 
 
Salaries and short-term employee benefits
$
(895)
$
(512)
$
(3,503)
$
(2,156)
Share-based compensation
 
(814)
 
(544)
 
(2,467)
 
(2,017)
 
$
(1,709)
$
(1,056)
$
(5,970)
$
(4,173)
 
The increase in salaries and short-term employee benefits awarded to key management is predominantly driven by an increase in headcount. The group of key management employees expanded from five in 2023 to nine in 2024 following internal promotions to fill the following roles: Vice President Technical Services and Project Evaluation, Vice President Environment, Sustainability & Regulatory, Vice President Exploration, and Vice President Human Resources.
 
OFF-BALANCE SHEET ARRANGEMENTS
 
The Company does not have any off-balance sheet arrangements.
 
OUTSTANDING SHARE DATA
 
Common Shares
 
At November 7, 2024, there were 892,617,600 common shares issued and outstanding and a total of 905,572,686 common shares on a fully-diluted basis.
 
Stock Options and Share Units
 
At November 7, 2024, there were 5,722,000 stock options, and 7,233,086 share units outstanding.
 
DISCONTINUED OPERATIONS
 
Closed Mine Services
 
At the end of August 2023, the Company’s long-term third-party closed mines services contract came to an end. With the termination of this contract, the Company determined that it would cease providing third-party care and maintenance services and will no longer earn revenue from Closed Mine services. The Company is now solely focused on care and maintenance of its own legacy mine sites.
 
 
 
 
 
 
 
 22
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
OUTLOOK FOR 2024
 
Refer to the Company’s annual MD&A for the year ended December 31, 2023 and the MD&A for the three and six months ended June 30, 2024 for a detailed discussion of the previously disclosed 2024 budget and outlook.
 
During the third quarter of 2024, the Company increased its outlook for exploration expenditures by $818,000 due to a supplemental exploration drilling program for the Crawford Lake and Moon Lake South properties. In addition, the Company decreased its outlook for evaluation expenditures by $5,698,000 predominantly due to the deferral of certain aspects of detailed design engineering and long lead item procurement into 2025. Finally, the outlook for the recovery from the corporate administration and other segment increased by $1,005,000 predominantly due to higher interest income earned on the Company’s cash balances due to higher than budgeted interest rates, slightly offset by increased employee costs.
 
(in thousands)
 
PREVIOUS 2024
OUTLOOK
CURRENT 2024 OUTLOOK
Actual to
September 30, 2024(2)
Mining Segment
 
 
 
 
Development & Operations
 
(4,986)
(4,986)
(3,813)
Exploration
 
(10,159)
(10,977)
(9,466)
Evaluation
 
(53,550)
(47,852)
(25,261)
JCU Cash Contributions
 
(3,768)
(3,768)
(2,615)
 
 
(72,463)
(67,583)
(41,155)
Corporate and Other Segment
 
 
 
 
Corporate Administration & Other
 
405
1,410
173
 
 
405
1,410
173
Total(1)
 
$                        (72,058)
$ (66,173)
$                        (40,982)
Notes
1.
Only material operations shown.
2.
The budget is prepared on a cash basis. As a result, actual amounts represent a non-GAAP measure. Compared to segment loss as presented in the Company’s unaudited interim consolidated financial statements for the nine months ended September 30, 2024, actual amounts reported above includes capital additions of $1,776,000, JCU contributions of $2,615,000, $1,222,000 in repayments from UI, and excludes $3,966,000 net impact of non-cash items and other adjustments.
 
 
ADDITIONAL INFORMATION
 
QUALIFIED PERSON
 
Chad Sorba, P.Geo., Denison’s Vice President Technical Services & Project Evaluation, who is a ‘Qualified Person’ within the meaning of this term in has prepared and/or reviewed and confirmed the scientific and technical disclosure pertaining to the Company’s evaluation programs.
 
Andy Yackulic, P.Geo., Denison’s Vice President Exploration, who is a ‘Qualified Person’ within the meaning of this term in NI 43-101, has prepared and/or reviewed and confirmed the scientific and technical disclosure pertaining to the Company’s exploration programs.
 
For more information regarding each of Denison’s material projects discussed herein, you are encouraged to refer to the applicable technical reports available on the Company’s website and under the Company’s profile on SEDAR+ (www.sedarplus.ca) and EDGAR (www.sec.gov/edgar.shtml):
 
For the Wheeler River project, the ‘Technical Report for the Wheeler River project titled ‘NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada’ with an effective date of June 23, 2023;
 
For the Waterbury Lake project, ‘Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada’ with an effective date of October 30, 2020;
 
For the Midwest project, ‘Technical Report with an Updated Mineral Resource Estimate for the Midwest Property, Northern Saskatchewan, Canada’ dated March 26, 2018; and
 
 
 
 
 23
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
 
For the McClean Lake project, (A) the ‘Technical Report on the Denison Mines Inc. Uranium Properties, Saskatchewan, Canada’ dated November 21, 2005, as revised February 16, 2006, (B) the ‘Technical Report on the Sue D Uranium Deposit Mineral Resource Estimate, Saskatchewan, Canada’ dated March 31, 2006, and (C) the ‘Technical Report on the Mineral Resource Estimate for the McClean North Uranium Deposits, Saskatchewan’ dated January 31, 2007.
 
ASSAY PROCEDURES AND DATA VERIFICATION
 
The Company reports preliminary radiometric equivalent grades, derived from a calibrated down-hole total gamma probe, during or upon completion of its exploration programs and subsequently reports definitive U3O8 assay grades following sampling and chemical analysis of the mineralized drill core. Uranium assays are performed on split core samples by the Saskatchewan Research Council Geoanalytical Laboratories using an ISO/IEC 17025:2005 accredited method for the determination of U3O8 weight %. Sample preparation involves crushing and pulverizing core samples to 90% passing -106 microns. The resultant pulp is digested using aqua-regia and the solution analyzed for U3O8 weight % using ICP-OES. Geochemical results from composite core samples are reported as parts per million (‘ppm’) obtained from a partial HNO3:HCl digest with an ICP-MS finish. Boron values are obtained through NaO2/NaCO3 fusion followed by an ICP-OES finish. All data are subject to verification procedures by qualified persons employed by Denison prior to disclosure. For further details on Denison’s sampling, analysis, quality assurance program and quality control measures and data verification procedures, please see Denison's Annual Information Form dated March 28, 2024, available on the Company’s website and filed under the Company's profile on SEDAR+ (www.sedarplus.ca) and in its Form 40-F available on EDGAR at www.sec.gov/edgar.shtml.
 
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
 
Certain information contained in this MD&A constitutes ‘forward-looking information’, within the meaning of the applicable United States and Canadian legislation concerning the business, operations, and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as ‘plans’, ‘expects’, ‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’, or the negatives and/or variations of such words and phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’, ‘be achieved’ or ‘has the potential to’.
 
In particular, this MD&A contains forward-looking information pertaining to the following: the results of, and estimates and assumptions within, the Phoenix FS and the Gryphon PFS Update, including the estimates of Denison's mineral reserves and mineral resources, and statements regarding anticipated budgets, fees, expenditures and timelines; Denison’s outlook, plans and objectives for 2024 and beyond; exploration, development and expansion programs, plans and objectives, including FEED, detailed design engineering, long lead procurement, field program optimization studies, and other project planning programs; statements regarding Denison’s EA and EIS status, plans and objectives and expectations with respect to Denison’s required licensing and permitting; expectations regarding Denison’s community engagement activities and related agreements with interested parties; expectations with respect to the FFT; Denison’s land position; expectations regarding Denison’s joint venture ownership interests and the continuity of its agreements with its partners; expectations regarding uranium mining on the McClean Lake property, including anticipated timing and budgets; results of the ISR field test program at Midwest and the Concept Study, the interpretations thereof and expectations therefor therefore including the potential for a PEA; expectations regarding the toll milling of Cigar Lake ores, including projected annual production volumes; expectations regarding agreements with third parties, including the MBA, CBA, Sustainable Communities Investment Agreement, the KLP earn-in agreement with Grounded Lithium, the Foremost Transaction, the F3 debentures, and the RA with UI and payments thereunder; Denison’s expectations with respect the exploration and evaluation of the KLP, including a potential PFS; Denison’s plans with respect to its physical uranium holdings; and the annual operating budget and capital expenditure programs, estimated exploration and development expenditures and reclamation costs and Denison's share of same. Statements relating to ‘mineral reserves’ or ‘mineral resources’ are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.
 
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, the results of the Denison’s studies, including the Phoenix FS, and field work, may not be maintained after further testing or be representative of actual mining plans for the Phoenix deposit after further design and studies are completed. In addition, Denison may decide or otherwise be required to discontinue testing, evaluation and development work at Wheeler River or other projects or its exploration plans if it is unable to maintain or otherwise secure the necessary resources (such as testing facilities, capital funding, regulatory approvals, etc.) or operations are otherwise affected by regulatory or public health restrictions or requirements.
 
Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed under the heading ‘Risk Factors’ in Denison’s Annual Information Form available on SEDAR+ and EDGAR. These factors are not, and should not be construed as being, exhaustive.
 
 
 
 24
 
 
   MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this MD&A is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this MD&A. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this MD&A to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.
 
Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Mineral Resources and Proven and Probable Mineral Reserves: As a foreign private issuer reporting under the multijurisdictional disclosure system adopted by the United States, the Company has prepared this MD&A in accordance with Canadian securities laws and standards for reporting of mineral resource estimates, which differ in some respects from United States standards. In particular, and without limiting the generality of the foregoing, the terms “measured mineral resources,” “indicated mineral resources,” “inferred mineral resources,” and “mineral resources” used or referenced in this MD&A are Canadian mineral disclosure terms as defined in accordance with NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum Standards for Mineral Resources and Mineral Reserves, Definitions and Guidelines, May 2014 (the ‘CIM Standards’). The Securities and Exchange Commission (the “SEC”) recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” and its definitions of “proven mineral reserves” and “probable mineral reserves” are “substantially similar” to the corresponding definitions under the CIM Standards. However, investors are cautioned that there are differences between the definitions under the United States Securities Exchange Act of 1934, as amended (the ‘U.S. Exchange Act’) and the CIM Standards definition. Accordingly, there is no assurance any mineral reserves or mineral resources that Denison may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had Denison prepared the mineral reserve or mineral resource estimates under the standards adopted under the U.S. Exchange Act. For the above reasons, information contained in the MD&A may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. Additionally, investors are cautioned that “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic feasibility. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies, except in limited circumstances. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. The term “resource” does not equate to the term “reserves”. Investors should not assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. Investors are also cautioned not to assume that all or any part of an inferred mineral resource exists or is economically mineable.
 
 
 
 
25
  Exhibit 99.3
 
FORM 52-109F2
CERTIFICATION OF INTERIM FILINGS
 
I, David Cates, President and Chief Executive Officer of Denison Mines Corp., certify the following:
 
1.
Review: I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Denison Mines Corp. (the "issuer") for the interim period ended September 30, 2024.
 
2.
No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
 
3.
Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
 
4.
Responsibility: The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.
 
5.
Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings
 
(a)
designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
 
(i)
material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
 
(ii)
information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
 
(b)
designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.
 
5.1
Control framework: The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is Internal Control – Integrated Framework (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).
 
5.2
ICFR: Not applicable.
 
5.3
Limitation on scope of design: Not applicable.
 
6.
Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on July 1, 2024 and ended on September 30, 2024 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.
 
Date: November 7, 2024
 
(signed) "David Cates"  
Name:          
David Cates
Title:            
President and Chief Executive Officer
 
 Exhibit 99.4
 
FORM 52-109F2
CERTIFICATION OF INTERIM FILINGS
 
I, Elizabeth Sidle, Vice President Finance and Chief Financial Officer of Denison Mines Corp., certify the following:
 
1.
Review: I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Denison Mines Corp. (the "issuer") for the interim period ended September 30, 2024.
 
2.
No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
 
3.
Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
 
4.
Responsibility: The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.
 
5.
Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings
 
(a)
designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
 
(i)
material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
 
(ii)
information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
 
(b)
designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.
 
5.1
Control framework: The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is Internal Control – Integrated Framework (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).
 
5.2
ICFR: Not applicable.
 
5.3
Limitation on scope of design: Not applicable.
 
6.
Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on July 1, 2024 and ended on September 30, 2024 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.
 
Date: November 7, 2024
 
(signed) "Elizabeth Sidle"
Name:         
Elizabeth Sidle
Title:            
Vice President Finance and Chief Financial Officer
 
 
Exhibit 99.5
 
 
Denison Mines Corp.
1100 – 40 University Ave
Toronto, ON M5J 1T1
www.denisonmines.com
 

PRESS RELEASE 
 
 
Denison Reports Financial and Operational Results for Q3’2024, Including
Positive Progress on Phoenix Engineering and Regulatory Review
 
Toronto, ON – November 7, 2024. Denison Mines Corp. (‘Denison’ or the ‘Company’) (TSX: DML, NYSE American: DNN) today filed its Condensed Consolidated Financial Statements and Management’s Discussion & Analysis (‘MD&A’) for the three and nine months ended September 30, 2024. Both documents will be available on the Company’s website at www.denisonmines.com, SEDAR+ (at www.sedarplus.ca) and EDGAR (at www.sec.gov/edgar.shtml). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated.
 
David Cates, President and CEO of Denison commented, “Our third quarter report includes an update on the positive progress of our engineering and regulatory approval efforts for our planned Phoenix In-Situ Recovery (‘ISR’) uranium mining operation. We continue to rapidly advance detailed design engineering efforts and achieved completion of 45% of total engineering by the end of the third quarter. Long-lead procurement efforts continued to ramp up. Currently, $21 million in milestone payments or commitments have been made for items included in our estimates of initial project capex, with several additional procurement packages in progress.
 
On the regulatory side, we are pleased to report that substantially all outstanding information requests (‘IRs’) from the Canadian Nuclear Safety Commission’s (‘CNSC’) review of the Wheeler River draft Environmental Impact Statement (‘EIS’) have been resolved, and the Federal review process is nearing completion. Given this positive progress with the Federal review, we have opted to submit a final Provincial EIS to the Saskatchewan Ministry of Environment to advance the process of obtaining formal approval from the Province.
 
Beyond Wheeler River, we are pleased with the progress of the SABRE program at the McClean North deposit, which remains on track for production in 2025. Our team is also active on our portfolio of other development and exploration projects, with study work advancing on both the Midwest project and the Tthe Heldeth Túé ('THT') deposit, with the potential to result in updated or new technical studies in the coming months.
 
Also notable is our recent transaction with Foremost Clean Energy, which involves Denison optioning up to 70% of its interests in a portfolio of 10 exploration properties. The transaction was designed to amplify our exposure to future discovery by encouraging exploration on – and retaining significant ownership of - properties that would otherwise have received little attention from Denison with our current focus on development and mining-stage projects.”
 
 Q3 2024 MD&A Highlights
 
Signing of Wheeler River Benefit Agreements with Kineepik Métis Local #9 and the Village of Pinehouse Lake
 
In July 2024, Denison announced the signing of a Mutual Benefits Agreement (‘MBA’) with Kineepik Métis Local #9 (‘KML’), and a Community Benefit Agreement (‘CBA’) with the northern Village of Pinehouse Lake (‘Pinehouse’), in support of the development and operation of Denison’s 95% owned Wheeler River Project.
 
The MBA acknowledges that the project is located within KML’s Land and Occupancy Area in northern Saskatchewan and provides KML’s consent and support to advance the project. Additionally, the MBA recognizes that the development and operation of the project can support KML in advancing its social and economic development aspirations while mitigating the impacts on the local environment and KML members. The MBA provides KML and its Métis members an important role in environmental monitoring and commits to the sharing of benefits from the successful operation of the project – including benefits from community investment, business opportunities, employment and training opportunities, and financial compensation.
 
The CBA acknowledges that Pinehouse is the closest residential community to the project by road, which relies on much of the same regional infrastructure that Denison will rely on as it advances the project. Pinehouse has provided its consent and support for the project, while Denison, on behalf of the Wheeler River Joint Venture, is committed to helping Pinehouse develop its own capacity to take advantage of economic and other development opportunities in connection with the advancement and operation of the project.
 
 
 
 
Continued Advancement of Phoenix Engineering and Federal Regulatory Review of the Draft EIS
 
During the third quarter, the Company continued to focus its efforts on the advancement of the Phoenix project towards a final investment decision in support of its objective to achieve first production by 2027 / 2028, including:
 
Phoenix engineering activities are advancing within expected timelines to support a financial investment decision (‘FID’) by mid-2025. Total engineering completion at end of the third quarter was 45%, supported by finalization of process design, piping and instrumentation diagrams (P&ID’s), hazard and operability studies (‘HAZOPs’), as well as the selection of major process equipment and electrical distribution infrastructure.
 
The review of the draft EIS continues to advance and Denison has been in regular contact with CNSC staff to support the conclusion of any remaining IRs. In September 2024, Denison received confirmation that the majority of outstanding IRs have been resolved, which suggests that the Federal review process is nearing completion.
 
Option of Non-Core Exploration Projects to Foremost Clean Energy Ltd.
 
In September 2024, Denison executed an option agreement with Foremost Clean Energy Ltd (‘Foremost’), which grants Foremost an option to acquire up to 70% of Denison's interests in 10 non-core uranium exploration properties (collectively, the ‘Foremost Transaction’). Pursuant to the Foremost Transaction, Foremost would acquire such total interests upon completion of a combination of direct payments to Denison and funding of exploration expenditures with an aggregate value of up to approximately $30 million. The Foremost Transaction provides the following benefits to Denison:
 
Collaboration with Foremost is expected to increase exploration activity on a portfolio of non-core Denison properties with the potential to increase the probability of discovery within Denison's vast Athabasca Basin exploration portfolio.
 
In October 2024, Denison received an upfront payment in Foremost common shares (representing a ~19.95% ownership interest in Foremost). If Foremost completes the remaining two phases of the Foremost Transaction Denison will receive further cash and/or common share milestone payments of $4.5 million and Foremost will fund $20 million in project exploration expenditures.
 
In addition to becoming Foremost’s largest shareholder, Denison retains direct interests in the optioned exploration properties and also secures certain strategic pre-emptive rights to participate in future exploration success from the optioned properties.
 
About Denison
 
Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories. Denison’s common shares are listed on the Toronto Stock Exchange (the ‘TSX’) under the symbol ‘DML’ and on the NYSE American exchange under the symbol ‘DNN’.
 
Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. In mid-2023, the Phoenix FS was completed for the Phoenix deposit as an ISR mining operation, and an update to the previously prepared 2018 Pre-Feasibility Study (‘PFS’) was completed for Wheeler River’s Gryphon deposit as a conventional underground mining operation. Based on the respective studies, both deposits have the potential to be competitive with the lowest cost uranium mining operations in the world. Permitting efforts for the planned Phoenix ISR operation commenced in 2019 and have advanced significantly, with licensing in progress and a draft Environmental Impact Study (‘EIS’) submitted for regulatory and public review in October 2022.
 
Denison’s interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake Joint Venture (‘MLJV’), which includes unmined uranium deposits (planned for extraction via the MLJV’s SABRE mining method starting in 2025) and the McClean Lake uranium mill (currently utilizing a portion of its licensed capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Joint Venture (‘MWJV’)’s Midwest Main and Midwest A deposits, and a 69.44% interest in the Tthe Heldeth Túé (‘THT’) and Huskie deposits on the Waterbury Lake Property (‘Waterbury’). The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, the Company has direct ownership interests in properties covering ~384,000 hectares in the Athabasca Basin region.
 
 
 
 
Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited (‘JCU’), Denison holds interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).
 
Technical Disclosure and Qualified Person
 
The technical information contained in this press release has been reviewed and approved by Chad Sorba, P.Geo., Denison’s Vice President Technical Services & Project Evaluation, and Andy Yackulic, P.Geo., Denison’s Vice President Exploration, who are both Qualified Persons in accordance with the requirements of NI 43-101.
 
For more information, please contact
 
 David Cates
 (416) 979-1991 ext. 362
 President and Chief Executive Officer
 
 
 
 Geoff Smith
 (416) 979-1991 ext. 358
 Vice President Corporate Development & Commercial
 
 
 
 Follow Denison on Twitter  @DenisonMinesCo
 
 
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
 
Certain information contained in this press release constitutes ‘forward-looking information’, within the meaning of the applicable United States and Canadian legislation concerning the business, operations and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as ‘plans’, ‘expects’, ‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’, or the negatives and/or variations of such words and phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’, ‘be achieved’ or ‘has the potential to’.
 
In particular, this press release contains forward-looking information pertaining to the following: projections with respect to exploration, development and expansion plans and objectives, including the scope, objectives and interpretations of FS, PFS and the Wheeler River technical de-risking process for the proposed ISR operation for the Phoenix deposit; expectations with respect to the EA, EIS and licensing and permitting for proposed operations at Wheeler River; anticipated benefits of the transaction with Foremost; expectations regarding the restart of mining operations at McClean Lake; expectations regarding the assessment of the amenability of ISR for THT and advancement of technical studies for the Midwest deposit; expectations regarding the performance of the uranium market and global sentiment regarding nuclear energy; expectations regarding Denison’s joint venture ownership interests; and expectations regarding the objectives and continuity of its agreements with third parties. Statements relating to ‘mineral reserves’ or ‘mineral resources’ are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.
 
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, the results and underlying assumptions and interpretations of the FS and PFS may not be maintained after further testing or be representative of actual conditions within the applicable deposits. In addition, Denison may decide or otherwise be required to discontinue testing, evaluation, engineering, and development work if it is unable to maintain or otherwise secure the necessary approvals or resources (such as testing facilities, capital funding, etc.). Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed in the Company’s Annual Information Form dated March 28, 2024 under the heading ‘Risk Factors’. These factors are not, and should not be, construed as being exhaustive.
 
Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this press release. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.
 
 

Denison Mines (AMEX:DNN)
Gráfico Histórico do Ativo
De Nov 2024 até Dez 2024 Click aqui para mais gráficos Denison Mines.
Denison Mines (AMEX:DNN)
Gráfico Histórico do Ativo
De Dez 2023 até Dez 2024 Click aqui para mais gráficos Denison Mines.